{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/68797"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/68797","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"DEFICIENCIES IN THE REQUIREMENT GENERATION PHASE THAT DELAY THE LEAD TIME OF ARMY CONTRACT ACTIONS","abstract":"The purpose of this mixed-methodology study is to identify opportunities to reduce administrative requirements lead time for contracting actions at Army Contracting Command (ACC) organizations, at CONUS installation level, for future implementation across ACC units. An analysis of FY19–21 reveals issues in the training resources available to operational contract support personnel that degrade critical contract elements, increasing the procurement action lead time for service requirements. The findings show service contracts have a longer requirements generation phase than supply contracts. The longer requirements generation phase is associated with the level of complexity and required documentation for each contract action. As complexity decreases, requirements lead time also decreases. The research further reveals an inverse relationship between the use of standardized resource tools and requirements lead time; the lead time decreased as utilization rates increased. The results of the research indicate that policy implementation and consolidation of standardized resource tools would have a reductive effect on lead time for contract actions within the ACC. Additionally, the research recommends modifying the training curriculum to focus on the requirements generation phase. Furthermore, the research recommends changing table of organization and equipment (TOE) positions to require the additional skill identifier 3C for all S4s/G4s and supply sergeants at every echelon.","abstract_html":"The purpose of this mixed-methodology study is to identify opportunities to reduce administrative requirements lead time for contracting actions at Army Contracting Command (ACC) organizations, at CONUS installation level, for future implementation across ACC units. An analysis of FY19–21 reveals issues in the training resources available to operational contract support personnel that degrade critical contract elements, increasing the procurement action lead time for service requirements. The findings show service contracts have a longer requirements generation phase than supply contracts. The longer requirements generation phase is associated with the level of complexity and required documentation for each contract action. As complexity decreases, requirements lead time also decreases. The research further reveals an inverse relationship between the use of standardized resource tools and requirements lead time; the lead time decreased as utilization rates increased. The results of the research indicate that policy implementation and consolidation of standardized resource tools would have a reductive effect on lead time for contract actions within the ACC. Additionally, the research recommends modifying the training curriculum to focus on the requirements generation phase. Furthermore, the research recommends changing table of organization and equipment (TOE) positions to require the additional skill identifier 3C for all S4s/G4s and supply sergeants at every echelon.","abstract_has_math":false,"creators":["Baran, Ena G.","Bookwalter, Randy W.","Kemp, Larry V.","Villegas, Nicolas","Wolfe, Paul L., III"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Hatch, William D., II","Poree, Kelley"],"committee_chairs":[],"committee_members":["Hernandez, Alejandro S."],"year":2021,"date_issued":"2021-12","date_published":"2021-12","updated_at":"2026-11-19T06:40:39Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["522, Systems Engineering Management -- System Acquisition"],"render_values":[{"text":"522, Systems Engineering Management -- System Acquisition","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["37073"],"render_values":[{"text":"37073","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/68797","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/68797","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F68797","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F68797","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Hatch, William D., II","Poree, Kelley"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Hernandez, Alejandro S."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Baran, Ena G.","Bookwalter, Randy W.","Kemp, Larry V.","Villegas, Nicolas","Wolfe, Paul L., III"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-02-11T00:14:42Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-02-11T00:14:42Z"]},{"key":"dc:date.issued","label":"Date","values":["2021-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Systems Engineering Capstone Project Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["aad5eb3c-9f14-4b68-99ea-1a8c4ae89650"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["37073"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["contract training","contracting","acquisition lead time","ALT","requirement generation","Mission Installation Contracting Command","MICC","Army Contracting Command","ACC","procurement action lead time","PALT"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["522, Systems Engineering Management -- System Acquisition"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/68797"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this mixed-methodology study is to identify opportunities to reduce administrative requirements lead time for contracting actions at Army Contracting Command (ACC) organizations, at CONUS installation level, for future implementation across ACC units. An analysis of FY19–21 reveals issues in the training resources available to operational contract support personnel that degrade critical contract elements, increasing the procurement action lead time for service requirements. The findings show service contracts have a longer requirements generation phase than supply contracts. The longer requirements generation phase is associated with the level of complexity and required documentation for each contract action. As complexity decreases, requirements lead time also decreases. The research further reveals an inverse relationship between the use of standardized resource tools and requirements lead time; the lead time decreased as utilization rates increased. The results of the research indicate that policy implementation and consolidation of standardized resource tools would have a reductive effect on lead time for contract actions within the ACC. Additionally, the research recommends modifying the training curriculum to focus on the requirements generation phase. Furthermore, the research recommends changing table of organization and equipment (TOE) positions to require the additional skill identifier 3C for all S4s/G4s and supply sergeants at every echelon."]},{"key":"dc:title","label":"Title","values":["DEFICIENCIES IN THE REQUIREMENT GENERATION PHASE THAT DELAY THE LEAD TIME OF ARMY CONTRACT ACTIONS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Hatch, William D., II","Poree, Kelley"],"dc:contributor.committeemember":["Hernandez, Alejandro S."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Baran, Ena G.","Bookwalter, Randy W.","Kemp, Larry V.","Villegas, Nicolas","Wolfe, Paul L., III"],"dc:date.accessioned":["2022-02-11T00:14:42Z"],"dc:date.available":["2022-02-11T00:14:42Z"],"dc:date.issued":["2021-12"],"dc:description.abstract":["The purpose of this mixed-methodology study is to identify opportunities to reduce administrative requirements lead time for contracting actions at Army Contracting Command (ACC) organizations, at CONUS installation level, for future implementation across ACC units. An analysis of FY19–21 reveals issues in the training resources available to operational contract support personnel that degrade critical contract elements, increasing the procurement action lead time for service requirements. The findings show service contracts have a longer requirements generation phase than supply contracts. The longer requirements generation phase is associated with the level of complexity and required documentation for each contract action. As complexity decreases, requirements lead time also decreases. The research further reveals an inverse relationship between the use of standardized resource tools and requirements lead time; the lead time decreased as utilization rates increased. The results of the research indicate that policy implementation and consolidation of standardized resource tools would have a reductive effect on lead time for contract actions within the ACC. Additionally, the research recommends modifying the training curriculum to focus on the requirements generation phase. Furthermore, the research recommends changing table of organization and equipment (TOE) positions to require the additional skill identifier 3C for all S4s/G4s and supply sergeants at every echelon."],"dc:identifier.programcode":["522, Systems Engineering Management -- System Acquisition"],"dc:identifier.uri":["https://hdl.handle.net/10945/68797"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Systems Engineering Capstone Project Reports"],"dc:relation.orgunit":["73c095de-fa3b-4d63-8300-9b6aee5b4d62"],"dc:relation.seriesentity":["aad5eb3c-9f14-4b68-99ea-1a8c4ae89650"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["contract training","contracting","acquisition lead time","ALT","requirement generation","Mission Installation Contracting Command","MICC","Army Contracting Command","ACC","procurement action lead time","PALT"],"dc:title":["DEFICIENCIES IN THE REQUIREMENT GENERATION PHASE THAT DELAY THE LEAD TIME OF ARMY CONTRACT ACTIONS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, United States Army"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["37073"]},"updated_at":"2026-11-19T06:40:39Z"}