{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/71592"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/71592","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"ANALYZING THE COSTS TO RECONFIGURE THE U.S. NAVY PLATFORM TO SUPPORT THE SINGLE FUEL CONCEPT - JP5","abstract":"This research analyzes the reconfiguration costs of U.S. Navy amphibious assault vessels along with fuel depots at Defense Fuel Support Point (DFSP) to support the Single Fuel Concept (SFC). Previous research confirms that SFC would further improve military objectives and missions in a contested environment. The reconfiguration from F-76 to JP-5 would benefit logistic support, maintenance requirement, time on stations, and fuel posture. We gathered the most recent maintenance repair contracts and analyzed the data to determine the cost of reconfiguration. Using a Gantt chart, we show the series of actions that various stakeholders need to take prior to a ship entering the maintenance availability cycle as well as future actions to ensure maintenance is planned, executed, and completed. Since the energy content of JP-5 is lower than F-76, we analyze the total cost of using JP-5 in the deployment phase of operation. Furthermore, we conduct regression analysis on both fuel prices to estimate the delta percentage between both fuel products. This thesis recommends that stakeholders consider the overall long-term benefit of reconfiguration as the cost of conversion is reasonable, but transition to JP-5 requires time.","abstract_html":"This research analyzes the reconfiguration costs of U.S. Navy amphibious assault vessels along with fuel depots at Defense Fuel Support Point (DFSP) to support the Single Fuel Concept (SFC). Previous research confirms that SFC would further improve military objectives and missions in a contested environment. The reconfiguration from F-76 to JP-5 would benefit logistic support, maintenance requirement, time on stations, and fuel posture. We gathered the most recent maintenance repair contracts and analyzed the data to determine the cost of reconfiguration. Using a Gantt chart, we show the series of actions that various stakeholders need to take prior to a ship entering the maintenance availability cycle as well as future actions to ensure maintenance is planned, executed, and completed. Since the energy content of JP-5 is lower than F-76, we analyze the total cost of using JP-5 in the deployment phase of operation. Furthermore, we conduct regression analysis on both fuel prices to estimate the delta percentage between both fuel products. This thesis recommends that stakeholders consider the overall long-term benefit of reconfiguration as the cost of conversion is reasonable, but transition to JP-5 requires time.","abstract_has_math":false,"creators":["Zheng, Lin Lin","Ventura, Barry L."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Master of Business Administration","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Ferrer, Geraldo","Hudgens, Bryan J."],"committee_chairs":[],"committee_members":[],"year":2022,"date_issued":"2022-12","date_published":"2022-12","updated_at":"2026-11-19T06:41:48Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["815, Defense Contract Management"],"render_values":[{"text":"815, Defense Contract Management","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38888"],"render_values":[{"text":"38888","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/71592","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/71592","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F71592","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F71592","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ferrer, Geraldo","Hudgens, Bryan J."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:creator","label":"Author","values":["Zheng, Lin Lin","Ventura, Barry L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2023-02-14T04:24:00Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2023-02-14T04:24:00Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Master of Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38888"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Single Fuel Concept (SFC)","F-76","JP-5","reconfiguration","cost","constraints","conversion"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["815, Defense Contract Management"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/71592"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research analyzes the reconfiguration costs of U.S. Navy amphibious assault vessels along with fuel depots at Defense Fuel Support Point (DFSP) to support the Single Fuel Concept (SFC). Previous research confirms that SFC would further improve military objectives and missions in a contested environment. The reconfiguration from F-76 to JP-5 would benefit logistic support, maintenance requirement, time on stations, and fuel posture. We gathered the most recent maintenance repair contracts and analyzed the data to determine the cost of reconfiguration. Using a Gantt chart, we show the series of actions that various stakeholders need to take prior to a ship entering the maintenance availability cycle as well as future actions to ensure maintenance is planned, executed, and completed. Since the energy content of JP-5 is lower than F-76, we analyze the total cost of using JP-5 in the deployment phase of operation. Furthermore, we conduct regression analysis on both fuel prices to estimate the delta percentage between both fuel products. This thesis recommends that stakeholders consider the overall long-term benefit of reconfiguration as the cost of conversion is reasonable, but transition to JP-5 requires time."]},{"key":"dc:title","label":"Title","values":["ANALYZING THE COSTS TO RECONFIGURE THE U.S. NAVY PLATFORM TO SUPPORT THE SINGLE FUEL CONCEPT - JP5"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Ferrer, Geraldo","Hudgens, Bryan J."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:creator":["Zheng, Lin Lin","Ventura, Barry L."],"dc:date.accessioned":["2023-02-14T04:24:00Z"],"dc:date.available":["2023-02-14T04:24:00Z"],"dc:date.issued":["2022-12"],"dc:description.abstract":["This research analyzes the reconfiguration costs of U.S. Navy amphibious assault vessels along with fuel depots at Defense Fuel Support Point (DFSP) to support the Single Fuel Concept (SFC). Previous research confirms that SFC would further improve military objectives and missions in a contested environment. The reconfiguration from F-76 to JP-5 would benefit logistic support, maintenance requirement, time on stations, and fuel posture. We gathered the most recent maintenance repair contracts and analyzed the data to determine the cost of reconfiguration. Using a Gantt chart, we show the series of actions that various stakeholders need to take prior to a ship entering the maintenance availability cycle as well as future actions to ensure maintenance is planned, executed, and completed. Since the energy content of JP-5 is lower than F-76, we analyze the total cost of using JP-5 in the deployment phase of operation. Furthermore, we conduct regression analysis on both fuel prices to estimate the delta percentage between both fuel products. This thesis recommends that stakeholders consider the overall long-term benefit of reconfiguration as the cost of conversion is reasonable, but transition to JP-5 requires time."],"dc:identifier.programcode":["815, Defense Contract Management"],"dc:identifier.uri":["https://hdl.handle.net/10945/71592"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["Single Fuel Concept (SFC)","F-76","JP-5","reconfiguration","cost","constraints","conversion"],"dc:title":["ANALYZING THE COSTS TO RECONFIGURE THE U.S. NAVY PLATFORM TO SUPPORT THE SINGLE FUEL CONCEPT - JP5"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Master of Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["38888"]},"updated_at":"2026-11-19T06:41:48Z"}