{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/71118"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/71118","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"BETTER ESTIMATION OF COMPLETION TIMES FOR SHIPS UNDERGOING CNO AVAILABILITIES","abstract":"United States Navy (USN) surface ships must complete routine maintenance, repair work or upgrades in order to maintain operations to support the fleet. However, a large majority of planned maintenance availabilities exceed their schedule and consequently decrease their readiness to support the fleet and negatively impact ship readiness and operational availability. The USN uses an Availability Duration Scorecard (ADS) to manually determine surface ship maintenance durations, but it does not accurately capture the complexity of the work required. There is a need for more accurate predictions using ADS that include a detailed evaluation of work performed, to include the complexity of specific tasks. This thesis conducts an analysis of the tanks and voids maintenance activity duration estimates for three classes of USN ships. Regression analysis is conducted on ships where the availability duration substantially exceeded the ADS estimate. Regression shows no statistically significant relationship between the number of maintenance activities on tanks and voids and the total availability duration. Additionally, there is no statistically significant relationship between unplanned tanks and voids maintenance activities and the total availability duration.","abstract_html":"United States Navy (USN) surface ships must complete routine maintenance, repair work or upgrades in order to maintain operations to support the fleet. However, a large majority of planned maintenance availabilities exceed their schedule and consequently decrease their readiness to support the fleet and negatively impact ship readiness and operational availability. The USN uses an Availability Duration Scorecard (ADS) to manually determine surface ship maintenance durations, but it does not accurately capture the complexity of the work required. There is a need for more accurate predictions using ADS that include a detailed evaluation of work performed, to include the complexity of specific tasks. This thesis conducts an analysis of the tanks and voids maintenance activity duration estimates for three classes of USN ships. Regression analysis is conducted on ships where the availability duration substantially exceeded the ADS estimate. Regression shows no statistically significant relationship between the number of maintenance activities on tanks and voids and the total availability duration. Additionally, there is no statistically significant relationship between unplanned tanks and voids maintenance activities and the total availability duration.","abstract_has_math":false,"creators":["Lee, Amy W."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Beery, Paul T.","Giachetti, Ronald E."],"committee_chairs":[],"committee_members":[],"year":2022,"date_issued":"2022-09","date_published":"2022-09","updated_at":"2026-11-26T00:20:51Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["NRP-22-N345-A"],"render_values":[{"text":"NRP-22-N345-A","href":null,"code":true}]},{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["721, Systems Engineering Management-PD21 (DL)"],"render_values":[{"text":"721, Systems Engineering Management-PD21 (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["37231"],"render_values":[{"text":"37231","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/71118","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/71118","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F71118","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F71118","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Beery, Paul T.","Giachetti, Ronald E."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Research Program (NRP)"]},{"key":"dc:creator","label":"Author","values":["Lee, Amy W."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-11-17T20:55:30Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-11-17T20:55:30Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Naval Research Program (NRP) Project Documents"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["73c095de-fa3b-4d63-8300-9b6aee5b4d62","78e1a7f9-aa70-4b0c-8c2c-4ff04808d293"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["2c25ebbb-dea7-48fc-8f19-5278e52aa428"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["37231"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["availability","availability duration scorecard","CNO","maintenance","maintenance delay","on-time delivery","ship availability","ship maintenance","modernization","surface ships"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["NRP-22-N345-A"]},{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["721, Systems Engineering Management-PD21 (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/71118"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Student Thesis (NPS NRP Project Related)"]},{"key":"dc:description.abstract","label":"Abstract","values":["United States Navy (USN) surface ships must complete routine maintenance, repair work or upgrades in order to maintain operations to support the fleet. However, a large majority of planned maintenance availabilities exceed their schedule and consequently decrease their readiness to support the fleet and negatively impact ship readiness and operational availability. The USN uses an Availability Duration Scorecard (ADS) to manually determine surface ship maintenance durations, but it does not accurately capture the complexity of the work required. There is a need for more accurate predictions using ADS that include a detailed evaluation of work performed, to include the complexity of specific tasks. This thesis conducts an analysis of the tanks and voids maintenance activity duration estimates for three classes of USN ships. Regression analysis is conducted on ships where the availability duration substantially exceeded the ADS estimate. Regression shows no statistically significant relationship between the number of maintenance activities on tanks and voids and the total availability duration. Additionally, there is no statistically significant relationship between unplanned tanks and voids maintenance activities and the total availability duration."]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NPS Naval Research Program","This research is supported by funding from the Naval Postgraduate School, Naval Research Program (PE 0605853N/2098). https://nps.edu/nrp","This project was funded in part by the NPS Naval Research Program.","Chief of Naval Operations (CNO)"]},{"key":"dc:title","label":"Title","values":["BETTER ESTIMATION OF COMPLETION TIMES FOR SHIPS UNDERGOING CNO AVAILABILITIES"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Beery, Paul T.","Giachetti, Ronald E."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:contributor.other":["Naval Research Program (NRP)"],"dc:creator":["Lee, Amy W."],"dc:date.accessioned":["2022-11-17T20:55:30Z"],"dc:date.available":["2022-11-17T20:55:30Z"],"dc:date.issued":["2022-09"],"dc:description":["Student Thesis (NPS NRP Project Related)"],"dc:description.abstract":["United States Navy (USN) surface ships must complete routine maintenance, repair work or upgrades in order to maintain operations to support the fleet. However, a large majority of planned maintenance availabilities exceed their schedule and consequently decrease their readiness to support the fleet and negatively impact ship readiness and operational availability. The USN uses an Availability Duration Scorecard (ADS) to manually determine surface ship maintenance durations, but it does not accurately capture the complexity of the work required. There is a need for more accurate predictions using ADS that include a detailed evaluation of work performed, to include the complexity of specific tasks. This thesis conducts an analysis of the tanks and voids maintenance activity duration estimates for three classes of USN ships. Regression analysis is conducted on ships where the availability duration substantially exceeded the ADS estimate. Regression shows no statistically significant relationship between the number of maintenance activities on tanks and voids and the total availability duration. Additionally, there is no statistically significant relationship between unplanned tanks and voids maintenance activities and the total availability duration."],"dc:description.sponsorship":["NPS Naval Research Program","This research is supported by funding from the Naval Postgraduate School, Naval Research Program (PE 0605853N/2098). https://nps.edu/nrp","This project was funded in part by the NPS Naval Research Program.","Chief of Naval Operations (CNO)"],"dc:identifier.other":["NRP-22-N345-A"],"dc:identifier.programcode":["721, Systems Engineering Management-PD21 (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/71118"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Naval Research Program (NRP) Project Documents"],"dc:relation.orgunit":["73c095de-fa3b-4d63-8300-9b6aee5b4d62","78e1a7f9-aa70-4b0c-8c2c-4ff04808d293"],"dc:relation.seriesentity":["2c25ebbb-dea7-48fc-8f19-5278e52aa428"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["availability","availability duration scorecard","CNO","maintenance","maintenance delay","on-time delivery","ship availability","ship maintenance","modernization","surface ships"],"dc:title":["BETTER ESTIMATION OF COMPLETION TIMES FOR SHIPS UNDERGOING CNO AVAILABILITIES"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["37231"]},"updated_at":"2026-11-26T00:20:51Z"}