{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/66034"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/66034","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"HIGH-INFLUENCE FACTORS FOR THE TIMELINESS OF PROJECT AWARD FOR NAVY MILITARY CONSTRUCTION","abstract":"The current process that Naval Facilities Engineering Command (NAVFAC) uses to bring Military Construction (MILCON) projects from concept to contract award fails to provide reliable and timely results. This poor performance leads to the untimely delivery of critical facilities, which directly impacts warfighting and power projection capabilities. It erodes the professional reputation of NAVFAC, leaving supported commanders to question whether an essential product or service will arrive on time. Today, there are many internal NAVFAC teams exploring process-improvement opportunities across the entire construction timeline, of which pre-award is only one piece. However, many of these efforts are limited in terms of number of projects or project factors considered. The focus of this thesis is to analyze projects from initial documentation up to contract award. To accomplish this, we linked two widely used but independent databases to capture the complete documented life cycle of hundreds of Navy-executed MILCONs. Once linked, dozens of project factors were collected, analyzed, and used in the development of various machine-learning models to assess their influence on project award performance. Our analysis highlights several factors among existing and newly constructed project metrics that appear to greatly influence the timeliness of project award. This collection of potentially high-influence factors can then help NAVFAC further focus its ongoing process improvements.","abstract_html":"The current process that Naval Facilities Engineering Command (NAVFAC) uses to bring Military Construction (MILCON) projects from concept to contract award fails to provide reliable and timely results. This poor performance leads to the untimely delivery of critical facilities, which directly impacts warfighting and power projection capabilities. It erodes the professional reputation of NAVFAC, leaving supported commanders to question whether an essential product or service will arrive on time. Today, there are many internal NAVFAC teams exploring process-improvement opportunities across the entire construction timeline, of which pre-award is only one piece. However, many of these efforts are limited in terms of number of projects or project factors considered. The focus of this thesis is to analyze projects from initial documentation up to contract award. To accomplish this, we linked two widely used but independent databases to capture the complete documented life cycle of hundreds of Navy-executed MILCONs. Once linked, dozens of project factors were collected, analyzed, and used in the development of various machine-learning models to assess their influence on project award performance. Our analysis highlights several factors among existing and newly constructed project metrics that appear to greatly influence the timeliness of project award. This collection of potentially high-influence factors can then help NAVFAC further focus its ongoing process improvements.","abstract_has_math":false,"creators":["Thompson, Robert J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Whitaker, Lyn R."],"committee_chairs":[],"committee_members":["Buttrey, Samuel E."],"year":2020,"date_issued":"2020-09","date_published":"2020-09","updated_at":"2026-11-19T06:40:00Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States","Approved for public release. distribution is unlimited"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["360, Operations Analysis"],"render_values":[{"text":"360, Operations Analysis","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32256"],"render_values":[{"text":"32256","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/66034","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/66034","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F66034","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Whitaker, Lyn R."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Buttrey, Samuel E."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:creator","label":"Author","values":["Thompson, Robert J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Sep-20"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2020-11-18T00:22:46Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2020-11-18T00:22:46Z"]},{"key":"dc:date.issued","label":"Date","values":["2020-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["32256"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["MILCON","NAVFAC","pre-design","DD 1391","project documentation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States","Approved for public release. distribution is unlimited"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["360, Operations Analysis"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/66034"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The current process that Naval Facilities Engineering Command (NAVFAC) uses to bring Military Construction (MILCON) projects from concept to contract award fails to provide reliable and timely results. This poor performance leads to the untimely delivery of critical facilities, which directly impacts warfighting and power projection capabilities. It erodes the professional reputation of NAVFAC, leaving supported commanders to question whether an essential product or service will arrive on time. Today, there are many internal NAVFAC teams exploring process-improvement opportunities across the entire construction timeline, of which pre-award is only one piece. However, many of these efforts are limited in terms of number of projects or project factors considered. The focus of this thesis is to analyze projects from initial documentation up to contract award. To accomplish this, we linked two widely used but independent databases to capture the complete documented life cycle of hundreds of Navy-executed MILCONs. Once linked, dozens of project factors were collected, analyzed, and used in the development of various machine-learning models to assess their influence on project award performance. Our analysis highlights several factors among existing and newly constructed project metrics that appear to greatly influence the timeliness of project award. This collection of potentially high-influence factors can then help NAVFAC further focus its ongoing process improvements."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/highinfluencefac1094566034"]},{"key":"dc:title","label":"Title","values":["HIGH-INFLUENCE FACTORS FOR THE TIMELINESS OF PROJECT AWARD FOR NAVY MILITARY CONSTRUCTION"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Whitaker, Lyn R."],"dc:contributor.committeemember":["Buttrey, Samuel E."],"dc:contributor.department":["Operations Research (OR)"],"dc:creator":["Thompson, Robert J."],"dc:date":["Sep-20"],"dc:date.accessioned":["2020-11-18T00:22:46Z"],"dc:date.available":["2020-11-18T00:22:46Z"],"dc:date.issued":["2020-09"],"dc:description.abstract":["The current process that Naval Facilities Engineering Command (NAVFAC) uses to bring Military Construction (MILCON) projects from concept to contract award fails to provide reliable and timely results. This poor performance leads to the untimely delivery of critical facilities, which directly impacts warfighting and power projection capabilities. It erodes the professional reputation of NAVFAC, leaving supported commanders to question whether an essential product or service will arrive on time. Today, there are many internal NAVFAC teams exploring process-improvement opportunities across the entire construction timeline, of which pre-award is only one piece. However, many of these efforts are limited in terms of number of projects or project factors considered. The focus of this thesis is to analyze projects from initial documentation up to contract award. To accomplish this, we linked two widely used but independent databases to capture the complete documented life cycle of hundreds of Navy-executed MILCONs. Once linked, dozens of project factors were collected, analyzed, and used in the development of various machine-learning models to assess their influence on project award performance. Our analysis highlights several factors among existing and newly constructed project metrics that appear to greatly influence the timeliness of project award. This collection of potentially high-influence factors can then help NAVFAC further focus its ongoing process improvements."],"dc:description.award":["Outstanding Thesis"],"dc:description.uri":["http://archive.org/details/highinfluencefac1094566034"],"dc:identifier.programcode":["360, Operations Analysis"],"dc:identifier.uri":["https://hdl.handle.net/10945/66034"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["NPS Outstanding Theses and Dissertations"],"dc:relation.seriesentity":["c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States","Approved for public release. distribution is unlimited"],"dc:subject.keyword":["MILCON","NAVFAC","pre-design","DD 1391","project documentation"],"dc:title":["HIGH-INFLUENCE FACTORS FOR THE TIMELINESS OF PROJECT AWARD FOR NAVY MILITARY CONSTRUCTION"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["32256"]},"updated_at":"2026-11-19T06:40:00Z"}