{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/70747"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/70747","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"ANALYSIS OF THE SCALE OF ANNUAL APPROPRIATION RETURNED TO THE U.S. TREASURY","abstract":"This thesis examines the planning, programming, budgeting, and execution (PPBE) process and key contributors to passing a budget. Comptroller funding data from 2015–2019 were extracted and analyzed. The analysis investigated the Appropriation approval date and unobligated Operation and Maintenance funds for the DOD, USN, and Navy. The most extensive range in un-obligated returned funds occurred in 2017, with 0.16% for the DON and USN combined and 3.17% for the DOD topline (a delta of 30.46%). Data indicates that the propensity for unobligated funds at the conclusion of the FY increases with more extended continuous resolutions (CR). Additionally, delayed Defense Appropriations have negative consequences on funding and execution. The inability to provide reliable, consistent funding for National Defense also influences the strategic planning efforts that play a significant role in developing the National Defense Strategy (NDS) and the National Security Strategy (NSS). A stable budgetary environment has only existed in approximately 10% of the previous 40-year budget periods. Unobligated funding indicates rigid spending within the current PPBE process, delayed congressional budget approval, and lengthy CRs. Future research could investigate the COVID-19 impacts due to restricted movement, remote work, and hindrances to the supply chain to identify additional areas to increase the flexibility of the PPBE process.","abstract_html":"This thesis examines the planning, programming, budgeting, and execution (PPBE) process and key contributors to passing a budget. Comptroller funding data from 2015–2019 were extracted and analyzed. The analysis investigated the Appropriation approval date and unobligated Operation and Maintenance funds for the DOD, USN, and Navy. The most extensive range in un-obligated returned funds occurred in 2017, with 0.16% for the DON and USN combined and 3.17% for the DOD topline (a delta of 30.46%). Data indicates that the propensity for unobligated funds at the conclusion of the FY increases with more extended continuous resolutions (CR). Additionally, delayed Defense Appropriations have negative consequences on funding and execution. The inability to provide reliable, consistent funding for National Defense also influences the strategic planning efforts that play a significant role in developing the National Defense Strategy (NDS) and the National Security Strategy (NSS). A stable budgetary environment has only existed in approximately 10% of the previous 40-year budget periods. Unobligated funding indicates rigid spending within the current PPBE process, delayed congressional budget approval, and lengthy CRs. Future research could investigate the COVID-19 impacts due to restricted movement, remote work, and hindrances to the supply chain to identify additional areas to increase the flexibility of the PPBE process.","abstract_has_math":false,"creators":["Maple, Laura","Pomy, John B."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Mortlock, Robert F."],"committee_chairs":[],"committee_members":["Jones, Raymond D."],"year":2022,"date_issued":"2022-06","date_published":"2022-06","updated_at":"2026-11-19T06:41:15Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"],"render_values":[{"text":"836, Program Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36878"],"render_values":[{"text":"36878","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/70747","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/70747","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F70747","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Mortlock, Robert F."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Jones, Raymond D."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program"]},{"key":"dc:creator","label":"Author","values":["Maple, Laura","Pomy, John B."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-09-20T21:37:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-09-20T21:37:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36878"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["big “A” acquisition","appropriations","operations and maintenance","O&M","obligations","National Defense Authorization Acts","continuing resolutions","CRs","budget","Navy","Department of Defense","National Defense Strategy","National Security Strategy","Planning","Programming","and Execution","PPBE"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/70747"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis examines the planning, programming, budgeting, and execution (PPBE) process and key contributors to passing a budget. Comptroller funding data from 2015–2019 were extracted and analyzed. The analysis investigated the Appropriation approval date and unobligated Operation and Maintenance funds for the DOD, USN, and Navy. The most extensive range in un-obligated returned funds occurred in 2017, with 0.16% for the DON and USN combined and 3.17% for the DOD topline (a delta of 30.46%). Data indicates that the propensity for unobligated funds at the conclusion of the FY increases with more extended continuous resolutions (CR). Additionally, delayed Defense Appropriations have negative consequences on funding and execution. The inability to provide reliable, consistent funding for National Defense also influences the strategic planning efforts that play a significant role in developing the National Defense Strategy (NDS) and the National Security Strategy (NSS). A stable budgetary environment has only existed in approximately 10% of the previous 40-year budget periods. Unobligated funding indicates rigid spending within the current PPBE process, delayed congressional budget approval, and lengthy CRs. Future research could investigate the COVID-19 impacts due to restricted movement, remote work, and hindrances to the supply chain to identify additional areas to increase the flexibility of the PPBE process."]},{"key":"dc:title","label":"Title","values":["ANALYSIS OF THE SCALE OF ANNUAL APPROPRIATION RETURNED TO THE U.S. TREASURY"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy","Major, United States Marine Corps Reserve"]}]}],"canonical_facts":{"dc:contributor.advisor":["Mortlock, Robert F."],"dc:contributor.committeemember":["Jones, Raymond D."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program"],"dc:creator":["Maple, Laura","Pomy, John B."],"dc:date.accessioned":["2022-09-20T21:37:05Z"],"dc:date.available":["2022-09-20T21:37:05Z"],"dc:date.issued":["2022-06"],"dc:description.abstract":["This thesis examines the planning, programming, budgeting, and execution (PPBE) process and key contributors to passing a budget. Comptroller funding data from 2015–2019 were extracted and analyzed. The analysis investigated the Appropriation approval date and unobligated Operation and Maintenance funds for the DOD, USN, and Navy. The most extensive range in un-obligated returned funds occurred in 2017, with 0.16% for the DON and USN combined and 3.17% for the DOD topline (a delta of 30.46%). Data indicates that the propensity for unobligated funds at the conclusion of the FY increases with more extended continuous resolutions (CR). Additionally, delayed Defense Appropriations have negative consequences on funding and execution. The inability to provide reliable, consistent funding for National Defense also influences the strategic planning efforts that play a significant role in developing the National Defense Strategy (NDS) and the National Security Strategy (NSS). A stable budgetary environment has only existed in approximately 10% of the previous 40-year budget periods. Unobligated funding indicates rigid spending within the current PPBE process, delayed congressional budget approval, and lengthy CRs. Future research could investigate the COVID-19 impacts due to restricted movement, remote work, and hindrances to the supply chain to identify additional areas to increase the flexibility of the PPBE process."],"dc:identifier.programcode":["836, Program Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/70747"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["big “A” acquisition","appropriations","operations and maintenance","O&M","obligations","National Defense Authorization Acts","continuing resolutions","CRs","budget","Navy","Department of Defense","National Defense Strategy","National Security Strategy","Planning","Programming","and Execution","PPBE"],"dc:title":["ANALYSIS OF THE SCALE OF ANNUAL APPROPRIATION RETURNED TO THE U.S. TREASURY"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy","Major, United States Marine Corps Reserve"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["36878"]},"updated_at":"2026-11-19T06:41:15Z"}