{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/63477"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/63477","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"OPERATIONAL AND MISSION READINESS IMPACT OF ADDITIVE MANUFACTURING DEPLOYMENT IN THE NAVY SUPPLY CHAIN","abstract":"This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today's Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today's Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today's Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.","abstract_html":"This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today&#x27;s Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today&#x27;s Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today&#x27;s Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.","abstract_has_math":false,"creators":["Lopez, Jose A., II"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":null,"school":null,"contributors":[],"advisors":["Pace, Howard Jr."],"committee_chairs":[],"committee_members":["Gunduz, Ibrahim E."],"year":2019,"date_issued":"2019-09","date_published":"2019-09","updated_at":"2026-11-19T06:39:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32006"],"render_values":[{"text":"32006","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/63477","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/63477","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F63477","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F63477","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Pace, Howard Jr."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Gunduz, Ibrahim E."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Lopez, Jose A., II"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-11-04T18:20:01Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-11-04T18:20:01Z"]},{"key":"dc:date.issued","label":"Date","values":["2019-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32006"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["AM","additive manufacturing"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/63477"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today's Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today's Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today's Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/operationalandmi1094563477"]},{"key":"dc:title","label":"Title","values":["OPERATIONAL AND MISSION READINESS IMPACT OF ADDITIVE MANUFACTURING DEPLOYMENT IN THE NAVY SUPPLY CHAIN"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Pace, Howard Jr."],"dc:contributor.committeemember":["Gunduz, Ibrahim E."],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Lopez, Jose A., II"],"dc:date.accessioned":["2019-11-04T18:20:01Z"],"dc:date.available":["2019-11-04T18:20:01Z"],"dc:date.issued":["2019-09"],"dc:description.abstract":["This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today's Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today's Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research.This project will examine the operational and mission availability of ships deployed with an integrated additive manufacturing (AM) capability. The purpose of this research is to determine the best option with regard to operational availability, mission availability and total ownership costs to the Navy. The objectives of this project will include a comparative analysis based on three separate scenarios that will seek to compare the operational impact cost against the total ownership cost for the Navy. The first scenario will be a baseline to show the operational availability, mission availability and total cost to the Navy utilizing the standard supply system; the second scenario integrates the use of AM onboard the USS John C. Stennis (CVN 74); the third scenario will integrate the AM machine that will be used to manufacture the required part at a centralized shore facility in the Fifth Fleet logistics hub. Chapter I will provide an overview and background of the history and accomplishments of AM in today's Navy. Chapter II will include the literature review, and more specifically, an introduction of the formulas that will be used later in this research. Chapter III illustrates the data that was identified in the research and provides an analysis of how the data meets the objectives of this study. Chapter IV will discuss the results and provide recommendations. Chapter V will provide final thoughts and possible areas for further research."],"dc:description.uri":["http://archive.org/details/operationalandmi1094563477"],"dc:identifier.uri":["https://hdl.handle.net/10945/63477"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["AM","additive manufacturing"],"dc:title":["OPERATIONAL AND MISSION READINESS IMPACT OF ADDITIVE MANUFACTURING DEPLOYMENT IN THE NAVY SUPPLY CHAIN"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["32006"]},"updated_at":"2026-11-19T06:39:09Z"}