{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/63192"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/63192","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Collaborative Scheduling Methods: The Most Collaborative and Software to Support","abstract":"The purpose of this paper is to examine CII RT 362's proposed definition of collaborative scheduling, A comprehensive process that aligns and engages stakeholders throughout the lifecycle of the project in order to coordinate activities and resources on a project and achieve its goal. This will be achieved through a literature review of its key aspects of alignment, engagement, lifecycle, coordination, and goals to see if the definition is valid. Additionally, it will then be used to evaluate the scheduling methods of Critical Path Method, Line of Balance Method, Scrum, and Last Planner System for which is the most collaborative. Finally a review of available software support for each method is provided to inform readers of digital support for each method is provided to inform readers of digital support available in the hopes that it will further the collaborative process. According to the analysis performed, the methods, from most to least collaborative are the Last Planner System, Scrum, Line of Balance, and the Critical Path Method. The paper advances the field by scrutinizing a proposed definition, evevaluating existing methods within that term and then linking sofwware support to those systems.","abstract_html":"The purpose of this paper is to examine CII RT 362&#x27;s proposed definition of collaborative scheduling, A comprehensive process that aligns and engages stakeholders throughout the lifecycle of the project in order to coordinate activities and resources on a project and achieve its goal. This will be achieved through a literature review of its key aspects of alignment, engagement, lifecycle, coordination, and goals to see if the definition is valid. Additionally, it will then be used to evaluate the scheduling methods of Critical Path Method, Line of Balance Method, Scrum, and Last Planner System for which is the most collaborative. Finally a review of available software support for each method is provided to inform readers of digital support for each method is provided to inform readers of digital support available in the hopes that it will further the collaborative process. According to the analysis performed, the methods, from most to least collaborative are the Last Planner System, Scrum, Line of Balance, and the Critical Path Method. The paper advances the field by scrutinizing a proposed definition, evevaluating existing methods within that term and then linking sofwware support to those systems.","abstract_has_math":false,"creators":["Warren, Calvin, J."],"institution":"Monterey California. Naval Postgraduate School","degree_name":null,"degree_level":"Masters","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019-05","date_published":"2019-05","updated_at":"2026-11-21T23:31:50Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/63192","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/63192","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F63192","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Warren, Calvin, J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-09-10T23:30:43Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-09-10T23:30:43Z"]},{"key":"dc:date.issued","label":"Date","values":["2019-05"]},{"key":"dc:publisher","label":"Institution","values":["Monterey California. Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Collaboration, Schedule, Critical Path Method, Line of Balance, Scrum, Last Planner System."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/63192"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["CIVINS (Civilian Institutions) Thesis document","Capstone Project"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this paper is to examine CII RT 362's proposed definition of collaborative scheduling, A comprehensive process that aligns and engages stakeholders throughout the lifecycle of the project in order to coordinate activities and resources on a project and achieve its goal. This will be achieved through a literature review of its key aspects of alignment, engagement, lifecycle, coordination, and goals to see if the definition is valid. Additionally, it will then be used to evaluate the scheduling methods of Critical Path Method, Line of Balance Method, Scrum, and Last Planner System for which is the most collaborative. Finally a review of available software support for each method is provided to inform readers of digital support for each method is provided to inform readers of digital support available in the hopes that it will further the collaborative process. According to the analysis performed, the methods, from most to least collaborative are the Last Planner System, Scrum, Line of Balance, and the Critical Path Method. The paper advances the field by scrutinizing a proposed definition, evevaluating existing methods within that term and then linking sofwware support to those systems."]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NPS CIVINS"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/collaborativesch1094563192"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["22 p."]},{"key":"dc:title","label":"Title","values":["Collaborative Scheduling Methods: The Most Collaborative and Software to Support"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["LCDR"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Warren, Calvin, J."],"dc:date.accessioned":["2019-09-10T23:30:43Z"],"dc:date.available":["2019-09-10T23:30:43Z"],"dc:date.issued":["2019-05"],"dc:description":["CIVINS (Civilian Institutions) Thesis document","Capstone Project"],"dc:description.abstract":["The purpose of this paper is to examine CII RT 362's proposed definition of collaborative scheduling, A comprehensive process that aligns and engages stakeholders throughout the lifecycle of the project in order to coordinate activities and resources on a project and achieve its goal. This will be achieved through a literature review of its key aspects of alignment, engagement, lifecycle, coordination, and goals to see if the definition is valid. Additionally, it will then be used to evaluate the scheduling methods of Critical Path Method, Line of Balance Method, Scrum, and Last Planner System for which is the most collaborative. Finally a review of available software support for each method is provided to inform readers of digital support for each method is provided to inform readers of digital support available in the hopes that it will further the collaborative process. According to the analysis performed, the methods, from most to least collaborative are the Last Planner System, Scrum, Line of Balance, and the Critical Path Method. The paper advances the field by scrutinizing a proposed definition, evevaluating existing methods within that term and then linking sofwware support to those systems."],"dc:description.sponsorship":["NPS CIVINS"],"dc:description.uri":["http://archive.org/details/collaborativesch1094563192"],"dc:format.extent":["22 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/63192"],"dc:publisher":["Monterey California. Naval Postgraduate School"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Collaboration, Schedule, Critical Path Method, Line of Balance, Scrum, Last Planner System."],"dc:title":["Collaborative Scheduling Methods: The Most Collaborative and Software to Support"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["LCDR"],"thesis:degree_level":["Masters"]},"updated_at":"2026-11-21T23:31:50Z"}