{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/73699"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/73699","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"INNOVATING MARINE CORPS PRODUCTION PLANNING: THE MARINE CORPS ADVANCED PRODUCTION PLAN MODEL","abstract":"Each year, the Marine Corps assesses approximately 36,000 new recruits. The Production Plan allocates these entrants across 139 Military Occupational specialties, ensuring operational fleet units are manned with qualified personnel. Accurate forecasts are critical to meeting force requirements while staying within fiscal year end-strength constraints.This thesis develops and validates the Marine Corps Advanced Production Plan Model to improve Production Plan forecast, comparing its accuracy to the current methods used by manpower planners at Headquarters, United States Marine Corps. The model incorporates a constrained optimization algorithm that accounts for first-term MOS health and annual attrition when generating forecasts. Results show a 44% reduction in forecasting error for the fiscal year 2018 Production Plan compared to the executed Production Plan, cutting deviation nearly in half. This improvement leads to a more accurate forecast for 119 out of 139 Primary Occupational Specialties. This thesis recommends further testing across additional fiscal years, along with simulations, to evaluate long-term performance against the existing production planning process.","abstract_html":"Each year, the Marine Corps assesses approximately 36,000 new recruits. The Production Plan allocates these entrants across 139 Military Occupational specialties, ensuring operational fleet units are manned with qualified personnel. Accurate forecasts are critical to meeting force requirements while staying within fiscal year end-strength constraints.This thesis develops and validates the Marine Corps Advanced Production Plan Model to improve Production Plan forecast, comparing its accuracy to the current methods used by manpower planners at Headquarters, United States Marine Corps. The model incorporates a constrained optimization algorithm that accounts for first-term MOS health and annual attrition when generating forecasts. Results show a 44% reduction in forecasting error for the fiscal year 2018 Production Plan compared to the executed Production Plan, cutting deviation nearly in half. This improvement leads to a more accurate forecast for 119 out of 139 Primary Occupational Specialties. This thesis recommends further testing across additional fiscal years, along with simulations, to evaluate long-term performance against the existing production planning process.","abstract_has_math":false,"creators":["Riddle, Brian H."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Koyak, Robert A.","Seagren, Chad W."],"committee_chairs":[],"committee_members":[],"year":2025,"date_issued":"2025-03","date_published":"2025-03","updated_at":"2026-11-19T06:43:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["NPS-24-M208-A"],"render_values":[{"text":"NPS-24-M208-A","href":null,"code":true}]},{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["847, Manpower Systems Analysis"],"render_values":[{"text":"847, Manpower Systems Analysis","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["40912"],"render_values":[{"text":"40912","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/73699","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/73699","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F73699","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Koyak, Robert A.","Seagren, Chad W."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:creator","label":"Author","values":["Riddle, Brian H."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-01T14:29:04Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-01T14:29:04Z"]},{"key":"dc:date.issued","label":"Date","values":["2025-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Manpower Systems Analysis Theses"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["aae25a6a-b787-446d-863b-de3ba49125f2"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["40912"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["manpower planning","Markov model","production plan","USMC HRDP","end-strength projections","training pipeline","attrition"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["NPS-24-M208-A"]},{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["847, Manpower Systems Analysis"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/73699"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Each year, the Marine Corps assesses approximately 36,000 new recruits. The Production Plan allocates these entrants across 139 Military Occupational specialties, ensuring operational fleet units are manned with qualified personnel. Accurate forecasts are critical to meeting force requirements while staying within fiscal year end-strength constraints.This thesis develops and validates the Marine Corps Advanced Production Plan Model to improve Production Plan forecast, comparing its accuracy to the current methods used by manpower planners at Headquarters, United States Marine Corps. The model incorporates a constrained optimization algorithm that accounts for first-term MOS health and annual attrition when generating forecasts. Results show a 44% reduction in forecasting error for the fiscal year 2018 Production Plan compared to the executed Production Plan, cutting deviation nearly in half. This improvement leads to a more accurate forecast for 119 out of 139 Primary Occupational Specialties. This thesis recommends further testing across additional fiscal years, along with simulations, to evaluate long-term performance against the existing production planning process."]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NPS Naval Research Program","This project was funded in part by the NPS Naval Research Program."]},{"key":"dc:title","label":"Title","values":["INNOVATING MARINE CORPS PRODUCTION PLANNING: THE MARINE CORPS ADVANCED PRODUCTION PLAN MODEL"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Koyak, Robert A.","Seagren, Chad W."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:creator":["Riddle, Brian H."],"dc:date.accessioned":["2025-05-01T14:29:04Z"],"dc:date.available":["2025-05-01T14:29:04Z"],"dc:date.issued":["2025-03"],"dc:description.abstract":["Each year, the Marine Corps assesses approximately 36,000 new recruits. The Production Plan allocates these entrants across 139 Military Occupational specialties, ensuring operational fleet units are manned with qualified personnel. Accurate forecasts are critical to meeting force requirements while staying within fiscal year end-strength constraints.This thesis develops and validates the Marine Corps Advanced Production Plan Model to improve Production Plan forecast, comparing its accuracy to the current methods used by manpower planners at Headquarters, United States Marine Corps. The model incorporates a constrained optimization algorithm that accounts for first-term MOS health and annual attrition when generating forecasts. Results show a 44% reduction in forecasting error for the fiscal year 2018 Production Plan compared to the executed Production Plan, cutting deviation nearly in half. This improvement leads to a more accurate forecast for 119 out of 139 Primary Occupational Specialties. This thesis recommends further testing across additional fiscal years, along with simulations, to evaluate long-term performance against the existing production planning process."],"dc:description.sponsorship":["NPS Naval Research Program","This project was funded in part by the NPS Naval Research Program."],"dc:identifier.other":["NPS-24-M208-A"],"dc:identifier.programcode":["847, Manpower Systems Analysis"],"dc:identifier.uri":["https://hdl.handle.net/10945/73699"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Manpower Systems Analysis Theses"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["aae25a6a-b787-446d-863b-de3ba49125f2"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["manpower planning","Markov model","production plan","USMC HRDP","end-strength projections","training pipeline","attrition"],"dc:title":["INNOVATING MARINE CORPS PRODUCTION PLANNING: THE MARINE CORPS ADVANCED PRODUCTION PLAN MODEL"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["40912"]},"updated_at":"2026-11-19T06:43:09Z"}