{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/71589"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/71589","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"STATED INTENTIONS VS. ACTUAL BEHAVIOR: CHOICE-BASED CONJOINT (CBC) IN DOD SOURCE SELECTIONS","abstract":"Current source selection procedures have exposed the Department of Defense (DoD) to increased protest risk. This, in part, is due to contradictions in the U.S. government’s stated order of importance for acquisition evaluation criteria (pre-award) versus its actual choice behavior during source selection, as Butler found in 2014. The objectives of this MBA project included the following: 1) Determine the degree of disconnect between stated preferences during pre-award acquisition phase and actual choice behavior in source selections. 2) Develop an understanding of quality attributes for logistics-based services. 3) Provide a Choice-Based Conjoint (CBC) framework that could be utilized to enhance source selection criteria development. Methodology included interviews and spend analysis techniques to identify quality attributes of logistics-based acquisitions. Then, after the attributes were identified, they were employed to develop a CBC model that calculated the attribute utilities and relative importance for each attribute. Using these important scores, the disconnect between stated preferences and choice behavior was found. None of the subjects in this investigative study could accurately order attribute importance in stated form to match their actual choices in simulated source selections. This report offers a framework and methods to mitigate the weaknesses found in developing evaluation attribute importance from stated preferences and reduce the risks of protests.","abstract_html":"Current source selection procedures have exposed the Department of Defense (DoD) to increased protest risk. This, in part, is due to contradictions in the U.S. government’s stated order of importance for acquisition evaluation criteria (pre-award) versus its actual choice behavior during source selection, as Butler found in 2014. The objectives of this MBA project included the following: 1) Determine the degree of disconnect between stated preferences during pre-award acquisition phase and actual choice behavior in source selections. 2) Develop an understanding of quality attributes for logistics-based services. 3) Provide a Choice-Based Conjoint (CBC) framework that could be utilized to enhance source selection criteria development. Methodology included interviews and spend analysis techniques to identify quality attributes of logistics-based acquisitions. Then, after the attributes were identified, they were employed to develop a CBC model that calculated the attribute utilities and relative importance for each attribute. Using these important scores, the disconnect between stated preferences and choice behavior was found. None of the subjects in this investigative study could accurately order attribute importance in stated form to match their actual choices in simulated source selections. This report offers a framework and methods to mitigate the weaknesses found in developing evaluation attribute importance from stated preferences and reduce the risks of protests.","abstract_has_math":false,"creators":["Thompson, Brittany A."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Master of Business Administration","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Finkenstadt, Daniel J."],"committee_chairs":[],"committee_members":["Hudgens, Bryan J."],"year":2022,"date_issued":"2022-12","date_published":"2022-12","updated_at":"2026-11-19T06:41:48Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["815, Defense Contract Management"],"render_values":[{"text":"815, Defense Contract Management","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38664"],"render_values":[{"text":"38664","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/71589","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/71589","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F71589","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F71589","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Finkenstadt, Daniel J."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Hudgens, Bryan J."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:creator","label":"Author","values":["Thompson, Brittany A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2023-02-14T04:23:58Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2023-02-14T04:23:58Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports","NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050","c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Master of Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38664"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["logistics","acquisitions","conjoint analysis","simulations","choice behavior","source selection","Choice-Based Conjoint","CBC"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["815, Defense Contract Management"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/71589"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Current source selection procedures have exposed the Department of Defense (DoD) to increased protest risk. This, in part, is due to contradictions in the U.S. government’s stated order of importance for acquisition evaluation criteria (pre-award) versus its actual choice behavior during source selection, as Butler found in 2014. The objectives of this MBA project included the following: 1) Determine the degree of disconnect between stated preferences during pre-award acquisition phase and actual choice behavior in source selections. 2) Develop an understanding of quality attributes for logistics-based services. 3) Provide a Choice-Based Conjoint (CBC) framework that could be utilized to enhance source selection criteria development. Methodology included interviews and spend analysis techniques to identify quality attributes of logistics-based acquisitions. Then, after the attributes were identified, they were employed to develop a CBC model that calculated the attribute utilities and relative importance for each attribute. Using these important scores, the disconnect between stated preferences and choice behavior was found. None of the subjects in this investigative study could accurately order attribute importance in stated form to match their actual choices in simulated source selections. This report offers a framework and methods to mitigate the weaknesses found in developing evaluation attribute importance from stated preferences and reduce the risks of protests."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:title","label":"Title","values":["STATED INTENTIONS VS. ACTUAL BEHAVIOR: CHOICE-BASED CONJOINT (CBC) IN DOD SOURCE SELECTIONS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["First Lieutenant, United States Air Force"]}]}],"canonical_facts":{"dc:contributor.advisor":["Finkenstadt, Daniel J."],"dc:contributor.committeemember":["Hudgens, Bryan J."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:creator":["Thompson, Brittany A."],"dc:date.accessioned":["2023-02-14T04:23:58Z"],"dc:date.available":["2023-02-14T04:23:58Z"],"dc:date.issued":["2022-12"],"dc:description.abstract":["Current source selection procedures have exposed the Department of Defense (DoD) to increased protest risk. This, in part, is due to contradictions in the U.S. government’s stated order of importance for acquisition evaluation criteria (pre-award) versus its actual choice behavior during source selection, as Butler found in 2014. The objectives of this MBA project included the following: 1) Determine the degree of disconnect between stated preferences during pre-award acquisition phase and actual choice behavior in source selections. 2) Develop an understanding of quality attributes for logistics-based services. 3) Provide a Choice-Based Conjoint (CBC) framework that could be utilized to enhance source selection criteria development. Methodology included interviews and spend analysis techniques to identify quality attributes of logistics-based acquisitions. Then, after the attributes were identified, they were employed to develop a CBC model that calculated the attribute utilities and relative importance for each attribute. Using these important scores, the disconnect between stated preferences and choice behavior was found. None of the subjects in this investigative study could accurately order attribute importance in stated form to match their actual choices in simulated source selections. This report offers a framework and methods to mitigate the weaknesses found in developing evaluation attribute importance from stated preferences and reduce the risks of protests."],"dc:description.award":["Outstanding Thesis"],"dc:identifier.programcode":["815, Defense Contract Management"],"dc:identifier.uri":["https://hdl.handle.net/10945/71589"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports","NPS Outstanding Theses and Dissertations"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050","c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["logistics","acquisitions","conjoint analysis","simulations","choice behavior","source selection","Choice-Based Conjoint","CBC"],"dc:title":["STATED INTENTIONS VS. ACTUAL BEHAVIOR: CHOICE-BASED CONJOINT (CBC) IN DOD SOURCE SELECTIONS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["First Lieutenant, United States Air Force"],"thesis:degree_discipline":["Master of Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["38664"]},"updated_at":"2026-11-19T06:41:48Z"}