{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/70692"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/70692","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"DEVELOPING A PROJECT MANAGER COMPETENCY MODEL TO BETTER SERVE THE WARFIGHTER AND THE DOD","abstract":"As of today, the Department of Defense (DOD) project management competencies are structured differently from industry. Industry has made advancements in project management that the DOD does not currently take advantage of. By better aligning the DOD and PMI competency standards we can decrease cost, schedule, and performance issues. Based on previous research on the topic, the current DOD competency model is not sufficient for assessing today’s program managers. The purpose of this research is to use the three PMI industry standards to develop a survey tool to better serve the DOD acquisition workforce. We were able to create this survey tool and hope that, by using this survey tool, future research teams will be able to effectively gauge the acquisition community’s correlation between the three PMI standards and the current DOD workload. The information gathered from this research can be useful not only to DOD acquisition communities, but also can set future guidelines to program managers in order to save the DOD on schedule, cost, and performance.","abstract_html":"As of today, the Department of Defense (DOD) project management competencies are structured differently from industry. Industry has made advancements in project management that the DOD does not currently take advantage of. By better aligning the DOD and PMI competency standards we can decrease cost, schedule, and performance issues. Based on previous research on the topic, the current DOD competency model is not sufficient for assessing today’s program managers. The purpose of this research is to use the three PMI industry standards to develop a survey tool to better serve the DOD acquisition workforce. We were able to create this survey tool and hope that, by using this survey tool, future research teams will be able to effectively gauge the acquisition community’s correlation between the three PMI standards and the current DOD workload. The information gathered from this research can be useful not only to DOD acquisition communities, but also can set future guidelines to program managers in order to save the DOD on schedule, cost, and performance.","abstract_has_math":false,"creators":["Hughes, Justin M.","Flanigan, Daniel"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Mortlock, Robert F."],"committee_chairs":[],"committee_members":["Pickar, Charles K."],"year":2022,"date_issued":"2022-06","date_published":"2022-06","updated_at":"2026-11-19T06:41:15Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"],"render_values":[{"text":"836, Program Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36495"],"render_values":[{"text":"36495","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/70692","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/70692","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F70692","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F70692","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Mortlock, Robert F."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Pickar, Charles K."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program"]},{"key":"dc:creator","label":"Author","values":["Hughes, Justin M.","Flanigan, Daniel"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-09-20T20:51:17Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-09-20T20:51:17Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["1d587abe-856b-43bb-921f-71f9622f0c1f"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["3415a483-9a27-45df-a6e3-96141dbeeadd"]},{"key":"dc:type","label":"Dc Type","values":["Thesis","Joint Applied Project Report"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36495"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["project management","PM","competency model","Project Management Institute","PMI","Department of Defense","DOD"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/70692"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["As of today, the Department of Defense (DOD) project management competencies are structured differently from industry. Industry has made advancements in project management that the DOD does not currently take advantage of. By better aligning the DOD and PMI competency standards we can decrease cost, schedule, and performance issues. Based on previous research on the topic, the current DOD competency model is not sufficient for assessing today’s program managers. The purpose of this research is to use the three PMI industry standards to develop a survey tool to better serve the DOD acquisition workforce. We were able to create this survey tool and hope that, by using this survey tool, future research teams will be able to effectively gauge the acquisition community’s correlation between the three PMI standards and the current DOD workload. The information gathered from this research can be useful not only to DOD acquisition communities, but also can set future guidelines to program managers in order to save the DOD on schedule, cost, and performance."]},{"key":"dc:title","label":"Title","values":["DEVELOPING A PROJECT MANAGER COMPETENCY MODEL TO BETTER SERVE THE WARFIGHTER AND THE DOD"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Mortlock, Robert F."],"dc:contributor.committeemember":["Pickar, Charles K."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program"],"dc:creator":["Hughes, Justin M.","Flanigan, Daniel"],"dc:date.accessioned":["2022-09-20T20:51:17Z"],"dc:date.available":["2022-09-20T20:51:17Z"],"dc:date.issued":["2022-06"],"dc:description.abstract":["As of today, the Department of Defense (DOD) project management competencies are structured differently from industry. Industry has made advancements in project management that the DOD does not currently take advantage of. By better aligning the DOD and PMI competency standards we can decrease cost, schedule, and performance issues. Based on previous research on the topic, the current DOD competency model is not sufficient for assessing today’s program managers. The purpose of this research is to use the three PMI industry standards to develop a survey tool to better serve the DOD acquisition workforce. We were able to create this survey tool and hope that, by using this survey tool, future research teams will be able to effectively gauge the acquisition community’s correlation between the three PMI standards and the current DOD workload. The information gathered from this research can be useful not only to DOD acquisition communities, but also can set future guidelines to program managers in order to save the DOD on schedule, cost, and performance."],"dc:identifier.programcode":["836, Program Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/70692"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["1d587abe-856b-43bb-921f-71f9622f0c1f"],"dc:relation.seriesentity":["3415a483-9a27-45df-a6e3-96141dbeeadd"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["project management","PM","competency model","Project Management Institute","PMI","Department of Defense","DOD"],"dc:title":["DEVELOPING A PROJECT MANAGER COMPETENCY MODEL TO BETTER SERVE THE WARFIGHTER AND THE DOD"],"dc:type":["Thesis","Joint Applied Project Report"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["36495"]},"updated_at":"2026-11-19T06:41:15Z"}