{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/62830"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/62830","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"RESTORATION AND MODERNIZATION CAPITAL IMPROVEMENTS OF ARMY INFRASTRUCTURE UNDER HQ AMC AS A VIABLE REPLACEMENT FOR MILITARY CONSTRUCTION","abstract":"This paper is intended to examine at a high level the U.S. Army Materiel Command’s (HQAMC) use of restoration and modernization (R&M) capital improvements to existing facilities as a practical alternative to demolition and new construction through military construction (MILCON). The Army has been struggling over the past few years with the ever-declining mission readiness and quality of infrastructure. Lack of MILCON funds hinders efforts to demolish outdated facilities and replace them with newer buildings that are better suited to the needs of the Army. HQAMC has addressed this predicament by investing more of its overall operations and maintenance (OMA) funding into R&M projects to restore and modernize the current inventory. This paper looked at the background of Army real property funding in terms of capital improvements, discussed how funding flowed through the chain of command, and finally, addressed the benefits and risks involved in each type of effort. The conclusion was that, given the current state of the Army budget and the lack of any large financial investments on the horizon, the use of R&M for capital improvements is not only a viable option to MILCON but in many cases should be the first choice when seeking to restore facilities to the start of a useful lifecycle.","abstract_html":"This paper is intended to examine at a high level the U.S. Army Materiel Command’s (HQAMC) use of restoration and modernization (R&amp;M) capital improvements to existing facilities as a practical alternative to demolition and new construction through military construction (MILCON). The Army has been struggling over the past few years with the ever-declining mission readiness and quality of infrastructure. Lack of MILCON funds hinders efforts to demolish outdated facilities and replace them with newer buildings that are better suited to the needs of the Army. HQAMC has addressed this predicament by investing more of its overall operations and maintenance (OMA) funding into R&amp;M projects to restore and modernize the current inventory. This paper looked at the background of Army real property funding in terms of capital improvements, discussed how funding flowed through the chain of command, and finally, addressed the benefits and risks involved in each type of effort. The conclusion was that, given the current state of the Army budget and the lack of any large financial investments on the horizon, the use of R&amp;M for capital improvements is not only a viable option to MILCON but in many cases should be the first choice when seeking to restore facilities to the start of a useful lifecycle.","abstract_has_math":false,"creators":["Robbie, Heather L."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":null,"school":null,"contributors":[],"advisors":["Pickar, Charles K.","Tanenbaum, Paul"],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019-06","date_published":"2019-06","updated_at":"2026-11-19T06:39:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["29116"],"render_values":[{"text":"29116","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/62830","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/62830","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F62830","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Pickar, Charles K.","Tanenbaum, Paul"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Robbie, Heather L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-08-08T23:50:07Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-08-08T23:50:07Z"]},{"key":"dc:date.issued","label":"Date","values":["2019-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["29116"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["restoration and modernization","R&M","military construction","MILCON","Headquarters Army Materiel Command","HQAMC","capital improvements","infrastructure investment and sustainment","infrastructure regulations and policy"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/62830"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This paper is intended to examine at a high level the U.S. Army Materiel Command’s (HQAMC) use of restoration and modernization (R&M) capital improvements to existing facilities as a practical alternative to demolition and new construction through military construction (MILCON). The Army has been struggling over the past few years with the ever-declining mission readiness and quality of infrastructure. Lack of MILCON funds hinders efforts to demolish outdated facilities and replace them with newer buildings that are better suited to the needs of the Army. HQAMC has addressed this predicament by investing more of its overall operations and maintenance (OMA) funding into R&M projects to restore and modernize the current inventory. This paper looked at the background of Army real property funding in terms of capital improvements, discussed how funding flowed through the chain of command, and finally, addressed the benefits and risks involved in each type of effort. The conclusion was that, given the current state of the Army budget and the lack of any large financial investments on the horizon, the use of R&M for capital improvements is not only a viable option to MILCON but in many cases should be the first choice when seeking to restore facilities to the start of a useful lifecycle."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/restorationandmo1094562830"]},{"key":"dc:title","label":"Title","values":["RESTORATION AND MODERNIZATION CAPITAL IMPROVEMENTS OF ARMY INFRASTRUCTURE UNDER HQ AMC AS A VIABLE REPLACEMENT FOR MILITARY CONSTRUCTION"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Pickar, Charles K.","Tanenbaum, Paul"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Robbie, Heather L."],"dc:date.accessioned":["2019-08-08T23:50:07Z"],"dc:date.available":["2019-08-08T23:50:07Z"],"dc:date.issued":["2019-06"],"dc:description.abstract":["This paper is intended to examine at a high level the U.S. Army Materiel Command’s (HQAMC) use of restoration and modernization (R&M) capital improvements to existing facilities as a practical alternative to demolition and new construction through military construction (MILCON). The Army has been struggling over the past few years with the ever-declining mission readiness and quality of infrastructure. Lack of MILCON funds hinders efforts to demolish outdated facilities and replace them with newer buildings that are better suited to the needs of the Army. HQAMC has addressed this predicament by investing more of its overall operations and maintenance (OMA) funding into R&M projects to restore and modernize the current inventory. This paper looked at the background of Army real property funding in terms of capital improvements, discussed how funding flowed through the chain of command, and finally, addressed the benefits and risks involved in each type of effort. The conclusion was that, given the current state of the Army budget and the lack of any large financial investments on the horizon, the use of R&M for capital improvements is not only a viable option to MILCON but in many cases should be the first choice when seeking to restore facilities to the start of a useful lifecycle."],"dc:description.uri":["http://archive.org/details/restorationandmo1094562830"],"dc:identifier.uri":["https://hdl.handle.net/10945/62830"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["restoration and modernization","R&M","military construction","MILCON","Headquarters Army Materiel Command","HQAMC","capital improvements","infrastructure investment and sustainment","infrastructure regulations and policy"],"dc:title":["RESTORATION AND MODERNIZATION CAPITAL IMPROVEMENTS OF ARMY INFRASTRUCTURE UNDER HQ AMC AS A VIABLE REPLACEMENT FOR MILITARY CONSTRUCTION"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Army"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["29116"]},"updated_at":"2026-11-19T06:39:09Z"}