{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/71120"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/71120","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"THE HIGH RISK OF INCURRED COST LOW-RISK MEMOS","abstract":"Despite the high risk of cost-reimbursement contracts to the government, it is a necessary contract type used in Department of Defense (DOD) acquisition. The high risks may be avoided with adequate contract administration oversight and proper auditing procedures. The purpose of this research was to analyze the impact of the DOD USD Class Deviation 2012-O0013—Defense Contract Audit Agency (DCAA) Policy and Procedure for Sampling Low-Risk Incurred Cost Proposals on the quantity of audits performed and amount of questioned costs identified, as well as analyze the impact of the low-risk memos (LRM) issued under this class deviation on incurred cost proposals not audited. This research highlights the possible risks of performing less incurred cost proposal audits on DOD contractors and the increased reliance of LRMs in the contract administration and closeout of high-risk cost-reimbursement contracts. The research findings indicate a significant reduction in the quantity of incurred cost proposal audits and the amount of questioned costs identified, existence of questioned costs in contracts subject to LRMs, and a major audit policy non-compliance. Recommendations include notifying senior contracting officials of a non-compliance in DCAA audit policy pertaining to Class Deviation 2012-O0013, revising the low-risk sampling criteria, and establishing additional procedures in the administration and closeout of cost-reimbursement contracts.","abstract_html":"Despite the high risk of cost-reimbursement contracts to the government, it is a necessary contract type used in Department of Defense (DOD) acquisition. The high risks may be avoided with adequate contract administration oversight and proper auditing procedures. The purpose of this research was to analyze the impact of the DOD USD Class Deviation 2012-O0013—Defense Contract Audit Agency (DCAA) Policy and Procedure for Sampling Low-Risk Incurred Cost Proposals on the quantity of audits performed and amount of questioned costs identified, as well as analyze the impact of the low-risk memos (LRM) issued under this class deviation on incurred cost proposals not audited. This research highlights the possible risks of performing less incurred cost proposal audits on DOD contractors and the increased reliance of LRMs in the contract administration and closeout of high-risk cost-reimbursement contracts. The research findings indicate a significant reduction in the quantity of incurred cost proposal audits and the amount of questioned costs identified, existence of questioned costs in contracts subject to LRMs, and a major audit policy non-compliance. Recommendations include notifying senior contracting officials of a non-compliance in DCAA audit policy pertaining to Class Deviation 2012-O0013, revising the low-risk sampling criteria, and establishing additional procedures in the administration and closeout of cost-reimbursement contracts.","abstract_has_math":false,"creators":["Ruffing, Edward"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Contract Management","degree_level":"Masters","degree_discipline":"Contract Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Butka, Frank","Rendon, Juanita"],"committee_chairs":[],"committee_members":[],"year":2022,"date_issued":"2022-09","date_published":"2022-09","updated_at":"2026-11-24T23:54:17Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["835, Contract Management (DL)"],"render_values":[{"text":"835, Contract Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38883"],"render_values":[{"text":"38883","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/71120","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/71120","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F71120","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F71120","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Butka, Frank","Rendon, Juanita"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program"]},{"key":"dc:creator","label":"Author","values":["Ruffing, Edward"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-11-17T20:55:31Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-11-17T20:55:31Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["02a7402e-0f07-4fd9-991c-e4b648078d60"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Contract Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Contract Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38883"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["low-risk memos","incurred cost proposal","incurred cost audit","cost reimbursement contract","final indirect cost rates","sampling low-risk incurred cost proposals","class deviation 2012-O0013","DCAA incurred cost proposal audits"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["835, Contract Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/71120"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Includes supplementary material"]},{"key":"dc:description.abstract","label":"Abstract","values":["Despite the high risk of cost-reimbursement contracts to the government, it is a necessary contract type used in Department of Defense (DOD) acquisition. The high risks may be avoided with adequate contract administration oversight and proper auditing procedures. The purpose of this research was to analyze the impact of the DOD USD Class Deviation 2012-O0013—Defense Contract Audit Agency (DCAA) Policy and Procedure for Sampling Low-Risk Incurred Cost Proposals on the quantity of audits performed and amount of questioned costs identified, as well as analyze the impact of the low-risk memos (LRM) issued under this class deviation on incurred cost proposals not audited. This research highlights the possible risks of performing less incurred cost proposal audits on DOD contractors and the increased reliance of LRMs in the contract administration and closeout of high-risk cost-reimbursement contracts. The research findings indicate a significant reduction in the quantity of incurred cost proposal audits and the amount of questioned costs identified, existence of questioned costs in contracts subject to LRMs, and a major audit policy non-compliance. Recommendations include notifying senior contracting officials of a non-compliance in DCAA audit policy pertaining to Class Deviation 2012-O0013, revising the low-risk sampling criteria, and establishing additional procedures in the administration and closeout of cost-reimbursement contracts."]},{"key":"dc:title","label":"Title","values":["THE HIGH RISK OF INCURRED COST LOW-RISK MEMOS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Defense Contract Management Agency"]}]}],"canonical_facts":{"dc:contributor.advisor":["Butka, Frank","Rendon, Juanita"],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program"],"dc:creator":["Ruffing, Edward"],"dc:date.accessioned":["2022-11-17T20:55:31Z"],"dc:date.available":["2022-11-17T20:55:31Z"],"dc:date.issued":["2022-09"],"dc:description":["Includes supplementary material"],"dc:description.abstract":["Despite the high risk of cost-reimbursement contracts to the government, it is a necessary contract type used in Department of Defense (DOD) acquisition. The high risks may be avoided with adequate contract administration oversight and proper auditing procedures. The purpose of this research was to analyze the impact of the DOD USD Class Deviation 2012-O0013—Defense Contract Audit Agency (DCAA) Policy and Procedure for Sampling Low-Risk Incurred Cost Proposals on the quantity of audits performed and amount of questioned costs identified, as well as analyze the impact of the low-risk memos (LRM) issued under this class deviation on incurred cost proposals not audited. This research highlights the possible risks of performing less incurred cost proposal audits on DOD contractors and the increased reliance of LRMs in the contract administration and closeout of high-risk cost-reimbursement contracts. The research findings indicate a significant reduction in the quantity of incurred cost proposal audits and the amount of questioned costs identified, existence of questioned costs in contracts subject to LRMs, and a major audit policy non-compliance. Recommendations include notifying senior contracting officials of a non-compliance in DCAA audit policy pertaining to Class Deviation 2012-O0013, revising the low-risk sampling criteria, and establishing additional procedures in the administration and closeout of cost-reimbursement contracts."],"dc:identifier.programcode":["835, Contract Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/71120"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.advisorentity":["02a7402e-0f07-4fd9-991c-e4b648078d60"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["low-risk memos","incurred cost proposal","incurred cost audit","cost reimbursement contract","final indirect cost rates","sampling low-risk incurred cost proposals","class deviation 2012-O0013","DCAA incurred cost proposal audits"],"dc:title":["THE HIGH RISK OF INCURRED COST LOW-RISK MEMOS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Defense Contract Management Agency"],"thesis:degree_discipline":["Contract Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Contract Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["38883"]},"updated_at":"2026-11-24T23:54:17Z"}