{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/71128"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/71128","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"PROCURING BULK PETROLEUM FOR THE FEDERAL GOVERNMENT: WHY VENDORS’ OFFERS ARE RATED TECHNICALLY UNACCEPTABLE","abstract":"Every fiscal year, DLA Energy procures global military jet fuel and marine diesel fuel requirements through four major purchase programs: Inland East Gulf Coast; Rocky Mountain West; Atlantic, Europe and Mediterranean; and Western Pacific. DLA Energy’s Bulk Petroleum Products Division oversees these procurements and delivers contracting support for all bulk petroleum requirements. Offerors develop proposals and submit proposals, and when proposals are evaluated, some are determined technically unacceptable based on the evaluation factors. When offerors’ proposals are deemed technically unacceptable, that reduces the level of competition for that procurement and competition is reduced, resulting in a greater challenge for DLA Energy to award contracts based on fair and reasonable prices. The more proposals that are deemed technically acceptable, the greater the competition in the procurement, which results in DLA Energy being better able to support its mission. The purpose of this research is to provide an analysis of the reasons why offerors’ proposals are deemed technically unacceptable during proposal evaluation of the contract source selection. Based on the analysis, this research provides recommendations for how DLA Energy could improve its procurement of bulk petroleum. This also helps inform the industry by making recommendations of how to improve their proposals so that they can be technically acceptable.","abstract_html":"Every fiscal year, DLA Energy procures global military jet fuel and marine diesel fuel requirements through four major purchase programs: Inland East Gulf Coast; Rocky Mountain West; Atlantic, Europe and Mediterranean; and Western Pacific. DLA Energy’s Bulk Petroleum Products Division oversees these procurements and delivers contracting support for all bulk petroleum requirements. Offerors develop proposals and submit proposals, and when proposals are evaluated, some are determined technically unacceptable based on the evaluation factors. When offerors’ proposals are deemed technically unacceptable, that reduces the level of competition for that procurement and competition is reduced, resulting in a greater challenge for DLA Energy to award contracts based on fair and reasonable prices. The more proposals that are deemed technically acceptable, the greater the competition in the procurement, which results in DLA Energy being better able to support its mission. The purpose of this research is to provide an analysis of the reasons why offerors’ proposals are deemed technically unacceptable during proposal evaluation of the contract source selection. Based on the analysis, this research provides recommendations for how DLA Energy could improve its procurement of bulk petroleum. This also helps inform the industry by making recommendations of how to improve their proposals so that they can be technically acceptable.","abstract_has_math":false,"creators":["Warburton, Ayodele G."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Contract Management","degree_level":"Masters","degree_discipline":"Contract Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Jones, Angela","Rendon, Rene"],"committee_chairs":[],"committee_members":[],"year":2022,"date_issued":"2022-09","date_published":"2022-09","updated_at":"2026-11-24T23:54:17Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["835, Contract Management (DL)"],"render_values":[{"text":"835, Contract Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36964"],"render_values":[{"text":"36964","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/71128","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/71128","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F71128","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F71128","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Jones, Angela","Rendon, Rene"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program"]},{"key":"dc:creator","label":"Author","values":["Warburton, Ayodele G."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-11-17T20:55:36Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-11-17T20:55:36Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["6855896f-0800-4ea9-9d08-79cbe76c9d8f"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects","NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4","c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Contract Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Contract Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["36964"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["lowest price technically acceptable","LPTA","evaluation factors","technically unacceptable","offers","proposals","DLA","DLA Energy"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["835, Contract Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/71128"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Every fiscal year, DLA Energy procures global military jet fuel and marine diesel fuel requirements through four major purchase programs: Inland East Gulf Coast; Rocky Mountain West; Atlantic, Europe and Mediterranean; and Western Pacific. DLA Energy’s Bulk Petroleum Products Division oversees these procurements and delivers contracting support for all bulk petroleum requirements. Offerors develop proposals and submit proposals, and when proposals are evaluated, some are determined technically unacceptable based on the evaluation factors. When offerors’ proposals are deemed technically unacceptable, that reduces the level of competition for that procurement and competition is reduced, resulting in a greater challenge for DLA Energy to award contracts based on fair and reasonable prices. The more proposals that are deemed technically acceptable, the greater the competition in the procurement, which results in DLA Energy being better able to support its mission. The purpose of this research is to provide an analysis of the reasons why offerors’ proposals are deemed technically unacceptable during proposal evaluation of the contract source selection. Based on the analysis, this research provides recommendations for how DLA Energy could improve its procurement of bulk petroleum. This also helps inform the industry by making recommendations of how to improve their proposals so that they can be technically acceptable."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:title","label":"Title","values":["PROCURING BULK PETROLEUM FOR THE FEDERAL GOVERNMENT: WHY VENDORS’ OFFERS ARE RATED TECHNICALLY UNACCEPTABLE"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Defense Logistics Agency Energy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Jones, Angela","Rendon, Rene"],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program"],"dc:creator":["Warburton, Ayodele G."],"dc:date.accessioned":["2022-11-17T20:55:36Z"],"dc:date.available":["2022-11-17T20:55:36Z"],"dc:date.issued":["2022-09"],"dc:description.abstract":["Every fiscal year, DLA Energy procures global military jet fuel and marine diesel fuel requirements through four major purchase programs: Inland East Gulf Coast; Rocky Mountain West; Atlantic, Europe and Mediterranean; and Western Pacific. DLA Energy’s Bulk Petroleum Products Division oversees these procurements and delivers contracting support for all bulk petroleum requirements. Offerors develop proposals and submit proposals, and when proposals are evaluated, some are determined technically unacceptable based on the evaluation factors. When offerors’ proposals are deemed technically unacceptable, that reduces the level of competition for that procurement and competition is reduced, resulting in a greater challenge for DLA Energy to award contracts based on fair and reasonable prices. The more proposals that are deemed technically acceptable, the greater the competition in the procurement, which results in DLA Energy being better able to support its mission. The purpose of this research is to provide an analysis of the reasons why offerors’ proposals are deemed technically unacceptable during proposal evaluation of the contract source selection. Based on the analysis, this research provides recommendations for how DLA Energy could improve its procurement of bulk petroleum. This also helps inform the industry by making recommendations of how to improve their proposals so that they can be technically acceptable."],"dc:description.award":["Outstanding Thesis"],"dc:identifier.programcode":["835, Contract Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/71128"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.advisorentity":["6855896f-0800-4ea9-9d08-79cbe76c9d8f"],"dc:relation.ispartofseries":["Joint Applied Projects","NPS Outstanding Theses and Dissertations"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4","c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["lowest price technically acceptable","LPTA","evaluation factors","technically unacceptable","offers","proposals","DLA","DLA Energy"],"dc:title":["PROCURING BULK PETROLEUM FOR THE FEDERAL GOVERNMENT: WHY VENDORS’ OFFERS ARE RATED TECHNICALLY UNACCEPTABLE"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Defense Logistics Agency Energy"],"thesis:degree_discipline":["Contract Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Contract Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["36964"]},"updated_at":"2026-11-24T23:54:17Z"}