{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/67775"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/67775","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"METHODOLOGY FOR MODELING COST AND SCHEDULE RISK ASSOCIATED WITH RESOURCE DECISIONS INVOLVING THE U.S. ARMY'S MODERNIZATION EFFORTS FOR 2035","abstract":"Prioritization decisions using the Army Modernization and Analysis (AMA)-developed Trade-Space Decision Exploration System (TRADES) does not address programmatic variance related to cost and schedule growth. This study offers an improved methodology for modeling cost risk by employing sound cost estimation principles, distribution fitting, Monte Carlo simulations, and cost/benefit analysis to assist strategic decision makers and the acquisitions community. To that end, this approach follows a five-step methodology that (1) collects and screens cost data from the Cost Assessment Database Enterprise (CADE), (2) determines normalized cost growth factors, (3) identifies and constructs the appropriate distributions for modeling, (4) simulates cost variance among the entire program portfolio, and (5) recommends the necessary contingency cash reserve quantity associated with a decision maker’s confidence level. The result is a credible, repeatable, and effectual cost estimating methodology that promotes commodity-based models for predicting cost growth and measuring risk.","abstract_html":"Prioritization decisions using the Army Modernization and Analysis (AMA)-developed Trade-Space Decision Exploration System (TRADES) does not address programmatic variance related to cost and schedule growth. This study offers an improved methodology for modeling cost risk by employing sound cost estimation principles, distribution fitting, Monte Carlo simulations, and cost/benefit analysis to assist strategic decision makers and the acquisitions community. To that end, this approach follows a five-step methodology that (1) collects and screens cost data from the Cost Assessment Database Enterprise (CADE), (2) determines normalized cost growth factors, (3) identifies and constructs the appropriate distributions for modeling, (4) simulates cost variance among the entire program portfolio, and (5) recommends the necessary contingency cash reserve quantity associated with a decision maker’s confidence level. The result is a credible, repeatable, and effectual cost estimating methodology that promotes commodity-based models for predicting cost growth and measuring risk.","abstract_has_math":false,"creators":["McClary, Matthew A."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering","degree_level":"Masters","degree_discipline":"Systems Engineering","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Mislick, Gregory K.","Hernandez, Alejandro S.","Wade, Brian M."],"committee_chairs":[],"committee_members":["Boensel, Matthew G.","McClary, Jenifer R."],"year":2021,"date_issued":"2021-06","date_published":"2021-06","updated_at":"2026-11-19T06:40:39Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["580, Systems Engineering"],"render_values":[{"text":"580, Systems Engineering","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36525"],"render_values":[{"text":"36525","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/67775","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/67775","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F67775","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Mislick, Gregory K.","Hernandez, Alejandro S.","Wade, Brian M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Boensel, Matthew G.","McClary, Jenifer R."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["McClary, Matthew A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2021-08-27T01:37:44Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2021-08-27T01:37:44Z"]},{"key":"dc:date.issued","label":"Date","values":["2021-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36525"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["cost estimation","cost variance","risk management","Monte Carlo simulation","lognormal distribution","Army Modernization and Analysis","AMA","Trade-Space Decision Exploration System","TRADES","Cost Assessment Database Enterprise","CADE"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["580, Systems Engineering"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/67775"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Prioritization decisions using the Army Modernization and Analysis (AMA)-developed Trade-Space Decision Exploration System (TRADES) does not address programmatic variance related to cost and schedule growth. This study offers an improved methodology for modeling cost risk by employing sound cost estimation principles, distribution fitting, Monte Carlo simulations, and cost/benefit analysis to assist strategic decision makers and the acquisitions community. To that end, this approach follows a five-step methodology that (1) collects and screens cost data from the Cost Assessment Database Enterprise (CADE), (2) determines normalized cost growth factors, (3) identifies and constructs the appropriate distributions for modeling, (4) simulates cost variance among the entire program portfolio, and (5) recommends the necessary contingency cash reserve quantity associated with a decision maker’s confidence level. The result is a credible, repeatable, and effectual cost estimating methodology that promotes commodity-based models for predicting cost growth and measuring risk."]},{"key":"dc:title","label":"Title","values":["METHODOLOGY FOR MODELING COST AND SCHEDULE RISK ASSOCIATED WITH RESOURCE DECISIONS INVOLVING THE U.S. ARMY'S MODERNIZATION EFFORTS FOR 2035"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Mislick, Gregory K.","Hernandez, Alejandro S.","Wade, Brian M."],"dc:contributor.committeemember":["Boensel, Matthew G.","McClary, Jenifer R."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["McClary, Matthew A."],"dc:date.accessioned":["2021-08-27T01:37:44Z"],"dc:date.available":["2021-08-27T01:37:44Z"],"dc:date.issued":["2021-06"],"dc:description.abstract":["Prioritization decisions using the Army Modernization and Analysis (AMA)-developed Trade-Space Decision Exploration System (TRADES) does not address programmatic variance related to cost and schedule growth. This study offers an improved methodology for modeling cost risk by employing sound cost estimation principles, distribution fitting, Monte Carlo simulations, and cost/benefit analysis to assist strategic decision makers and the acquisitions community. To that end, this approach follows a five-step methodology that (1) collects and screens cost data from the Cost Assessment Database Enterprise (CADE), (2) determines normalized cost growth factors, (3) identifies and constructs the appropriate distributions for modeling, (4) simulates cost variance among the entire program portfolio, and (5) recommends the necessary contingency cash reserve quantity associated with a decision maker’s confidence level. The result is a credible, repeatable, and effectual cost estimating methodology that promotes commodity-based models for predicting cost growth and measuring risk."],"dc:identifier.programcode":["580, Systems Engineering"],"dc:identifier.uri":["https://hdl.handle.net/10945/67775"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["cost estimation","cost variance","risk management","Monte Carlo simulation","lognormal distribution","Army Modernization and Analysis","AMA","Trade-Space Decision Exploration System","TRADES","Cost Assessment Database Enterprise","CADE"],"dc:title":["METHODOLOGY FOR MODELING COST AND SCHEDULE RISK ASSOCIATED WITH RESOURCE DECISIONS INVOLVING THE U.S. ARMY'S MODERNIZATION EFFORTS FOR 2035"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, United States Army"],"thesis:degree_discipline":["Systems Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["36525"]},"updated_at":"2026-11-19T06:40:39Z"}