{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/65516"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/65516","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"APPLICABILITY OF PERFORMANCE-BASED LOGISTICS TO BRAZILIAN ARMED FORCES’ CONTRACTING PROCESSES IMPROVEMENTS","abstract":"In recent years, the Brazilian Armed Forces (BAF) has started the adoption of Performance-Based Logistics (PBL) contracts for maintenance of defense systems such as operational aircraft and frigates. It was a migration from the traditional method of using in-house capability to outsourced maintenance structure with performance requirements. The life cycle of a system is costly and may span decades. Hence, the correct contractual choices made during all phases of a program may represent a significant amount of savings to the Brazilian branches. This research had as the main issue finding out how BAF can optimize its performance-based contracting processes by identifying best contractual practices developed by the U.S. Department of Defense (DoD). This study identified several best practices distributed in different phases of the Contract Life Cycle that can promote cost reduction and system performance improvement. Finally, even though there are differences between the DoD and the BAF contracting cultures, financial capacity, and number of defense systems, this study concluded that the PBL best practices could be used in the BAF and also made recommendations on how to apply them in the Brazilian Defense Sector.","abstract_html":"In recent years, the Brazilian Armed Forces (BAF) has started the adoption of Performance-Based Logistics (PBL) contracts for maintenance of defense systems such as operational aircraft and frigates. It was a migration from the traditional method of using in-house capability to outsourced maintenance structure with performance requirements. The life cycle of a system is costly and may span decades. Hence, the correct contractual choices made during all phases of a program may represent a significant amount of savings to the Brazilian branches. This research had as the main issue finding out how BAF can optimize its performance-based contracting processes by identifying best contractual practices developed by the U.S. Department of Defense (DoD). This study identified several best practices distributed in different phases of the Contract Life Cycle that can promote cost reduction and system performance improvement. Finally, even though there are differences between the DoD and the BAF contracting cultures, financial capacity, and number of defense systems, this study concluded that the PBL best practices could be used in the BAF and also made recommendations on how to apply them in the Brazilian Defense Sector.","abstract_has_math":false,"creators":["Feitosa Silva, Rodrigo","Buarque dos Santos, Lucas"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Master of Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Ferrer, Geraldo"],"committee_chairs":[],"committee_members":["Rendon, Rene"],"year":2020,"date_issued":"2020-06","date_published":"2020-06","updated_at":"2026-11-24T23:54:39Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release. distribution is unlimited"],"rights_urls":[],"identifier_entries":[{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32670"],"render_values":[{"text":"32670","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/65516","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/65516","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F65516","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F65516","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ferrer, Geraldo"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Rendon, Rene"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Defense Management (GSDM)"]},{"key":"dc:creator","label":"Author","values":["Feitosa Silva, Rodrigo","Buarque dos Santos, Lucas"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2020-08-21T00:25:39Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2020-08-21T00:25:39Z"]},{"key":"dc:date.issued","label":"Date","values":["2020-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["a908d044-49b0-4c19-97fa-5c15ddcc38e0"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["51976d4c-d4bc-442b-9530-5a441e399dd2","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Master of Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32670"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["life cycle management","contract management","PBL","reliability","risk management","availability","best practices","war systems","performance","outcomes","Brazilian Armed Forces","BAF","Performance-Based Logistics"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release. distribution is unlimited"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/65516"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In recent years, the Brazilian Armed Forces (BAF) has started the adoption of Performance-Based Logistics (PBL) contracts for maintenance of defense systems such as operational aircraft and frigates. It was a migration from the traditional method of using in-house capability to outsourced maintenance structure with performance requirements. The life cycle of a system is costly and may span decades. Hence, the correct contractual choices made during all phases of a program may represent a significant amount of savings to the Brazilian branches. This research had as the main issue finding out how BAF can optimize its performance-based contracting processes by identifying best contractual practices developed by the U.S. Department of Defense (DoD). This study identified several best practices distributed in different phases of the Contract Life Cycle that can promote cost reduction and system performance improvement. Finally, even though there are differences between the DoD and the BAF contracting cultures, financial capacity, and number of defense systems, this study concluded that the PBL best practices could be used in the BAF and also made recommendations on how to apply them in the Brazilian Defense Sector."]},{"key":"dc:title","label":"Title","values":["APPLICABILITY OF PERFORMANCE-BASED LOGISTICS TO BRAZILIAN ARMED FORCES’ CONTRACTING PROCESSES IMPROVEMENTS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, Brazilian Navy","Major, Brazilian Air Force"]}]}],"canonical_facts":{"dc:contributor.advisor":["Ferrer, Geraldo"],"dc:contributor.committeemember":["Rendon, Rene"],"dc:contributor.other":["Graduate School of Defense Management (GSDM)"],"dc:creator":["Feitosa Silva, Rodrigo","Buarque dos Santos, Lucas"],"dc:date.accessioned":["2020-08-21T00:25:39Z"],"dc:date.available":["2020-08-21T00:25:39Z"],"dc:date.issued":["2020-06"],"dc:description.abstract":["In recent years, the Brazilian Armed Forces (BAF) has started the adoption of Performance-Based Logistics (PBL) contracts for maintenance of defense systems such as operational aircraft and frigates. It was a migration from the traditional method of using in-house capability to outsourced maintenance structure with performance requirements. The life cycle of a system is costly and may span decades. Hence, the correct contractual choices made during all phases of a program may represent a significant amount of savings to the Brazilian branches. This research had as the main issue finding out how BAF can optimize its performance-based contracting processes by identifying best contractual practices developed by the U.S. Department of Defense (DoD). This study identified several best practices distributed in different phases of the Contract Life Cycle that can promote cost reduction and system performance improvement. Finally, even though there are differences between the DoD and the BAF contracting cultures, financial capacity, and number of defense systems, this study concluded that the PBL best practices could be used in the BAF and also made recommendations on how to apply them in the Brazilian Defense Sector."],"dc:identifier.uri":["https://hdl.handle.net/10945/65516"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.advisorentity":["a908d044-49b0-4c19-97fa-5c15ddcc38e0"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["51976d4c-d4bc-442b-9530-5a441e399dd2","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release. distribution is unlimited"],"dc:subject.keyword":["life cycle management","contract management","PBL","reliability","risk management","availability","best practices","war systems","performance","outcomes","Brazilian Armed Forces","BAF","Performance-Based Logistics"],"dc:title":["APPLICABILITY OF PERFORMANCE-BASED LOGISTICS TO BRAZILIAN ARMED FORCES’ CONTRACTING PROCESSES IMPROVEMENTS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, Brazilian Navy","Major, Brazilian Air Force"],"thesis:degree_discipline":["Master of Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["32670"]},"updated_at":"2026-11-24T23:54:39Z"}