{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/70657"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/70657","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"USE OF FLEET AVIATION ELECTRONIC ATTACK SQUADRONS FOR OPERATIONAL TEST AND EVALUATION OF NEXT GENERATION JAMMER MID-BAND (ALQ-249) PROGRAM","abstract":"The purpose of this research is to analyze the potential advantages, disadvantages, and risks to cost, schedule, and performance of shifting the role of operational test and evaluation (OT&E) of the Next Generation Jammer Mid-Band (NGJ-MB) program from a dedicated OT&E squadron at Air Test and Evaluation Squadron Nine (AIRTEVRON NINE; VX-9) to a fleet aviation electronic attack squadron. The operational constraints of the modern Naval Aviation Enterprise (NAE) squadron to deploy as part of the warfighting force against a peer adversary is examined to identify the risks to the successful OT&E of the NGJ-MB program. My methodology includes examining fleet operational tempo and the Navy’s Optimized Fleet Response Plan scheduling, resourcing, training, proficiency, tactical expertise, and administration. A strengths, weaknesses, opportunities, and threats analysis, followed by a cost-effective analysis, are used to analyze the risks to test execution and reporting compared to VX-9. In the research conclusion, I recommend the more beneficial, efficient, and effective path to execute OT&E for the NGJ-MB program. The consequences to cost, schedule, and performance to the NGJ-MB program give high confidence that fleet aviation squadrons should not be tasked to perform OT&E. VX-9 should be properly resourced, funded, and supported by the Navy to assess the operational effectiveness and suitability of the NGJ-MB pod.","abstract_html":"The purpose of this research is to analyze the potential advantages, disadvantages, and risks to cost, schedule, and performance of shifting the role of operational test and evaluation (OT&amp;E) of the Next Generation Jammer Mid-Band (NGJ-MB) program from a dedicated OT&amp;E squadron at Air Test and Evaluation Squadron Nine (AIRTEVRON NINE; VX-9) to a fleet aviation electronic attack squadron. The operational constraints of the modern Naval Aviation Enterprise (NAE) squadron to deploy as part of the warfighting force against a peer adversary is examined to identify the risks to the successful OT&amp;E of the NGJ-MB program. My methodology includes examining fleet operational tempo and the Navy’s Optimized Fleet Response Plan scheduling, resourcing, training, proficiency, tactical expertise, and administration. A strengths, weaknesses, opportunities, and threats analysis, followed by a cost-effective analysis, are used to analyze the risks to test execution and reporting compared to VX-9. In the research conclusion, I recommend the more beneficial, efficient, and effective path to execute OT&amp;E for the NGJ-MB program. The consequences to cost, schedule, and performance to the NGJ-MB program give high confidence that fleet aviation squadrons should not be tasked to perform OT&amp;E. VX-9 should be properly resourced, funded, and supported by the Navy to assess the operational effectiveness and suitability of the NGJ-MB pod.","abstract_has_math":false,"creators":["Duran, Gabriel P."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Mortlock, Robert F."],"committee_chairs":[],"committee_members":[],"year":2022,"date_issued":"2022-06","date_published":"2022-06","updated_at":"2026-11-19T06:41:15Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"],"render_values":[{"text":"836, Program Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36935"],"render_values":[{"text":"36935","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/70657","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/70657","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F70657","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Mortlock, Robert F."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program"]},{"key":"dc:creator","label":"Author","values":["Duran, Gabriel P."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-09-20T20:38:13Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-09-20T20:38:13Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36935"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["operational test and evaluation","OT&E","Air Test and Evaluation Squadron Nine","AIRTEVRON NINE","VX-9","follow-on operational test and evaluation","FOT&E","initial operational test and evaluation","IOT&E","naval aviation","optimized fleet response plan","OFRP","Naval Aviation Enterprise","NAE","Next Generation Jammer Mid-Band","NGJ-MB","ALQ-249","electronic attack","electronic warfare","EW","VAQ","VX","adjunct testers"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/70657"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this research is to analyze the potential advantages, disadvantages, and risks to cost, schedule, and performance of shifting the role of operational test and evaluation (OT&E) of the Next Generation Jammer Mid-Band (NGJ-MB) program from a dedicated OT&E squadron at Air Test and Evaluation Squadron Nine (AIRTEVRON NINE; VX-9) to a fleet aviation electronic attack squadron. The operational constraints of the modern Naval Aviation Enterprise (NAE) squadron to deploy as part of the warfighting force against a peer adversary is examined to identify the risks to the successful OT&E of the NGJ-MB program. My methodology includes examining fleet operational tempo and the Navy’s Optimized Fleet Response Plan scheduling, resourcing, training, proficiency, tactical expertise, and administration. A strengths, weaknesses, opportunities, and threats analysis, followed by a cost-effective analysis, are used to analyze the risks to test execution and reporting compared to VX-9. In the research conclusion, I recommend the more beneficial, efficient, and effective path to execute OT&E for the NGJ-MB program. The consequences to cost, schedule, and performance to the NGJ-MB program give high confidence that fleet aviation squadrons should not be tasked to perform OT&E. VX-9 should be properly resourced, funded, and supported by the Navy to assess the operational effectiveness and suitability of the NGJ-MB pod."]},{"key":"dc:title","label":"Title","values":["USE OF FLEET AVIATION ELECTRONIC ATTACK SQUADRONS FOR OPERATIONAL TEST AND EVALUATION OF NEXT GENERATION JAMMER MID-BAND (ALQ-249) PROGRAM"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Mortlock, Robert F."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program"],"dc:creator":["Duran, Gabriel P."],"dc:date.accessioned":["2022-09-20T20:38:13Z"],"dc:date.available":["2022-09-20T20:38:13Z"],"dc:date.issued":["2022-06"],"dc:description.abstract":["The purpose of this research is to analyze the potential advantages, disadvantages, and risks to cost, schedule, and performance of shifting the role of operational test and evaluation (OT&E) of the Next Generation Jammer Mid-Band (NGJ-MB) program from a dedicated OT&E squadron at Air Test and Evaluation Squadron Nine (AIRTEVRON NINE; VX-9) to a fleet aviation electronic attack squadron. The operational constraints of the modern Naval Aviation Enterprise (NAE) squadron to deploy as part of the warfighting force against a peer adversary is examined to identify the risks to the successful OT&E of the NGJ-MB program. My methodology includes examining fleet operational tempo and the Navy’s Optimized Fleet Response Plan scheduling, resourcing, training, proficiency, tactical expertise, and administration. A strengths, weaknesses, opportunities, and threats analysis, followed by a cost-effective analysis, are used to analyze the risks to test execution and reporting compared to VX-9. In the research conclusion, I recommend the more beneficial, efficient, and effective path to execute OT&E for the NGJ-MB program. The consequences to cost, schedule, and performance to the NGJ-MB program give high confidence that fleet aviation squadrons should not be tasked to perform OT&E. VX-9 should be properly resourced, funded, and supported by the Navy to assess the operational effectiveness and suitability of the NGJ-MB pod."],"dc:identifier.programcode":["836, Program Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/70657"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["operational test and evaluation","OT&E","Air Test and Evaluation Squadron Nine","AIRTEVRON NINE","VX-9","follow-on operational test and evaluation","FOT&E","initial operational test and evaluation","IOT&E","naval aviation","optimized fleet response plan","OFRP","Naval Aviation Enterprise","NAE","Next Generation Jammer Mid-Band","NGJ-MB","ALQ-249","electronic attack","electronic warfare","EW","VAQ","VX","adjunct testers"],"dc:title":["USE OF FLEET AVIATION ELECTRONIC ATTACK SQUADRONS FOR OPERATIONAL TEST AND EVALUATION OF NEXT GENERATION JAMMER MID-BAND (ALQ-249) PROGRAM"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["36935"]},"updated_at":"2026-11-19T06:41:15Z"}