{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7358"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7358","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Life Cycle Cost Estimate of LSD(X)","abstract":"This thesis develops a model that provides a credible and reliable rough order magnitude (ROM) Life Cycle Cost Estimate (LCCE) for a newly constructed U. S. Navy Dock Landing Ship, LSD(X), over the various phases of design, procurement, and operations and support costs. The Systems Engineering Analysis (SEA) Curriculum at the Naval Postgraduate School (NPS) will use this estimate to help establish the costs of the proposed alternatives for LSD(X). This study also includes a cost benefit analysis through the comparison of LSD(X) to an alternative variant LSD(XB). The comparison examines how the baseline ROM LCCE of LSD(X) is affected by changes in technical parameters such as beam, number of LCACs, troop size, crew size and cargo capacity. Ultimately, this thesis provides a useful tool to aid decision makers in selecting the most cost effective alternative for the LSD(X) fleet for the expected 30 year operational period.","abstract_html":"This thesis develops a model that provides a credible and reliable rough order magnitude (ROM) Life Cycle Cost Estimate (LCCE) for a newly constructed U. S. Navy Dock Landing Ship, LSD(X), over the various phases of design, procurement, and operations and support costs. The Systems Engineering Analysis (SEA) Curriculum at the Naval Postgraduate School (NPS) will use this estimate to help establish the costs of the proposed alternatives for LSD(X). This study also includes a cost benefit analysis through the comparison of LSD(X) to an alternative variant LSD(XB). The comparison examines how the baseline ROM LCCE of LSD(X) is affected by changes in technical parameters such as beam, number of LCACs, troop size, crew size and cargo capacity. Ultimately, this thesis provides a useful tool to aid decision makers in selecting the most cost effective alternative for the LSD(X) fleet for the expected 30 year operational period.","abstract_has_math":false,"creators":["Hills, Allison"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science In Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Nussbaum, Daniel A."],"committee_chairs":[],"committee_members":["Mislick, Gregory"],"year":2012,"date_issued":"2012-06","date_published":"2012-06","updated_at":"2026-11-19T06:42:35Z","subjects":[],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7358","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7358","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F7358","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7358","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Nussbaum, Daniel A."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Mislick, Gregory"]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:creator","label":"Author","values":["Hills, Allison"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-07-30T23:15:56Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-07-30T23:15:56Z"]},{"key":"dc:date.issued","label":"Date","values":["2012-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["58745961-c46a-45ad-ae9c-d139d1ba1041"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science In Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["LSD(X)","life cycle cost estimate","ship construction costs","ship procurement"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7358"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis develops a model that provides a credible and reliable rough order magnitude (ROM) Life Cycle Cost Estimate (LCCE) for a newly constructed U. S. Navy Dock Landing Ship, LSD(X), over the various phases of design, procurement, and operations and support costs. The Systems Engineering Analysis (SEA) Curriculum at the Naval Postgraduate School (NPS) will use this estimate to help establish the costs of the proposed alternatives for LSD(X). This study also includes a cost benefit analysis through the comparison of LSD(X) to an alternative variant LSD(XB). The comparison examines how the baseline ROM LCCE of LSD(X) is affected by changes in technical parameters such as beam, number of LCACs, troop size, crew size and cargo capacity. Ultimately, this thesis provides a useful tool to aid decision makers in selecting the most cost effective alternative for the LSD(X) fleet for the expected 30 year operational period."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/lifecyclecostest109457358"]},{"key":"dc:title","label":"Title","values":["Life Cycle Cost Estimate of LSD(X)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Nussbaum, Daniel A."],"dc:contributor.committeemember":["Mislick, Gregory"],"dc:contributor.department":["Operations Research (OR)"],"dc:creator":["Hills, Allison"],"dc:date.accessioned":["2012-07-30T23:15:56Z"],"dc:date.available":["2012-07-30T23:15:56Z"],"dc:date.issued":["2012-06"],"dc:description.abstract":["This thesis develops a model that provides a credible and reliable rough order magnitude (ROM) Life Cycle Cost Estimate (LCCE) for a newly constructed U. S. Navy Dock Landing Ship, LSD(X), over the various phases of design, procurement, and operations and support costs. The Systems Engineering Analysis (SEA) Curriculum at the Naval Postgraduate School (NPS) will use this estimate to help establish the costs of the proposed alternatives for LSD(X). This study also includes a cost benefit analysis through the comparison of LSD(X) to an alternative variant LSD(XB). The comparison examines how the baseline ROM LCCE of LSD(X) is affected by changes in technical parameters such as beam, number of LCACs, troop size, crew size and cargo capacity. Ultimately, this thesis provides a useful tool to aid decision makers in selecting the most cost effective alternative for the LSD(X) fleet for the expected 30 year operational period."],"dc:description.uri":["http://archive.org/details/lifecyclecostest109457358"],"dc:identifier.uri":["https://hdl.handle.net/10945/7358"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["58745961-c46a-45ad-ae9c-d139d1ba1041"],"dc:subject.keyword":["LSD(X)","life cycle cost estimate","ship construction costs","ship procurement"],"dc:title":["Life Cycle Cost Estimate of LSD(X)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science In Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:42:35Z"}