{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/67794"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/67794","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"CONTRACT TYPE CASE HISTORY OF THE CVN-78 AND CVN-79 PORTFOLIO ACQUISITIONS","abstract":"Analyzing whether a correlation existed between these two acquisition portfolios, we proposed and answered our four research questions. Our primary research questions and answers determined the advantages and disadvantages of contract type and whether policy initiatives shaped the acquisition strategies for the Ford-class aircraft carriers. Also, we wanted to determine how the selection of contract type can shape future acquisitions, especially when acquiring new and immature technologies. From our research, we discovered that the major difference between the acquisitions of CVN-78 and CVN-79 occurred during the detail design and construction contracts. For CVN-78, a hybrid cost type contract was awarded and was composed of multiple cost reimbursable type contracts. On the other hand, the contract selected for detail design and construction of CVN-79 was fixed price incentive fee. Additionally, policy initiatives like Better Buying Power (BBP) highly encouraged the use of incentive type contracts, especially fixed price contracts. From our research, we determined one of the reasons for the schedule and cost overruns experienced by the Ford-class aircraft carrier occurred during the acquisition of advanced yet immature technologies. MDAPs must strategically align contract type selection with technical and developmental risk in order to mitigate cost and schedule overruns. However, it must be noted that the selection of contract type alone does not indicate causation.","abstract_html":"Analyzing whether a correlation existed between these two acquisition portfolios, we proposed and answered our four research questions. Our primary research questions and answers determined the advantages and disadvantages of contract type and whether policy initiatives shaped the acquisition strategies for the Ford-class aircraft carriers. Also, we wanted to determine how the selection of contract type can shape future acquisitions, especially when acquiring new and immature technologies. From our research, we discovered that the major difference between the acquisitions of CVN-78 and CVN-79 occurred during the detail design and construction contracts. For CVN-78, a hybrid cost type contract was awarded and was composed of multiple cost reimbursable type contracts. On the other hand, the contract selected for detail design and construction of CVN-79 was fixed price incentive fee. Additionally, policy initiatives like Better Buying Power (BBP) highly encouraged the use of incentive type contracts, especially fixed price contracts. From our research, we determined one of the reasons for the schedule and cost overruns experienced by the Ford-class aircraft carrier occurred during the acquisition of advanced yet immature technologies. MDAPs must strategically align contract type selection with technical and developmental risk in order to mitigate cost and schedule overruns. However, it must be noted that the selection of contract type alone does not indicate causation.","abstract_has_math":false,"creators":["Peachey, John T.","Stromfeld, Matthew S."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Contract Management","degree_level":"Masters","degree_discipline":"Contract Management","degree_department":null,"school":null,"contributors":[],"advisors":["Seagren, Chad W.","Mortlock, Robert F."],"committee_chairs":[],"committee_members":[],"year":2021,"date_issued":"2021-06","date_published":"2021-06","updated_at":"2026-11-19T06:40:39Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["835, Contract Management (DL)"],"render_values":[{"text":"835, Contract Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["35224"],"render_values":[{"text":"35224","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/67794","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/67794","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F67794","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F67794","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Seagren, Chad W.","Mortlock, Robert F."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program","Graduate School of Defense Management (GSDM)"]},{"key":"dc:creator","label":"Author","values":["Peachey, John T.","Stromfeld, Matthew S."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2021-08-27T01:37:56Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2021-08-27T01:37:56Z"]},{"key":"dc:date.issued","label":"Date","values":["2021-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","51976d4c-d4bc-442b-9530-5a441e399dd2"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Contract Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Contract Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["35224"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["contract type","overrun","case history","CVN-78","CVN-79","risk assessment","cost","schedule","performance","quality","analysis","technology","cost-effectiveness analysis","and best practices"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["835, Contract Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/67794"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Analyzing whether a correlation existed between these two acquisition portfolios, we proposed and answered our four research questions. Our primary research questions and answers determined the advantages and disadvantages of contract type and whether policy initiatives shaped the acquisition strategies for the Ford-class aircraft carriers. Also, we wanted to determine how the selection of contract type can shape future acquisitions, especially when acquiring new and immature technologies. From our research, we discovered that the major difference between the acquisitions of CVN-78 and CVN-79 occurred during the detail design and construction contracts. For CVN-78, a hybrid cost type contract was awarded and was composed of multiple cost reimbursable type contracts. On the other hand, the contract selected for detail design and construction of CVN-79 was fixed price incentive fee. Additionally, policy initiatives like Better Buying Power (BBP) highly encouraged the use of incentive type contracts, especially fixed price contracts. From our research, we determined one of the reasons for the schedule and cost overruns experienced by the Ford-class aircraft carrier occurred during the acquisition of advanced yet immature technologies. MDAPs must strategically align contract type selection with technical and developmental risk in order to mitigate cost and schedule overruns. However, it must be noted that the selection of contract type alone does not indicate causation."]},{"key":"dc:title","label":"Title","values":["CONTRACT TYPE CASE HISTORY OF THE CVN-78 AND CVN-79 PORTFOLIO ACQUISITIONS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy","Civilian, Defense Contract Management Agency"]}]}],"canonical_facts":{"dc:contributor.advisor":["Seagren, Chad W.","Mortlock, Robert F."],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program","Graduate School of Defense Management (GSDM)"],"dc:creator":["Peachey, John T.","Stromfeld, Matthew S."],"dc:date.accessioned":["2021-08-27T01:37:56Z"],"dc:date.available":["2021-08-27T01:37:56Z"],"dc:date.issued":["2021-06"],"dc:description.abstract":["Analyzing whether a correlation existed between these two acquisition portfolios, we proposed and answered our four research questions. Our primary research questions and answers determined the advantages and disadvantages of contract type and whether policy initiatives shaped the acquisition strategies for the Ford-class aircraft carriers. Also, we wanted to determine how the selection of contract type can shape future acquisitions, especially when acquiring new and immature technologies. From our research, we discovered that the major difference between the acquisitions of CVN-78 and CVN-79 occurred during the detail design and construction contracts. For CVN-78, a hybrid cost type contract was awarded and was composed of multiple cost reimbursable type contracts. On the other hand, the contract selected for detail design and construction of CVN-79 was fixed price incentive fee. Additionally, policy initiatives like Better Buying Power (BBP) highly encouraged the use of incentive type contracts, especially fixed price contracts. From our research, we determined one of the reasons for the schedule and cost overruns experienced by the Ford-class aircraft carrier occurred during the acquisition of advanced yet immature technologies. MDAPs must strategically align contract type selection with technical and developmental risk in order to mitigate cost and schedule overruns. However, it must be noted that the selection of contract type alone does not indicate causation."],"dc:identifier.programcode":["835, Contract Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/67794"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","51976d4c-d4bc-442b-9530-5a441e399dd2"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["contract type","overrun","case history","CVN-78","CVN-79","risk assessment","cost","schedule","performance","quality","analysis","technology","cost-effectiveness analysis","and best practices"],"dc:title":["CONTRACT TYPE CASE HISTORY OF THE CVN-78 AND CVN-79 PORTFOLIO ACQUISITIONS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy","Civilian, Defense Contract Management Agency"],"thesis:degree_discipline":["Contract Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Contract Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["35224"]},"updated_at":"2026-11-19T06:40:39Z"}