{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/72363"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/72363","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A PROBABILISTIC APPROACH TO JOB-SHOP MANUFACTURING ESTIMATION AND PERFORMANCE FORECASTING","abstract":"In defense job-shop manufacturing, cost and schedule estimates along with performance to those estimates have a heavy impact on overall project budget and schedule for pre-milestone B activities. Variations at this stage of the project tend to directly influence the availability of the system under development, which results in propagating delays through the rest of the Technology Maturation & Risk Reduction phase. Project stakeholders have a need to understand impacts from uncertainty along with anticipated variances to cost and schedule continuously throughout the manufacturing process. Extending earned value management techniques with probabilistic modeling may be able to provide meaningful insight into manufacturing estimates and performance without requiring project stakeholders to have detailed familiarity with the manufacturing process. This thesis explores if probabilistic estimation methods are sufficient to predict actual performance and compare existing methods of project estimation and performance reporting with combined probabilistic forecasting. This work demonstrates that additional insight can be attained with probabilistic forecasting that is useful to program managers during job-shop manufacturing project execution and can serve as an additional leading indicator of cost and schedule variance.","abstract_html":"In defense job-shop manufacturing, cost and schedule estimates along with performance to those estimates have a heavy impact on overall project budget and schedule for pre-milestone B activities. Variations at this stage of the project tend to directly influence the availability of the system under development, which results in propagating delays through the rest of the Technology Maturation &amp; Risk Reduction phase. Project stakeholders have a need to understand impacts from uncertainty along with anticipated variances to cost and schedule continuously throughout the manufacturing process. Extending earned value management techniques with probabilistic modeling may be able to provide meaningful insight into manufacturing estimates and performance without requiring project stakeholders to have detailed familiarity with the manufacturing process. This thesis explores if probabilistic estimation methods are sufficient to predict actual performance and compare existing methods of project estimation and performance reporting with combined probabilistic forecasting. This work demonstrates that additional insight can be attained with probabilistic forecasting that is useful to program managers during job-shop manufacturing project execution and can serve as an additional leading indicator of cost and schedule variance.","abstract_has_math":false,"creators":["Kline, Eric V."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Anderson, Timothy P."],"committee_chairs":[],"committee_members":["Van Bossuyt, Douglas L."],"year":2023,"date_issued":"2023-09","date_published":"2023-09","updated_at":"2026-11-19T06:42:07Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["721, Systems Engineering Management-PD21 (DL)"],"render_values":[{"text":"721, Systems Engineering Management-PD21 (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38915"],"render_values":[{"text":"38915","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/72363","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/72363","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F72363","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F72363","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Anderson, Timothy P."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Van Bossuyt, Douglas L."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Kline, Eric V."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2023-10-31T17:15:10Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2023-10-31T17:15:10Z"]},{"key":"dc:date.issued","label":"Date","values":["2023-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38915"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["probabilistic cost","probabilistic schedule","probabilistic estimation","probabilistic performance","earned value management","critical path","manufacturing estimation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["721, Systems Engineering Management-PD21 (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/72363"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In defense job-shop manufacturing, cost and schedule estimates along with performance to those estimates have a heavy impact on overall project budget and schedule for pre-milestone B activities. Variations at this stage of the project tend to directly influence the availability of the system under development, which results in propagating delays through the rest of the Technology Maturation & Risk Reduction phase. Project stakeholders have a need to understand impacts from uncertainty along with anticipated variances to cost and schedule continuously throughout the manufacturing process. Extending earned value management techniques with probabilistic modeling may be able to provide meaningful insight into manufacturing estimates and performance without requiring project stakeholders to have detailed familiarity with the manufacturing process. This thesis explores if probabilistic estimation methods are sufficient to predict actual performance and compare existing methods of project estimation and performance reporting with combined probabilistic forecasting. This work demonstrates that additional insight can be attained with probabilistic forecasting that is useful to program managers during job-shop manufacturing project execution and can serve as an additional leading indicator of cost and schedule variance."]},{"key":"dc:title","label":"Title","values":["A PROBABILISTIC APPROACH TO JOB-SHOP MANUFACTURING ESTIMATION AND PERFORMANCE FORECASTING"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Anderson, Timothy P."],"dc:contributor.committeemember":["Van Bossuyt, Douglas L."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Kline, Eric V."],"dc:date.accessioned":["2023-10-31T17:15:10Z"],"dc:date.available":["2023-10-31T17:15:10Z"],"dc:date.issued":["2023-09"],"dc:description.abstract":["In defense job-shop manufacturing, cost and schedule estimates along with performance to those estimates have a heavy impact on overall project budget and schedule for pre-milestone B activities. Variations at this stage of the project tend to directly influence the availability of the system under development, which results in propagating delays through the rest of the Technology Maturation & Risk Reduction phase. Project stakeholders have a need to understand impacts from uncertainty along with anticipated variances to cost and schedule continuously throughout the manufacturing process. Extending earned value management techniques with probabilistic modeling may be able to provide meaningful insight into manufacturing estimates and performance without requiring project stakeholders to have detailed familiarity with the manufacturing process. This thesis explores if probabilistic estimation methods are sufficient to predict actual performance and compare existing methods of project estimation and performance reporting with combined probabilistic forecasting. This work demonstrates that additional insight can be attained with probabilistic forecasting that is useful to program managers during job-shop manufacturing project execution and can serve as an additional leading indicator of cost and schedule variance."],"dc:identifier.programcode":["721, Systems Engineering Management-PD21 (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/72363"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["probabilistic cost","probabilistic schedule","probabilistic estimation","probabilistic performance","earned value management","critical path","manufacturing estimation"],"dc:title":["A PROBABILISTIC APPROACH TO JOB-SHOP MANUFACTURING ESTIMATION AND PERFORMANCE FORECASTING"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["38915"]},"updated_at":"2026-11-19T06:42:07Z"}