{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/73191"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/73191","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"THE BENEFITS AND DRAWBACKS OF STANDARDIZATION OF COST ESTIMATION IN NAVAL SURFACE WARFARE CENTERS","abstract":"Work supported by Naval Surface Warfare Centers (NSWCs) enlists the assistance of many engineering codes to generate cost estimates for large projects’ budgets. One important issue needing attention is to better understand how to manage estimated costs and planned budgets against the reality of typically higher actual costs. In this project, I examine the benefits and drawbacks of using a standard method for cost estimations at a NSWC for engineering codes for their cost estimations as a way to improve the accuracy of estimations and minimize the margin between estimated and actual project costs. This study draws from prior studies on methods of cost estimation and from reviewing NSWC cost estimate approaches in support of Full Ship Shock Trials (FSST). My examination found that other factors, difficult to anticipate, impact the accuracy of large project budgets to a greater degree than the methods used by engineering codes for cost estimation. The recommendation is to focus on better understanding and defining these other factors to improve the mitigation of large project challenges.","abstract_html":"Work supported by Naval Surface Warfare Centers (NSWCs) enlists the assistance of many engineering codes to generate cost estimates for large projects’ budgets. One important issue needing attention is to better understand how to manage estimated costs and planned budgets against the reality of typically higher actual costs. In this project, I examine the benefits and drawbacks of using a standard method for cost estimations at a NSWC for engineering codes for their cost estimations as a way to improve the accuracy of estimations and minimize the margin between estimated and actual project costs. This study draws from prior studies on methods of cost estimation and from reviewing NSWC cost estimate approaches in support of Full Ship Shock Trials (FSST). My examination found that other factors, difficult to anticipate, impact the accuracy of large project budgets to a greater degree than the methods used by engineering codes for cost estimation. The recommendation is to focus on better understanding and defining these other factors to improve the mitigation of large project challenges.","abstract_has_math":false,"creators":["Moran, Daniel"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":"Masters","degree_discipline":"Program Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Tick, Simona L.","Mortlock, Robert F."],"committee_chairs":[],"committee_members":[],"year":2024,"date_issued":"2024-06","date_published":"2024-06","updated_at":"2026-11-19T06:42:35Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"],"render_values":[{"text":"836, Program Management (DL)","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["40245"],"render_values":[{"text":"40245","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/73191","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/73191","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F73191","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Tick, Simona L.","Mortlock, Robert F."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:creator","label":"Author","values":["Moran, Daniel"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2024-08-19T16:35:49Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2024-08-19T16:35:49Z"]},{"key":"dc:date.issued","label":"Date","values":["2024-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Capstone Applied Project Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["409d700c-a0df-4ded-8bb7-9da7660ceddb"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["40245"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["cost estimation","funding requirements","full ship shock trial","FSST"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["836, Program Management (DL)"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/73191"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Work supported by Naval Surface Warfare Centers (NSWCs) enlists the assistance of many engineering codes to generate cost estimates for large projects’ budgets. One important issue needing attention is to better understand how to manage estimated costs and planned budgets against the reality of typically higher actual costs. In this project, I examine the benefits and drawbacks of using a standard method for cost estimations at a NSWC for engineering codes for their cost estimations as a way to improve the accuracy of estimations and minimize the margin between estimated and actual project costs. This study draws from prior studies on methods of cost estimation and from reviewing NSWC cost estimate approaches in support of Full Ship Shock Trials (FSST). My examination found that other factors, difficult to anticipate, impact the accuracy of large project budgets to a greater degree than the methods used by engineering codes for cost estimation. The recommendation is to focus on better understanding and defining these other factors to improve the mitigation of large project challenges."]},{"key":"dc:title","label":"Title","values":["THE BENEFITS AND DRAWBACKS OF STANDARDIZATION OF COST ESTIMATION IN NAVAL SURFACE WARFARE CENTERS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Department of the Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Tick, Simona L.","Mortlock, Robert F."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:creator":["Moran, Daniel"],"dc:date.accessioned":["2024-08-19T16:35:49Z"],"dc:date.available":["2024-08-19T16:35:49Z"],"dc:date.issued":["2024-06"],"dc:description.abstract":["Work supported by Naval Surface Warfare Centers (NSWCs) enlists the assistance of many engineering codes to generate cost estimates for large projects’ budgets. One important issue needing attention is to better understand how to manage estimated costs and planned budgets against the reality of typically higher actual costs. In this project, I examine the benefits and drawbacks of using a standard method for cost estimations at a NSWC for engineering codes for their cost estimations as a way to improve the accuracy of estimations and minimize the margin between estimated and actual project costs. This study draws from prior studies on methods of cost estimation and from reviewing NSWC cost estimate approaches in support of Full Ship Shock Trials (FSST). My examination found that other factors, difficult to anticipate, impact the accuracy of large project budgets to a greater degree than the methods used by engineering codes for cost estimation. The recommendation is to focus on better understanding and defining these other factors to improve the mitigation of large project challenges."],"dc:identifier.programcode":["836, Program Management (DL)"],"dc:identifier.uri":["https://hdl.handle.net/10945/73191"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Capstone Applied Project Reports"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["409d700c-a0df-4ded-8bb7-9da7660ceddb"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["cost estimation","funding requirements","full ship shock trial","FSST"],"dc:title":["THE BENEFITS AND DRAWBACKS OF STANDARDIZATION OF COST ESTIMATION IN NAVAL SURFACE WARFARE CENTERS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Department of the Navy"],"thesis:degree_discipline":["Program Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["40245"]},"updated_at":"2026-11-19T06:42:35Z"}