{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/66045"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/66045","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"RISK MITIGATION FOR DECREASED F/A-18 READINESS CAUSED BY IMPROPERLY EXECUTED AIRFRAME INSPECTIONS ON MISSILE SUPPORT RIB DOOR 144","abstract":"The F/A-18 Hornet is an all-weather fighter/attack tactical aircraft with an intended design life of 6,000 flight hours. Increased utilization in numerous recent military campaigns has caused the F/A-18 to reach the end of its intended life sooner than expected. The Naval Air Systems Command (NAVAIR) implemented a Service Life Management Plan (SLMP) to extend the F/A-18's service life up to 10,000 flight hours through a series of recurring inspections. While performing these inspections, maintenance personnel oftentimes cause unintended structural damage that requires unscheduled maintenance and negatively impacts system readiness and mission capability. This thesis analyzes repair data records for the Missile Support Rib Door 144 on the F/A-18 Hornet aircraft collected over the last five years and provides a cost-benefit analysis for several risk reduction options for those repairs. While this analysis focuses on this one area of the F/A-18, the same methodology can be applied to other SLMP inspections. This study concludes that by adding one extra day to the inspection timeline and permitting additional O-Level Quality Assurance checks of the preparation process, nearly 50% of all unscheduled SLMP maintenance and the associated negative impact on aircraft readiness can be prevented.","abstract_html":"The F/A-18 Hornet is an all-weather fighter/attack tactical aircraft with an intended design life of 6,000 flight hours. Increased utilization in numerous recent military campaigns has caused the F/A-18 to reach the end of its intended life sooner than expected. The Naval Air Systems Command (NAVAIR) implemented a Service Life Management Plan (SLMP) to extend the F/A-18&#x27;s service life up to 10,000 flight hours through a series of recurring inspections. While performing these inspections, maintenance personnel oftentimes cause unintended structural damage that requires unscheduled maintenance and negatively impacts system readiness and mission capability. This thesis analyzes repair data records for the Missile Support Rib Door 144 on the F/A-18 Hornet aircraft collected over the last five years and provides a cost-benefit analysis for several risk reduction options for those repairs. While this analysis focuses on this one area of the F/A-18, the same methodology can be applied to other SLMP inspections. This study concludes that by adding one extra day to the inspection timeline and permitting additional O-Level Quality Assurance checks of the preparation process, nearly 50% of all unscheduled SLMP maintenance and the associated negative impact on aircraft readiness can be prevented.","abstract_has_math":false,"creators":["Weintraub, Jacob D."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Rhoades, Mark M.","Van Bossuyt, Douglas"],"committee_chairs":[],"committee_members":[],"year":2020,"date_issued":"2020-09","date_published":"2020-09","updated_at":"2026-11-19T06:40:00Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States","Approved for public release. distribution is unlimited"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["721, Systems Engineering Management-PD21 (DL)"],"render_values":[{"text":"721, Systems Engineering Management-PD21 (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["34272"],"render_values":[{"text":"34272","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/66045","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/66045","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F66045","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Rhoades, Mark M.","Van Bossuyt, Douglas"]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Weintraub, Jacob D."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Sep-20"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2020-11-18T00:22:49Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2020-11-18T00:22:49Z"]},{"key":"dc:date.issued","label":"Date","values":["2020-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["34272"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["F/A-18","maintenance","inspection","missile rib","Hornet","readiness","Naval Air Systems Command","NAVAIR","Service Life Management Plan","SLMP"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States","Approved for public release. distribution is unlimited"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["721, Systems Engineering Management-PD21 (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/66045"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The F/A-18 Hornet is an all-weather fighter/attack tactical aircraft with an intended design life of 6,000 flight hours. Increased utilization in numerous recent military campaigns has caused the F/A-18 to reach the end of its intended life sooner than expected. The Naval Air Systems Command (NAVAIR) implemented a Service Life Management Plan (SLMP) to extend the F/A-18's service life up to 10,000 flight hours through a series of recurring inspections. While performing these inspections, maintenance personnel oftentimes cause unintended structural damage that requires unscheduled maintenance and negatively impacts system readiness and mission capability. This thesis analyzes repair data records for the Missile Support Rib Door 144 on the F/A-18 Hornet aircraft collected over the last five years and provides a cost-benefit analysis for several risk reduction options for those repairs. While this analysis focuses on this one area of the F/A-18, the same methodology can be applied to other SLMP inspections. This study concludes that by adding one extra day to the inspection timeline and permitting additional O-Level Quality Assurance checks of the preparation process, nearly 50% of all unscheduled SLMP maintenance and the associated negative impact on aircraft readiness can be prevented."]},{"key":"dc:title","label":"Title","values":["RISK MITIGATION FOR DECREASED F/A-18 READINESS CAUSED BY IMPROPERLY EXECUTED AIRFRAME INSPECTIONS ON MISSILE SUPPORT RIB DOOR 144"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Rhoades, Mark M.","Van Bossuyt, Douglas"],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Weintraub, Jacob D."],"dc:date":["Sep-20"],"dc:date.accessioned":["2020-11-18T00:22:49Z"],"dc:date.available":["2020-11-18T00:22:49Z"],"dc:date.issued":["2020-09"],"dc:description.abstract":["The F/A-18 Hornet is an all-weather fighter/attack tactical aircraft with an intended design life of 6,000 flight hours. Increased utilization in numerous recent military campaigns has caused the F/A-18 to reach the end of its intended life sooner than expected. The Naval Air Systems Command (NAVAIR) implemented a Service Life Management Plan (SLMP) to extend the F/A-18's service life up to 10,000 flight hours through a series of recurring inspections. While performing these inspections, maintenance personnel oftentimes cause unintended structural damage that requires unscheduled maintenance and negatively impacts system readiness and mission capability. This thesis analyzes repair data records for the Missile Support Rib Door 144 on the F/A-18 Hornet aircraft collected over the last five years and provides a cost-benefit analysis for several risk reduction options for those repairs. While this analysis focuses on this one area of the F/A-18, the same methodology can be applied to other SLMP inspections. This study concludes that by adding one extra day to the inspection timeline and permitting additional O-Level Quality Assurance checks of the preparation process, nearly 50% of all unscheduled SLMP maintenance and the associated negative impact on aircraft readiness can be prevented."],"dc:identifier.programcode":["721, Systems Engineering Management-PD21 (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/66045"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States","Approved for public release. distribution is unlimited"],"dc:subject.keyword":["F/A-18","maintenance","inspection","missile rib","Hornet","readiness","Naval Air Systems Command","NAVAIR","Service Life Management Plan","SLMP"],"dc:title":["RISK MITIGATION FOR DECREASED F/A-18 READINESS CAUSED BY IMPROPERLY EXECUTED AIRFRAME INSPECTIONS ON MISSILE SUPPORT RIB DOOR 144"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["34272"]},"updated_at":"2026-11-19T06:40:00Z"}