{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/70654"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/70654","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"AN ANALYSIS TO LENGTHEN OPERATION AND MAINTENANCE BUDGET TO 2-YEAR AND ALLOW A CARRYOVER OF EXPIRED FUNDS TO THE END OF THE FIRST QUARTER OF THE SUBSEQUENT FY","abstract":"In this thesis, I propose the extension of the operation and maintenance (O&M) appropriation or period of availability from one year to two years, along with allowing a carryover of the expired funds to cover new starts and program increases during a continuing resolution. I present both the advantages and disadvantages that such policy change would bring and argue that the advantages far outweigh the concerns raised by Congress and those who oppose the two-year proposal. Extending O&M funding availability to two years would alleviate the spike of end-of-year obligations and lower the amount of expired unobligated funds, leading to fiscal and program stability. I also discuss the opponents’ main argument against such a policy shift; i.e., Congress’s perceived loss of control. This policy proposal, if implemented, would bring much-needed budgetary flexibility and procurement stability throughout the fleet and to the DOD in general.","abstract_html":"In this thesis, I propose the extension of the operation and maintenance (O&amp;M) appropriation or period of availability from one year to two years, along with allowing a carryover of the expired funds to cover new starts and program increases during a continuing resolution. I present both the advantages and disadvantages that such policy change would bring and argue that the advantages far outweigh the concerns raised by Congress and those who oppose the two-year proposal. Extending O&amp;M funding availability to two years would alleviate the spike of end-of-year obligations and lower the amount of expired unobligated funds, leading to fiscal and program stability. I also discuss the opponents’ main argument against such a policy shift; i.e., Congress’s perceived loss of control. This policy proposal, if implemented, would bring much-needed budgetary flexibility and procurement stability throughout the fleet and to the DOD in general.","abstract_has_math":false,"creators":["Diop, Alioune S."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Contract Management","degree_level":"Masters","degree_discipline":"Contract Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Wang, Chong","Sullivan, Ryan S."],"committee_chairs":[],"committee_members":["Kaczorowski, David W."],"year":2022,"date_issued":"2022-06","date_published":"2022-06","updated_at":"2026-11-19T06:41:15Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["835, Contract Management (DL)"],"render_values":[{"text":"835, Contract Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36841"],"render_values":[{"text":"36841","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/70654","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/70654","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F70654","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F70654","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Wang, Chong","Sullivan, Ryan S."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Kaczorowski, David W."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program"]},{"key":"dc:creator","label":"Author","values":["Diop, Alioune S."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-09-20T20:38:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-09-20T20:38:12Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Contract Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Contract Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36841"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["operation and maintenance","O&M obligation","defense spending","continuing resolution","DOD"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["835, Contract Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/70654"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Includes Supplementary Material"]},{"key":"dc:description.abstract","label":"Abstract","values":["In this thesis, I propose the extension of the operation and maintenance (O&M) appropriation or period of availability from one year to two years, along with allowing a carryover of the expired funds to cover new starts and program increases during a continuing resolution. I present both the advantages and disadvantages that such policy change would bring and argue that the advantages far outweigh the concerns raised by Congress and those who oppose the two-year proposal. Extending O&M funding availability to two years would alleviate the spike of end-of-year obligations and lower the amount of expired unobligated funds, leading to fiscal and program stability. I also discuss the opponents’ main argument against such a policy shift; i.e., Congress’s perceived loss of control. This policy proposal, if implemented, would bring much-needed budgetary flexibility and procurement stability throughout the fleet and to the DOD in general."]},{"key":"dc:title","label":"Title","values":["AN ANALYSIS TO LENGTHEN OPERATION AND MAINTENANCE BUDGET TO 2-YEAR AND ALLOW A CARRYOVER OF EXPIRED FUNDS TO THE END OF THE FIRST QUARTER OF THE SUBSEQUENT FY"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Wang, Chong","Sullivan, Ryan S."],"dc:contributor.committeemember":["Kaczorowski, David W."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program"],"dc:creator":["Diop, Alioune S."],"dc:date.accessioned":["2022-09-20T20:38:12Z"],"dc:date.available":["2022-09-20T20:38:12Z"],"dc:date.issued":["2022-06"],"dc:description":["Includes Supplementary Material"],"dc:description.abstract":["In this thesis, I propose the extension of the operation and maintenance (O&M) appropriation or period of availability from one year to two years, along with allowing a carryover of the expired funds to cover new starts and program increases during a continuing resolution. I present both the advantages and disadvantages that such policy change would bring and argue that the advantages far outweigh the concerns raised by Congress and those who oppose the two-year proposal. Extending O&M funding availability to two years would alleviate the spike of end-of-year obligations and lower the amount of expired unobligated funds, leading to fiscal and program stability. I also discuss the opponents’ main argument against such a policy shift; i.e., Congress’s perceived loss of control. This policy proposal, if implemented, would bring much-needed budgetary flexibility and procurement stability throughout the fleet and to the DOD in general."],"dc:identifier.programcode":["835, Contract Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/70654"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["operation and maintenance","O&M obligation","defense spending","continuing resolution","DOD"],"dc:title":["AN ANALYSIS TO LENGTHEN OPERATION AND MAINTENANCE BUDGET TO 2-YEAR AND ALLOW A CARRYOVER OF EXPIRED FUNDS TO THE END OF THE FIRST QUARTER OF THE SUBSEQUENT FY"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Contract Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Contract Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["36841"]},"updated_at":"2026-11-19T06:41:15Z"}