{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/70643"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/70643","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"THE GOVERNMENT FUNDING APPROPRIATION PROCESS AND ITS INABILITY TO KEEP UP WITH SOFTWARE AND DIGITAL TECHNOLOGY","abstract":"Software development and fielding is a fast-paced environment that is constantly evolving. In order to better keep up with the latest software technologies, the current funding process, to include the planning, programming, budgeting, and execution (PPBE) process and the funding appropriation breakout categories, must be reformed and updated. This project conducts a comparative analysis of the timeline for appropriations actions vs. the software development/fielding timelines to which the DOD is hoping to transition. After analyzing the current funding method, it is clear that methods such as the “colorless money” initiative or software-specific funding should be explored. Furthermore, a software-specific funding category would be best in promoting a rapid software acquisition environment, but more data and piloting still needs to be conducted to determine overall success.","abstract_html":"Software development and fielding is a fast-paced environment that is constantly evolving. In order to better keep up with the latest software technologies, the current funding process, to include the planning, programming, budgeting, and execution (PPBE) process and the funding appropriation breakout categories, must be reformed and updated. This project conducts a comparative analysis of the timeline for appropriations actions vs. the software development/fielding timelines to which the DOD is hoping to transition. After analyzing the current funding method, it is clear that methods such as the “colorless money” initiative or software-specific funding should be explored. Furthermore, a software-specific funding category would be best in promoting a rapid software acquisition environment, but more data and piloting still needs to be conducted to determine overall success.","abstract_has_math":false,"creators":["Calabria, Allison A."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Mortlock, Robert F."],"committee_chairs":[],"committee_members":["Dunlap, Jeffrey R."],"year":2022,"date_issued":"2022-06","date_published":"2022-06","updated_at":"2026-11-19T06:41:15Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"],"render_values":[{"text":"836, Program Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36947"],"render_values":[{"text":"36947","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/70643","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/70643","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F70643","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Mortlock, Robert F."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Dunlap, Jeffrey R."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program"]},{"key":"dc:creator","label":"Author","values":["Calabria, Allison A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-09-20T20:24:13Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-09-20T20:24:13Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36947"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["PPBE","funding categories","RDT&E","O&M","procurement","MILPERS","MILCON","Waterfall development","Agile development","Agile devops","software development","iterative development"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/70643"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Software development and fielding is a fast-paced environment that is constantly evolving. In order to better keep up with the latest software technologies, the current funding process, to include the planning, programming, budgeting, and execution (PPBE) process and the funding appropriation breakout categories, must be reformed and updated. This project conducts a comparative analysis of the timeline for appropriations actions vs. the software development/fielding timelines to which the DOD is hoping to transition. After analyzing the current funding method, it is clear that methods such as the “colorless money” initiative or software-specific funding should be explored. Furthermore, a software-specific funding category would be best in promoting a rapid software acquisition environment, but more data and piloting still needs to be conducted to determine overall success."]},{"key":"dc:title","label":"Title","values":["THE GOVERNMENT FUNDING APPROPRIATION PROCESS AND ITS INABILITY TO KEEP UP WITH SOFTWARE AND DIGITAL TECHNOLOGY"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Mortlock, Robert F."],"dc:contributor.committeemember":["Dunlap, Jeffrey R."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program"],"dc:creator":["Calabria, Allison A."],"dc:date.accessioned":["2022-09-20T20:24:13Z"],"dc:date.available":["2022-09-20T20:24:13Z"],"dc:date.issued":["2022-06"],"dc:description.abstract":["Software development and fielding is a fast-paced environment that is constantly evolving. In order to better keep up with the latest software technologies, the current funding process, to include the planning, programming, budgeting, and execution (PPBE) process and the funding appropriation breakout categories, must be reformed and updated. This project conducts a comparative analysis of the timeline for appropriations actions vs. the software development/fielding timelines to which the DOD is hoping to transition. After analyzing the current funding method, it is clear that methods such as the “colorless money” initiative or software-specific funding should be explored. Furthermore, a software-specific funding category would be best in promoting a rapid software acquisition environment, but more data and piloting still needs to be conducted to determine overall success."],"dc:identifier.programcode":["836, Program Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/70643"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["PPBE","funding categories","RDT&E","O&M","procurement","MILPERS","MILCON","Waterfall development","Agile development","Agile devops","software development","iterative development"],"dc:title":["THE GOVERNMENT FUNDING APPROPRIATION PROCESS AND ITS INABILITY TO KEEP UP WITH SOFTWARE AND DIGITAL TECHNOLOGY"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["36947"]},"updated_at":"2026-11-19T06:41:15Z"}