{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/72232"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/72232","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"OPERATIONAL TEST IN AGILE DEVELOPMENT: VETTED CAPABILITY AT THE SPEED OF RELEVANCE","abstract":"The traditional Operational Test and Evaluation (OT&E) process and timeline are no longer sufficient to keep pace within an agile software development environment. Agile development requires OT&E to be just as agile while still ensuring the adequacy and sufficiency required to keep the Fleet’s trust in new capabilities.In order to accomplish this, we recommend five initiatives that will help the current OT&E process. Those initiatives are: The “Pulverizer,” an agile Test and Evaluation Master Plan (TEMP), universal test plan working group, an integrated operational test assessment, and a dedicated annual OT&E period. These initiatives make the bureaucratic requirements for OT&E much more streamlined and agile. They ensure an annual schedule all stakeholders can work towards and drive down many of the important OT&E decisions to the test squadron level. These recommendations have already been shown to work with positive feedback from stakeholders for the F/A-18 program. If these changes are implemented across all of naval aviation, OT&E can be become as agile as the software development.","abstract_html":"The traditional Operational Test and Evaluation (OT&amp;E) process and timeline are no longer sufficient to keep pace within an agile software development environment. Agile development requires OT&amp;E to be just as agile while still ensuring the adequacy and sufficiency required to keep the Fleet’s trust in new capabilities.In order to accomplish this, we recommend five initiatives that will help the current OT&amp;E process. Those initiatives are: The “Pulverizer,” an agile Test and Evaluation Master Plan (TEMP), universal test plan working group, an integrated operational test assessment, and a dedicated annual OT&amp;E period. These initiatives make the bureaucratic requirements for OT&amp;E much more streamlined and agile. They ensure an annual schedule all stakeholders can work towards and drive down many of the important OT&amp;E decisions to the test squadron level. These recommendations have already been shown to work with positive feedback from stakeholders for the F/A-18 program. If these changes are implemented across all of naval aviation, OT&amp;E can be become as agile as the software development.","abstract_has_math":false,"creators":["Morrill, Brian D.","Polnaszek, Joseph D."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Mortlock, Robert F.","Connolly , Andrew, VX-1"],"committee_chairs":[],"committee_members":["Dunlap, Jeffrey R."],"year":2023,"date_issued":"2023-06","date_published":"2023-06","updated_at":"2026-11-26T00:18:53Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"],"render_values":[{"text":"836, Program Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["39093"],"render_values":[{"text":"39093","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/72232","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/72232","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F72232","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F72232","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Mortlock, Robert F.","Connolly , Andrew, VX-1"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Dunlap, Jeffrey R."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program"]},{"key":"dc:creator","label":"Author","values":["Morrill, Brian D.","Polnaszek, Joseph D."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2023-08-17T23:09:15Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2023-08-17T23:09:15Z"]},{"key":"dc:date.issued","label":"Date","values":["2023-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["NPS Outstanding Theses and Dissertations","Capstone Applied Project Reports","Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["c5e66392-520c-4aaf-9b4f-370ce82b601f","409d700c-a0df-4ded-8bb7-9da7660ceddb"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["39093"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Operational Test and Evaluation","OT&E","agile","Test and Evaluation Master Plan","TEMP"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/72232"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The traditional Operational Test and Evaluation (OT&E) process and timeline are no longer sufficient to keep pace within an agile software development environment. Agile development requires OT&E to be just as agile while still ensuring the adequacy and sufficiency required to keep the Fleet’s trust in new capabilities.In order to accomplish this, we recommend five initiatives that will help the current OT&E process. Those initiatives are: The “Pulverizer,” an agile Test and Evaluation Master Plan (TEMP), universal test plan working group, an integrated operational test assessment, and a dedicated annual OT&E period. These initiatives make the bureaucratic requirements for OT&E much more streamlined and agile. They ensure an annual schedule all stakeholders can work towards and drive down many of the important OT&E decisions to the test squadron level. These recommendations have already been shown to work with positive feedback from stakeholders for the F/A-18 program. If these changes are implemented across all of naval aviation, OT&E can be become as agile as the software development."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:title","label":"Title","values":["OPERATIONAL TEST IN AGILE DEVELOPMENT: VETTED CAPABILITY AT THE SPEED OF RELEVANCE"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy","Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Mortlock, Robert F.","Connolly , Andrew, VX-1"],"dc:contributor.committeemember":["Dunlap, Jeffrey R."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program"],"dc:creator":["Morrill, Brian D.","Polnaszek, Joseph D."],"dc:date.accessioned":["2023-08-17T23:09:15Z"],"dc:date.available":["2023-08-17T23:09:15Z"],"dc:date.issued":["2023-06"],"dc:description.abstract":["The traditional Operational Test and Evaluation (OT&E) process and timeline are no longer sufficient to keep pace within an agile software development environment. Agile development requires OT&E to be just as agile while still ensuring the adequacy and sufficiency required to keep the Fleet’s trust in new capabilities.In order to accomplish this, we recommend five initiatives that will help the current OT&E process. Those initiatives are: The “Pulverizer,” an agile Test and Evaluation Master Plan (TEMP), universal test plan working group, an integrated operational test assessment, and a dedicated annual OT&E period. These initiatives make the bureaucratic requirements for OT&E much more streamlined and agile. They ensure an annual schedule all stakeholders can work towards and drive down many of the important OT&E decisions to the test squadron level. These recommendations have already been shown to work with positive feedback from stakeholders for the F/A-18 program. If these changes are implemented across all of naval aviation, OT&E can be become as agile as the software development."],"dc:description.award":["Outstanding Thesis"],"dc:identifier.programcode":["836, Program Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/72232"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["NPS Outstanding Theses and Dissertations","Capstone Applied Project Reports","Joint Applied Projects"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a","b1db68f8-fa8c-4d10-b118-8166cdacdb4c"],"dc:relation.seriesentity":["c5e66392-520c-4aaf-9b4f-370ce82b601f","409d700c-a0df-4ded-8bb7-9da7660ceddb"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["Operational Test and Evaluation","OT&E","agile","Test and Evaluation Master Plan","TEMP"],"dc:title":["OPERATIONAL TEST IN AGILE DEVELOPMENT: VETTED CAPABILITY AT THE SPEED OF RELEVANCE"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy","Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["39093"]},"updated_at":"2026-11-26T00:18:53Z"}