{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/68794"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/68794","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"INCORPORATING PREDICTIVE MAINTENANCE BEST PRACTICES INTO MARINE CORPS TRAINING AND OPERATIONS","abstract":"The Marine Corps currently utilizes a traditional time-based strategy for ground equipment maintenance, conducting preventative maintenance at specified time intervals and corrective maintenance when failure occurs. In 2020, the Marine Corps initiated the transition from this maintenance strategy to a Condition Based Maintenance Plus (CBM+) strategy, which detects subcomponent anomalies in advance through data analytics so maintenance can be conducted before failure occurs. Hypothetically, CBM+ will generate increased cost-savings, reduce man-hour requirements, and improve operational availability for Marine Corps ground systems. Using a case study methodology, this project highlights best practices within the commercial mining, railroad, and heavy equipment industries by interviewing maintenance professionals and supplementing these discussions with existing literature. We then used a thematic analysis across five themes: organizational structure, asset classification, information technology (IT) infrastructure, data management, and maintenance decision making. By highlighting commonalities across the cases and evaluating best practices, we drew three key conclusions. First, some Marine Corps ground systems are not CBM+ compatible. Second, significant upgrades to existing maintenance infrastructure are necessary. Finally, CBM+ should be used as a decision-making framework to maximize cost-savings and combat readiness.","abstract_html":"The Marine Corps currently utilizes a traditional time-based strategy for ground equipment maintenance, conducting preventative maintenance at specified time intervals and corrective maintenance when failure occurs. In 2020, the Marine Corps initiated the transition from this maintenance strategy to a Condition Based Maintenance Plus (CBM+) strategy, which detects subcomponent anomalies in advance through data analytics so maintenance can be conducted before failure occurs. Hypothetically, CBM+ will generate increased cost-savings, reduce man-hour requirements, and improve operational availability for Marine Corps ground systems. Using a case study methodology, this project highlights best practices within the commercial mining, railroad, and heavy equipment industries by interviewing maintenance professionals and supplementing these discussions with existing literature. We then used a thematic analysis across five themes: organizational structure, asset classification, information technology (IT) infrastructure, data management, and maintenance decision making. By highlighting commonalities across the cases and evaluating best practices, we drew three key conclusions. First, some Marine Corps ground systems are not CBM+ compatible. Second, significant upgrades to existing maintenance infrastructure are necessary. Finally, CBM+ should be used as a decision-making framework to maximize cost-savings and combat readiness.","abstract_has_math":false,"creators":["Stuetelberg, Mitchell B.","Thomas, Jonathan R."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Master of Business Administration","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Regnier, Eva","Hudgens, Bryan J."],"committee_chairs":[],"committee_members":[],"year":2021,"date_issued":"2021-12","date_published":"2021-12","updated_at":"2026-11-26T00:19:34Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["827, Materiel Logistics Support Management"],"render_values":[{"text":"827, Materiel Logistics Support Management","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36936"],"render_values":[{"text":"36936","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/68794","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/68794","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F68794","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F68794","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Regnier, Eva","Hudgens, Bryan J."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:creator","label":"Author","values":["Stuetelberg, Mitchell B.","Thomas, Jonathan R."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-02-11T00:14:40Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-02-11T00:14:40Z"]},{"key":"dc:date.issued","label":"Date","values":["2021-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Master of Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36936"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["predictive maintenance","remaining useful life","expected useful life","operational availability","maintenance strategy","Marine Corps ground equipment","Condition Based Maintenance PlusCBM+)"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["827, Materiel Logistics Support Management"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/68794"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Marine Corps currently utilizes a traditional time-based strategy for ground equipment maintenance, conducting preventative maintenance at specified time intervals and corrective maintenance when failure occurs. In 2020, the Marine Corps initiated the transition from this maintenance strategy to a Condition Based Maintenance Plus (CBM+) strategy, which detects subcomponent anomalies in advance through data analytics so maintenance can be conducted before failure occurs. Hypothetically, CBM+ will generate increased cost-savings, reduce man-hour requirements, and improve operational availability for Marine Corps ground systems. Using a case study methodology, this project highlights best practices within the commercial mining, railroad, and heavy equipment industries by interviewing maintenance professionals and supplementing these discussions with existing literature. We then used a thematic analysis across five themes: organizational structure, asset classification, information technology (IT) infrastructure, data management, and maintenance decision making. By highlighting commonalities across the cases and evaluating best practices, we drew three key conclusions. First, some Marine Corps ground systems are not CBM+ compatible. Second, significant upgrades to existing maintenance infrastructure are necessary. Finally, CBM+ should be used as a decision-making framework to maximize cost-savings and combat readiness."]},{"key":"dc:title","label":"Title","values":["INCORPORATING PREDICTIVE MAINTENANCE BEST PRACTICES INTO MARINE CORPS TRAINING AND OPERATIONS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps","Major, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Regnier, Eva","Hudgens, Bryan J."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:creator":["Stuetelberg, Mitchell B.","Thomas, Jonathan R."],"dc:date.accessioned":["2022-02-11T00:14:40Z"],"dc:date.available":["2022-02-11T00:14:40Z"],"dc:date.issued":["2021-12"],"dc:description.abstract":["The Marine Corps currently utilizes a traditional time-based strategy for ground equipment maintenance, conducting preventative maintenance at specified time intervals and corrective maintenance when failure occurs. In 2020, the Marine Corps initiated the transition from this maintenance strategy to a Condition Based Maintenance Plus (CBM+) strategy, which detects subcomponent anomalies in advance through data analytics so maintenance can be conducted before failure occurs. Hypothetically, CBM+ will generate increased cost-savings, reduce man-hour requirements, and improve operational availability for Marine Corps ground systems. Using a case study methodology, this project highlights best practices within the commercial mining, railroad, and heavy equipment industries by interviewing maintenance professionals and supplementing these discussions with existing literature. We then used a thematic analysis across five themes: organizational structure, asset classification, information technology (IT) infrastructure, data management, and maintenance decision making. By highlighting commonalities across the cases and evaluating best practices, we drew three key conclusions. First, some Marine Corps ground systems are not CBM+ compatible. Second, significant upgrades to existing maintenance infrastructure are necessary. Finally, CBM+ should be used as a decision-making framework to maximize cost-savings and combat readiness."],"dc:identifier.programcode":["827, Materiel Logistics Support Management"],"dc:identifier.uri":["https://hdl.handle.net/10945/68794"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["predictive maintenance","remaining useful life","expected useful life","operational availability","maintenance strategy","Marine Corps ground equipment","Condition Based Maintenance PlusCBM+)"],"dc:title":["INCORPORATING PREDICTIVE MAINTENANCE BEST PRACTICES INTO MARINE CORPS TRAINING AND OPERATIONS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps","Major, United States Marine Corps"],"thesis:degree_discipline":["Master of Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["36936"]},"updated_at":"2026-11-26T00:19:34Z"}