{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/5960"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/5960","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Flying hour cost estimating at COMNAVAIRPAC","abstract":"This thesis researched the Tactical Air (TACAIR) portion of the Commander, Naval Air Forces Pacific (COMNAVAIRPAC) historical data to determine if there is a relationship between the dollars budgeted for the Flying Hour Program and the hours actually flown under the program. An analysis of the actual FHP execution of the budget for Fiscal Year's (FYs) 1999, 2000 and 2001 was undertaken for four Continental United States (CONUS) based Carrier Air Wings (CVWs). The COMNAVAIRPAC Comptroller and Flight Hour Program Manager have sought in the past to come up with a cost prediction model for air wings funded by COMNAVAIRPAC. The intention was to find a cost estimation method that can be applied to the Inter-Deployment Training Cycle (IDTC) and the Fuel, AVDLRs and Other Maintenance costs to better analyze and report projected versus actual flight hour (FH) performance. This, in turn, would help the execution of the Program Objectives Memorandum (POM), the budget and other resource reporting, including reconciliation to the OP-20 report from the Pentagon.","abstract_html":"This thesis researched the Tactical Air (TACAIR) portion of the Commander, Naval Air Forces Pacific (COMNAVAIRPAC) historical data to determine if there is a relationship between the dollars budgeted for the Flying Hour Program and the hours actually flown under the program. An analysis of the actual FHP execution of the budget for Fiscal Year&#x27;s (FYs) 1999, 2000 and 2001 was undertaken for four Continental United States (CONUS) based Carrier Air Wings (CVWs). The COMNAVAIRPAC Comptroller and Flight Hour Program Manager have sought in the past to come up with a cost prediction model for air wings funded by COMNAVAIRPAC. The intention was to find a cost estimation method that can be applied to the Inter-Deployment Training Cycle (IDTC) and the Fuel, AVDLRs and Other Maintenance costs to better analyze and report projected versus actual flight hour (FH) performance. This, in turn, would help the execution of the Program Objectives Memorandum (POM), the budget and other resource reporting, including reconciliation to the OP-20 report from the Pentagon.","abstract_has_math":false,"creators":["Bourgeois, Paul J."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Jones, Lawrence R.","Mislick, Gregory K."],"committee_chairs":[],"committee_members":[],"year":2002,"date_issued":"2002-06","date_published":"2002-06","updated_at":"2026-11-19T06:38:38Z","subjects":["Naval aviation","Cost of operation"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/5960","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/5960","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F5960","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Jones, Lawrence R.","Mislick, Gregory K."]},{"key":"dc:creator","label":"Author","values":["Bourgeois, Paul J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:47:20Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:47:20Z"]},{"key":"dc:date.issued","label":"Date","values":["2002-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Flying Hour Program","Cost Estimation","Naval Aviation"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Naval aviation","Cost of operation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/5960"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis researched the Tactical Air (TACAIR) portion of the Commander, Naval Air Forces Pacific (COMNAVAIRPAC) historical data to determine if there is a relationship between the dollars budgeted for the Flying Hour Program and the hours actually flown under the program. An analysis of the actual FHP execution of the budget for Fiscal Year's (FYs) 1999, 2000 and 2001 was undertaken for four Continental United States (CONUS) based Carrier Air Wings (CVWs). The COMNAVAIRPAC Comptroller and Flight Hour Program Manager have sought in the past to come up with a cost prediction model for air wings funded by COMNAVAIRPAC. The intention was to find a cost estimation method that can be applied to the Inter-Deployment Training Cycle (IDTC) and the Fuel, AVDLRs and Other Maintenance costs to better analyze and report projected versus actual flight hour (FH) performance. This, in turn, would help the execution of the Program Objectives Memorandum (POM), the budget and other resource reporting, including reconciliation to the OP-20 report from the Pentagon."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/flyinghourcostes109455960"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xiv, 261 p. ;"]},{"key":"dc:title","label":"Title","values":["Flying hour cost estimating at COMNAVAIRPAC"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Jones, Lawrence R.","Mislick, Gregory K."],"dc:creator":["Bourgeois, Paul J."],"dc:date.accessioned":["2012-03-14T17:47:20Z"],"dc:date.available":["2012-03-14T17:47:20Z"],"dc:date.issued":["2002-06"],"dc:description.abstract":["This thesis researched the Tactical Air (TACAIR) portion of the Commander, Naval Air Forces Pacific (COMNAVAIRPAC) historical data to determine if there is a relationship between the dollars budgeted for the Flying Hour Program and the hours actually flown under the program. An analysis of the actual FHP execution of the budget for Fiscal Year's (FYs) 1999, 2000 and 2001 was undertaken for four Continental United States (CONUS) based Carrier Air Wings (CVWs). The COMNAVAIRPAC Comptroller and Flight Hour Program Manager have sought in the past to come up with a cost prediction model for air wings funded by COMNAVAIRPAC. The intention was to find a cost estimation method that can be applied to the Inter-Deployment Training Cycle (IDTC) and the Fuel, AVDLRs and Other Maintenance costs to better analyze and report projected versus actual flight hour (FH) performance. This, in turn, would help the execution of the Program Objectives Memorandum (POM), the budget and other resource reporting, including reconciliation to the OP-20 report from the Pentagon."],"dc:description.uri":["http://archive.org/details/flyinghourcostes109455960"],"dc:format.extent":["xiv, 261 p. ;"],"dc:identifier.uri":["https://hdl.handle.net/10945/5960"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Flying Hour Program","Cost Estimation","Naval Aviation"],"dc:subject.lcsh":["Naval aviation","Cost of operation"],"dc:title":["Flying hour cost estimating at COMNAVAIRPAC"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:38:38Z"}