{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/62693"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/62693","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"AN ANALYSIS OF IMPROVING U.S. ARMY ORGANIC INDUSTRIAL BASE DEPOT COST AND EFFICIENCY","abstract":"Department of the Army Tank Automotive Command (TACOM) depots have been in existence since the 1940s. They are a vital piece of the nation’s defense strategy, providing assurance that Army ground combat and combat support equipment can be maintained and ready for war. The depots are legally required to ensure that this capability is not lost. The cost structure that the Army depots operate under is based on a combination of funding to include overhead, direct labor and various other costs. We examined how depot costs are structured and how the costs are applied across the depot spectrum. Many depot customers have the impression that the funding structure is not set up equitably, and that they could get better value by going to the original equipment manufacturers or other vendors for their depot needs. Based on the findings of this research, we conclude that by separately funding garrison operations, the true cost can be managed more efficiently and depot customers would see a reduction in costs to their programs. To test our conclusions further, we recommend this be initiated at one of the Army's depots and the results be analyzed.","abstract_html":"Department of the Army Tank Automotive Command (TACOM) depots have been in existence since the 1940s. They are a vital piece of the nation’s defense strategy, providing assurance that Army ground combat and combat support equipment can be maintained and ready for war. The depots are legally required to ensure that this capability is not lost. The cost structure that the Army depots operate under is based on a combination of funding to include overhead, direct labor and various other costs. We examined how depot costs are structured and how the costs are applied across the depot spectrum. Many depot customers have the impression that the funding structure is not set up equitably, and that they could get better value by going to the original equipment manufacturers or other vendors for their depot needs. Based on the findings of this research, we conclude that by separately funding garrison operations, the true cost can be managed more efficiently and depot customers would see a reduction in costs to their programs. To test our conclusions further, we recommend this be initiated at one of the Army&#x27;s depots and the results be analyzed.","abstract_has_math":false,"creators":["Colley, Mark D.","Torssell, Steven M.","Webster, Paul G."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":null,"school":null,"contributors":[],"advisors":["Jones, Raymond D.","Butler, Brian, US Army TACOM"],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019-06","date_published":"2019-06","updated_at":"2026-11-19T06:39:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["27348"],"render_values":[{"text":"27348","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/62693","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/62693","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F62693","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F62693","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Jones, Raymond D.","Butler, Brian, US Army TACOM"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Colley, Mark D.","Torssell, Steven M.","Webster, Paul G."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-08-08T23:48:20Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-08-08T23:48:20Z"]},{"key":"dc:date.issued","label":"Date","values":["2019-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["27348"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Army depot","organic industrial base","Army garrison","Army depot overhead","direct and indirect labor hours"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/62693"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Department of the Army Tank Automotive Command (TACOM) depots have been in existence since the 1940s. They are a vital piece of the nation’s defense strategy, providing assurance that Army ground combat and combat support equipment can be maintained and ready for war. The depots are legally required to ensure that this capability is not lost. The cost structure that the Army depots operate under is based on a combination of funding to include overhead, direct labor and various other costs. We examined how depot costs are structured and how the costs are applied across the depot spectrum. Many depot customers have the impression that the funding structure is not set up equitably, and that they could get better value by going to the original equipment manufacturers or other vendors for their depot needs. Based on the findings of this research, we conclude that by separately funding garrison operations, the true cost can be managed more efficiently and depot customers would see a reduction in costs to their programs. To test our conclusions further, we recommend this be initiated at one of the Army's depots and the results be analyzed."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/ananalysisofimpr1094562693"]},{"key":"dc:title","label":"Title","values":["AN ANALYSIS OF IMPROVING U.S. ARMY ORGANIC INDUSTRIAL BASE DEPOT COST AND EFFICIENCY"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Jones, Raymond D.","Butler, Brian, US Army TACOM"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Colley, Mark D.","Torssell, Steven M.","Webster, Paul G."],"dc:date.accessioned":["2019-08-08T23:48:20Z"],"dc:date.available":["2019-08-08T23:48:20Z"],"dc:date.issued":["2019-06"],"dc:description.abstract":["Department of the Army Tank Automotive Command (TACOM) depots have been in existence since the 1940s. They are a vital piece of the nation’s defense strategy, providing assurance that Army ground combat and combat support equipment can be maintained and ready for war. The depots are legally required to ensure that this capability is not lost. The cost structure that the Army depots operate under is based on a combination of funding to include overhead, direct labor and various other costs. We examined how depot costs are structured and how the costs are applied across the depot spectrum. Many depot customers have the impression that the funding structure is not set up equitably, and that they could get better value by going to the original equipment manufacturers or other vendors for their depot needs. Based on the findings of this research, we conclude that by separately funding garrison operations, the true cost can be managed more efficiently and depot customers would see a reduction in costs to their programs. To test our conclusions further, we recommend this be initiated at one of the Army's depots and the results be analyzed."],"dc:description.uri":["http://archive.org/details/ananalysisofimpr1094562693"],"dc:identifier.uri":["https://hdl.handle.net/10945/62693"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Army depot","organic industrial base","Army garrison","Army depot overhead","direct and indirect labor hours"],"dc:title":["AN ANALYSIS OF IMPROVING U.S. ARMY ORGANIC INDUSTRIAL BASE DEPOT COST AND EFFICIENCY"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Army"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["27348"]},"updated_at":"2026-11-19T06:39:09Z"}