{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/62858"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/62858","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"OPTIMIZING MARINE CORPS INSTALLATION READINESS","abstract":"Marine Corps Installations Command (MCICOM) (enacted in 2012) exercises command and control over United States Marine Corps (USMC) installations through regional commanders. The department manages over 27,000 buildings and structures across 25 installations. In November 2016, the commandant of the Marine Corps (CMC), signed the Infrastructure Reset (IR) strategy to fundamentally alter the USMC's infrastructure lifecycle management. The intent of this strategy is to optimize the USMC’s assets in order to maximize support to operational readiness at minimal lifecycle costs. In this thesis, we develop a quantitative analysis and decision support tool in the form of a Mixed Integer Linear Program (MILP) to enable data-driven and informed decisions that best support the operating forces in line with the CMC's IR strategy. The IR multivariate decision tool uses a quantitative framework to summarize, describe, and optimize the USMC’s infrastructure portfolio. The tool provides quantitative justification for funding, informs the Program Objective Memorandum (POM), and establishes readiness goals for MCICOM and the subordinate regions and installations. Results show that under the current budgetary constraints, MCICOM has little ability to improve installation readiness by manipulating its four levers of investment. We find MCICOM requires a budget of roughly one and half times its current annual limit to achieve installation readiness levels set forth by the IR strategy.","abstract_html":"Marine Corps Installations Command (MCICOM) (enacted in 2012) exercises command and control over United States Marine Corps (USMC) installations through regional commanders. The department manages over 27,000 buildings and structures across 25 installations. In November 2016, the commandant of the Marine Corps (CMC), signed the Infrastructure Reset (IR) strategy to fundamentally alter the USMC&#x27;s infrastructure lifecycle management. The intent of this strategy is to optimize the USMC’s assets in order to maximize support to operational readiness at minimal lifecycle costs. In this thesis, we develop a quantitative analysis and decision support tool in the form of a Mixed Integer Linear Program (MILP) to enable data-driven and informed decisions that best support the operating forces in line with the CMC&#x27;s IR strategy. The IR multivariate decision tool uses a quantitative framework to summarize, describe, and optimize the USMC’s infrastructure portfolio. The tool provides quantitative justification for funding, informs the Program Objective Memorandum (POM), and establishes readiness goals for MCICOM and the subordinate regions and installations. Results show that under the current budgetary constraints, MCICOM has little ability to improve installation readiness by manipulating its four levers of investment. We find MCICOM requires a budget of roughly one and half times its current annual limit to achieve installation readiness levels set forth by the IR strategy.","abstract_has_math":false,"creators":["Renosto, Alyssa"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Dell, Robert F."],"committee_chairs":[],"committee_members":["Templeton, Jack, NPS Energy Academic Group"],"year":2019,"date_issued":"2019-06","date_published":"2019-06","updated_at":"2026-11-19T06:39:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32047"],"render_values":[{"text":"32047","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/62858","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/62858","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F62858","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dell, Robert F."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Templeton, Jack, NPS Energy Academic Group"]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:creator","label":"Author","values":["Renosto, Alyssa"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-08-08T23:50:31Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-08-08T23:50:31Z"]},{"key":"dc:date.issued","label":"Date","values":["2019-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32047"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["optimization","MCICOM","MILP","installation","capital planning","budget"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/62858"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Marine Corps Installations Command (MCICOM) (enacted in 2012) exercises command and control over United States Marine Corps (USMC) installations through regional commanders. The department manages over 27,000 buildings and structures across 25 installations. In November 2016, the commandant of the Marine Corps (CMC), signed the Infrastructure Reset (IR) strategy to fundamentally alter the USMC's infrastructure lifecycle management. The intent of this strategy is to optimize the USMC’s assets in order to maximize support to operational readiness at minimal lifecycle costs. In this thesis, we develop a quantitative analysis and decision support tool in the form of a Mixed Integer Linear Program (MILP) to enable data-driven and informed decisions that best support the operating forces in line with the CMC's IR strategy. The IR multivariate decision tool uses a quantitative framework to summarize, describe, and optimize the USMC’s infrastructure portfolio. The tool provides quantitative justification for funding, informs the Program Objective Memorandum (POM), and establishes readiness goals for MCICOM and the subordinate regions and installations. Results show that under the current budgetary constraints, MCICOM has little ability to improve installation readiness by manipulating its four levers of investment. We find MCICOM requires a budget of roughly one and half times its current annual limit to achieve installation readiness levels set forth by the IR strategy."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["MCICOM"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/optimizingmarine1094562858"]},{"key":"dc:title","label":"Title","values":["OPTIMIZING MARINE CORPS INSTALLATION READINESS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dell, Robert F."],"dc:contributor.committeemember":["Templeton, Jack, NPS Energy Academic Group"],"dc:contributor.department":["Operations Research (OR)"],"dc:creator":["Renosto, Alyssa"],"dc:date.accessioned":["2019-08-08T23:50:31Z"],"dc:date.available":["2019-08-08T23:50:31Z"],"dc:date.issued":["2019-06"],"dc:description.abstract":["Marine Corps Installations Command (MCICOM) (enacted in 2012) exercises command and control over United States Marine Corps (USMC) installations through regional commanders. The department manages over 27,000 buildings and structures across 25 installations. In November 2016, the commandant of the Marine Corps (CMC), signed the Infrastructure Reset (IR) strategy to fundamentally alter the USMC's infrastructure lifecycle management. The intent of this strategy is to optimize the USMC’s assets in order to maximize support to operational readiness at minimal lifecycle costs. In this thesis, we develop a quantitative analysis and decision support tool in the form of a Mixed Integer Linear Program (MILP) to enable data-driven and informed decisions that best support the operating forces in line with the CMC's IR strategy. The IR multivariate decision tool uses a quantitative framework to summarize, describe, and optimize the USMC’s infrastructure portfolio. The tool provides quantitative justification for funding, informs the Program Objective Memorandum (POM), and establishes readiness goals for MCICOM and the subordinate regions and installations. Results show that under the current budgetary constraints, MCICOM has little ability to improve installation readiness by manipulating its four levers of investment. We find MCICOM requires a budget of roughly one and half times its current annual limit to achieve installation readiness levels set forth by the IR strategy."],"dc:description.award":["Outstanding Thesis"],"dc:description.sponsorship":["MCICOM"],"dc:description.uri":["http://archive.org/details/optimizingmarine1094562858"],"dc:identifier.uri":["https://hdl.handle.net/10945/62858"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["NPS Outstanding Theses and Dissertations"],"dc:relation.seriesentity":["c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["optimization","MCICOM","MILP","installation","capital planning","budget"],"dc:title":["OPTIMIZING MARINE CORPS INSTALLATION READINESS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["32047"]},"updated_at":"2026-11-19T06:39:09Z"}