{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/66098"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/66098","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"AN IMPACT ANALYSIS OF DFARS CLAUSE 252.242.7005 ON CONTRACTOR BUSINESS SYSTEM APPROVAL AND DISAPPROVAL","abstract":"This research attempted to quantify the impact to the government, contractor, and warfighter of the implementation of the Better Buying Power Initiative 3.0, and specifically, Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.242.7005, Contractor Business Systems, which allowed for more stringent government oversight of contractors. Data was collected from Contract Business Analysis Repository (CBAR), which shows the contractor business systems' approval or disapproval status. A qualitative analysis was then performed using DCMA business system compliance review reports, letters, and contractor data to verify significant deficiencies with business systems that led to system disapproval. This research details the significant deficiencies of this process, given that there were contractors with multiple business system disapprovals who are still actively contracting with the federal government, potentially affecting both government efficiency and warfighter readiness. Finding 1: Analysis of the CBAR data from 2015 and 2019 for the six contractor business systems revealed that once a business system is reapproved, there is no method for viewing historical data of past deficiencies. Finding 2: The data analysis revealed the lack of a responsibility tracking tool. Finding 3: The corrective action requests that were analyzed on the disapproved contractor business systems did not impact the urgent fielding of critical equipment.","abstract_html":"This research attempted to quantify the impact to the government, contractor, and warfighter of the implementation of the Better Buying Power Initiative 3.0, and specifically, Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.242.7005, Contractor Business Systems, which allowed for more stringent government oversight of contractors. Data was collected from Contract Business Analysis Repository (CBAR), which shows the contractor business systems&#x27; approval or disapproval status. A qualitative analysis was then performed using DCMA business system compliance review reports, letters, and contractor data to verify significant deficiencies with business systems that led to system disapproval. This research details the significant deficiencies of this process, given that there were contractors with multiple business system disapprovals who are still actively contracting with the federal government, potentially affecting both government efficiency and warfighter readiness. Finding 1: Analysis of the CBAR data from 2015 and 2019 for the six contractor business systems revealed that once a business system is reapproved, there is no method for viewing historical data of past deficiencies. Finding 2: The data analysis revealed the lack of a responsibility tracking tool. Finding 3: The corrective action requests that were analyzed on the disapproved contractor business systems did not impact the urgent fielding of critical equipment.","abstract_has_math":false,"creators":["Loflin, Symantha C."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":null,"school":null,"contributors":[],"advisors":["Jones, Raymond D.","Pickar, Charles K."],"committee_chairs":[],"committee_members":[],"year":2020,"date_issued":"2020-09","date_published":"2020-09","updated_at":"2026-11-19T06:40:00Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States","Approved for public release. distribution is unlimited"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"],"render_values":[{"text":"836, Program Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["34326"],"render_values":[{"text":"34326","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/66098","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/66098","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F66098","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Jones, Raymond D.","Pickar, Charles K."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program","Graduate School of Defense Management (GSDM)"]},{"key":"dc:creator","label":"Author","values":["Loflin, Symantha C."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["Sep-20"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2020-11-18T00:23:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2020-11-18T00:23:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2020-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","51976d4c-d4bc-442b-9530-5a441e399dd2"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["34326"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Defense Federal Acquisition Regulation Supplement","DFARS","DFARS clause 252.242.7005 Contractor Business Systems approval and disapproval","Better Buying Power 3.0 - Achieving Dominant Capabilities through Technical Excellence and Innovation","Contract Business Analysis Repository","CBAR","contractor business systems"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States","Approved for public release. distribution is unlimited"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/66098"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research attempted to quantify the impact to the government, contractor, and warfighter of the implementation of the Better Buying Power Initiative 3.0, and specifically, Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.242.7005, Contractor Business Systems, which allowed for more stringent government oversight of contractors. Data was collected from Contract Business Analysis Repository (CBAR), which shows the contractor business systems' approval or disapproval status. A qualitative analysis was then performed using DCMA business system compliance review reports, letters, and contractor data to verify significant deficiencies with business systems that led to system disapproval. This research details the significant deficiencies of this process, given that there were contractors with multiple business system disapprovals who are still actively contracting with the federal government, potentially affecting both government efficiency and warfighter readiness. Finding 1: Analysis of the CBAR data from 2015 and 2019 for the six contractor business systems revealed that once a business system is reapproved, there is no method for viewing historical data of past deficiencies. Finding 2: The data analysis revealed the lack of a responsibility tracking tool. Finding 3: The corrective action requests that were analyzed on the disapproved contractor business systems did not impact the urgent fielding of critical equipment."]},{"key":"dc:title","label":"Title","values":["AN IMPACT ANALYSIS OF DFARS CLAUSE 252.242.7005 ON CONTRACTOR BUSINESS SYSTEM APPROVAL AND DISAPPROVAL"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Office of the Secretary of Defense"]}]}],"canonical_facts":{"dc:contributor.advisor":["Jones, Raymond D.","Pickar, Charles K."],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program","Graduate School of Defense Management (GSDM)"],"dc:creator":["Loflin, Symantha C."],"dc:date":["Sep-20"],"dc:date.accessioned":["2020-11-18T00:23:05Z"],"dc:date.available":["2020-11-18T00:23:05Z"],"dc:date.issued":["2020-09"],"dc:description.abstract":["This research attempted to quantify the impact to the government, contractor, and warfighter of the implementation of the Better Buying Power Initiative 3.0, and specifically, Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.242.7005, Contractor Business Systems, which allowed for more stringent government oversight of contractors. Data was collected from Contract Business Analysis Repository (CBAR), which shows the contractor business systems' approval or disapproval status. A qualitative analysis was then performed using DCMA business system compliance review reports, letters, and contractor data to verify significant deficiencies with business systems that led to system disapproval. This research details the significant deficiencies of this process, given that there were contractors with multiple business system disapprovals who are still actively contracting with the federal government, potentially affecting both government efficiency and warfighter readiness. Finding 1: Analysis of the CBAR data from 2015 and 2019 for the six contractor business systems revealed that once a business system is reapproved, there is no method for viewing historical data of past deficiencies. Finding 2: The data analysis revealed the lack of a responsibility tracking tool. Finding 3: The corrective action requests that were analyzed on the disapproved contractor business systems did not impact the urgent fielding of critical equipment."],"dc:identifier.programcode":["836, Program Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/66098"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","51976d4c-d4bc-442b-9530-5a441e399dd2"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States","Approved for public release. distribution is unlimited"],"dc:subject.keyword":["Defense Federal Acquisition Regulation Supplement","DFARS","DFARS clause 252.242.7005 Contractor Business Systems approval and disapproval","Better Buying Power 3.0 - Achieving Dominant Capabilities through Technical Excellence and Innovation","Contract Business Analysis Repository","CBAR","contractor business systems"],"dc:title":["AN IMPACT ANALYSIS OF DFARS CLAUSE 252.242.7005 ON CONTRACTOR BUSINESS SYSTEM APPROVAL AND DISAPPROVAL"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Office of the Secretary of Defense"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["34326"]},"updated_at":"2026-11-19T06:40:00Z"}