{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/72527"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/72527","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"ASSESSMENT OF THE NAVY SOLID ROCKET MOTOR PRODUCTION PROCESS","abstract":"The United States Navy continues to challenge the presence of the People's Republic of China in the Indo-Pacific region. To strengthen the deterrence posture, the 2022 National Defense Strategy emphasizes the expansion of missile capabilities through the acquisition of missile systems. The propulsion system is the heart of the missile, thus increasing the solid rocket motor (SRM) production rate will directly correlate to the increase of the missile inventory. SRM production process encompasses two major processes: fabrication and qualification. As such, this thesis conducts a thorough analysis of the PEO IWS 3.0 fabrication process and qualification process. When analyzing the fabrication process, amongst all fabrication activities, order procurement has the most significant impact in total fabrication duration. When analyzing the qualification process, SpaceX compressed, which includes early requirement analysis, rapid prototyping, and testing in parallel, is the most time efficient process amongst all others. Future work in this topic should include the integration of fabrication and qualification into the overall production process.","abstract_html":"The United States Navy continues to challenge the presence of the People&#x27;s Republic of China in the Indo-Pacific region. To strengthen the deterrence posture, the 2022 National Defense Strategy emphasizes the expansion of missile capabilities through the acquisition of missile systems. The propulsion system is the heart of the missile, thus increasing the solid rocket motor (SRM) production rate will directly correlate to the increase of the missile inventory. SRM production process encompasses two major processes: fabrication and qualification. As such, this thesis conducts a thorough analysis of the PEO IWS 3.0 fabrication process and qualification process. When analyzing the fabrication process, amongst all fabrication activities, order procurement has the most significant impact in total fabrication duration. When analyzing the qualification process, SpaceX compressed, which includes early requirement analysis, rapid prototyping, and testing in parallel, is the most time efficient process amongst all others. Future work in this topic should include the integration of fabrication and qualification into the overall production process.","abstract_has_math":false,"creators":["Gueye, Marieme"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering","degree_level":"Masters","degree_discipline":"Systems Engineering","degree_department":"Systems Engineering (SE)","school":null,"contributors":[],"advisors":["Yakimenko, Oleg A.","Dew, Nicholas","Beery, Paul T."],"committee_chairs":[],"committee_members":[],"year":2023,"date_issued":"2023-12","date_published":"2023-12","updated_at":"2026-11-19T06:42:07Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["580, Systems Engineering"],"render_values":[{"text":"580, Systems Engineering","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38979"],"render_values":[{"text":"38979","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/72527","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/72527","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F72527","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F72527","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Yakimenko, Oleg A.","Dew, Nicholas","Beery, Paul T."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering (SE)"]},{"key":"dc:creator","label":"Author","values":["Gueye, Marieme"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2024-02-19T22:56:47Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2024-02-19T22:56:47Z"]},{"key":"dc:date.issued","label":"Date","values":["2023-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["38979"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["PEO IWS","solid rocket motor","fabrication process","production process","SpaceX","ExtendSim","SRM"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["580, Systems Engineering"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/72527"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The United States Navy continues to challenge the presence of the People's Republic of China in the Indo-Pacific region. To strengthen the deterrence posture, the 2022 National Defense Strategy emphasizes the expansion of missile capabilities through the acquisition of missile systems. The propulsion system is the heart of the missile, thus increasing the solid rocket motor (SRM) production rate will directly correlate to the increase of the missile inventory. SRM production process encompasses two major processes: fabrication and qualification. As such, this thesis conducts a thorough analysis of the PEO IWS 3.0 fabrication process and qualification process. When analyzing the fabrication process, amongst all fabrication activities, order procurement has the most significant impact in total fabrication duration. When analyzing the qualification process, SpaceX compressed, which includes early requirement analysis, rapid prototyping, and testing in parallel, is the most time efficient process amongst all others. Future work in this topic should include the integration of fabrication and qualification into the overall production process."]},{"key":"dc:title","label":"Title","values":["ASSESSMENT OF THE NAVY SOLID ROCKET MOTOR PRODUCTION PROCESS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Yakimenko, Oleg A.","Dew, Nicholas","Beery, Paul T."],"dc:contributor.department":["Systems Engineering (SE)"],"dc:creator":["Gueye, Marieme"],"dc:date.accessioned":["2024-02-19T22:56:47Z"],"dc:date.available":["2024-02-19T22:56:47Z"],"dc:date.issued":["2023-12"],"dc:description.abstract":["The United States Navy continues to challenge the presence of the People's Republic of China in the Indo-Pacific region. To strengthen the deterrence posture, the 2022 National Defense Strategy emphasizes the expansion of missile capabilities through the acquisition of missile systems. The propulsion system is the heart of the missile, thus increasing the solid rocket motor (SRM) production rate will directly correlate to the increase of the missile inventory. SRM production process encompasses two major processes: fabrication and qualification. As such, this thesis conducts a thorough analysis of the PEO IWS 3.0 fabrication process and qualification process. When analyzing the fabrication process, amongst all fabrication activities, order procurement has the most significant impact in total fabrication duration. When analyzing the qualification process, SpaceX compressed, which includes early requirement analysis, rapid prototyping, and testing in parallel, is the most time efficient process amongst all others. Future work in this topic should include the integration of fabrication and qualification into the overall production process."],"dc:identifier.programcode":["580, Systems Engineering"],"dc:identifier.uri":["https://hdl.handle.net/10945/72527"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release. Distribution is unlimited."],"dc:subject.keyword":["PEO IWS","solid rocket motor","fabrication process","production process","SpaceX","ExtendSim","SRM"],"dc:title":["ASSESSMENT OF THE NAVY SOLID ROCKET MOTOR PRODUCTION PROCESS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Systems Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["38979"]},"updated_at":"2026-11-19T06:42:07Z"}