{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/63522"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/63522","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"DEVELOPING A VALUE PROPOSITION FOR THE MARINE FORCES RESERVE SUPPLY AND MAINTENANCE INSPECTION PROGRAM","abstract":"The focus of this thesis is to assist MARFORRES G-4 in developing relevant measurable system attributes and corresponding value models to better articulate the contributions of the SMAT inspection program to the MARFORRES mission. The thesis developed a stakeholder-derived objectives hierarchy that reflects the SMAT inspection program's role in the MARFORRES mission and identified measurable system attributes that evaluate the degree that the SMAT inspection program supports the MARFORRES mission. This in-depth examination of the SMAT operations lay the foundation for improving SMAT inspection program processes to achieve its overall purpose of increasing the MARFORRES readiness. The deliverables from the thesis are 1) a framework to evaluate the value of the SMAT inspection program and 2) measurable attributes that describe the value of the SMAT inspection program. Stakeholders can use the objectives and attributes developed for the SMAT inspection program as an effective tool in communicating organizational goals and information requirements. In the next phase of the study, we recommend that the supply and maintenance rating of the inspected units be collected 90–120 days after inspection for further analysis of their performance. As more data becomes available, future researchers should reevaluate the value models for accuracy in describing the stakeholders' value sense.","abstract_html":"The focus of this thesis is to assist MARFORRES G-4 in developing relevant measurable system attributes and corresponding value models to better articulate the contributions of the SMAT inspection program to the MARFORRES mission. The thesis developed a stakeholder-derived objectives hierarchy that reflects the SMAT inspection program&#x27;s role in the MARFORRES mission and identified measurable system attributes that evaluate the degree that the SMAT inspection program supports the MARFORRES mission. This in-depth examination of the SMAT operations lay the foundation for improving SMAT inspection program processes to achieve its overall purpose of increasing the MARFORRES readiness. The deliverables from the thesis are 1) a framework to evaluate the value of the SMAT inspection program and 2) measurable attributes that describe the value of the SMAT inspection program. Stakeholders can use the objectives and attributes developed for the SMAT inspection program as an effective tool in communicating organizational goals and information requirements. In the next phase of the study, we recommend that the supply and maintenance rating of the inspected units be collected 90–120 days after inspection for further analysis of their performance. As more data becomes available, future researchers should reevaluate the value models for accuracy in describing the stakeholders&#x27; value sense.","abstract_has_math":false,"creators":["Yee, Jun Xian Jeremy"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering","degree_level":"Masters","degree_discipline":"Systems Engineering","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Hernandez, Alejandro S."],"committee_chairs":[],"committee_members":["Pollman, Anthony G."],"year":2019,"date_issued":"2019-09","date_published":"2019-09","updated_at":"2026-11-19T06:39:09Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32622"],"render_values":[{"text":"32622","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/63522","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/63522","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F63522","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F63522","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Hernandez, Alejandro S."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Pollman, Anthony G."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Yee, Jun Xian Jeremy"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-11-04T18:20:35Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-11-04T18:20:35Z"]},{"key":"dc:date.issued","label":"Date","values":["2019-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32622"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["value model","attributes","SMAT inspection"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/63522"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The focus of this thesis is to assist MARFORRES G-4 in developing relevant measurable system attributes and corresponding value models to better articulate the contributions of the SMAT inspection program to the MARFORRES mission. The thesis developed a stakeholder-derived objectives hierarchy that reflects the SMAT inspection program's role in the MARFORRES mission and identified measurable system attributes that evaluate the degree that the SMAT inspection program supports the MARFORRES mission. This in-depth examination of the SMAT operations lay the foundation for improving SMAT inspection program processes to achieve its overall purpose of increasing the MARFORRES readiness. The deliverables from the thesis are 1) a framework to evaluate the value of the SMAT inspection program and 2) measurable attributes that describe the value of the SMAT inspection program. Stakeholders can use the objectives and attributes developed for the SMAT inspection program as an effective tool in communicating organizational goals and information requirements. In the next phase of the study, we recommend that the supply and maintenance rating of the inspected units be collected 90–120 days after inspection for further analysis of their performance. As more data becomes available, future researchers should reevaluate the value models for accuracy in describing the stakeholders' value sense."]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["Marine Forces Reserve"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/developingavalue1094563522"]},{"key":"dc:title","label":"Title","values":["DEVELOPING A VALUE PROPOSITION FOR THE MARINE FORCES RESERVE SUPPLY AND MAINTENANCE INSPECTION PROGRAM"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, Singapore Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Hernandez, Alejandro S."],"dc:contributor.committeemember":["Pollman, Anthony G."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Yee, Jun Xian Jeremy"],"dc:date.accessioned":["2019-11-04T18:20:35Z"],"dc:date.available":["2019-11-04T18:20:35Z"],"dc:date.issued":["2019-09"],"dc:description.abstract":["The focus of this thesis is to assist MARFORRES G-4 in developing relevant measurable system attributes and corresponding value models to better articulate the contributions of the SMAT inspection program to the MARFORRES mission. The thesis developed a stakeholder-derived objectives hierarchy that reflects the SMAT inspection program's role in the MARFORRES mission and identified measurable system attributes that evaluate the degree that the SMAT inspection program supports the MARFORRES mission. This in-depth examination of the SMAT operations lay the foundation for improving SMAT inspection program processes to achieve its overall purpose of increasing the MARFORRES readiness. The deliverables from the thesis are 1) a framework to evaluate the value of the SMAT inspection program and 2) measurable attributes that describe the value of the SMAT inspection program. Stakeholders can use the objectives and attributes developed for the SMAT inspection program as an effective tool in communicating organizational goals and information requirements. In the next phase of the study, we recommend that the supply and maintenance rating of the inspected units be collected 90–120 days after inspection for further analysis of their performance. As more data becomes available, future researchers should reevaluate the value models for accuracy in describing the stakeholders' value sense."],"dc:description.sponsorship":["Marine Forces Reserve"],"dc:description.uri":["http://archive.org/details/developingavalue1094563522"],"dc:identifier.uri":["https://hdl.handle.net/10945/63522"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["value model","attributes","SMAT inspection"],"dc:title":["DEVELOPING A VALUE PROPOSITION FOR THE MARINE FORCES RESERVE SUPPLY AND MAINTENANCE INSPECTION PROGRAM"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, Singapore Army"],"thesis:degree_discipline":["Systems Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["32622"]},"updated_at":"2026-11-19T06:39:09Z"}