{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/74025"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/74025","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"OPTIMIZING UNIT ASSIGNMENTS FOR ARMY RESERVE COMPONENTS DURING LARGE-SCALE MOBILIZATION OPERATIONS","abstract":"First Army Headquarters (First Army) is responsible for planning and managing mobilization operations for the reserve components, which consists of the U.S. Army Reserve (USAR) and Army National Guard (ARNG). These reserve components maintain a lower state of readiness and are less resourced than the Army's active component. The USAR and ARNG rely on mobilization force generation installations (MFGIs) to rapidly train and prepare for global deployment. First Army uses a heuristics-based process to assign units and schedule training at MFGIs. The current process can take weeks to generate a solution, may provide an infeasible solution, and is difficult to scale for large operations. This research develops an integer linear program to assign units to MFGIs for large-scale mobilization operations. Open-source and commercial solvers are used to assess the model's performance on artificial data. The model is demonstrated to produce optimal solutions in less time and on larger problems than the current process. This research provides First Army with a flexible tool for mobilization planning.","abstract_html":"First Army Headquarters (First Army) is responsible for planning and managing mobilization operations for the reserve components, which consists of the U.S. Army Reserve (USAR) and Army National Guard (ARNG). These reserve components maintain a lower state of readiness and are less resourced than the Army&#x27;s active component. The USAR and ARNG rely on mobilization force generation installations (MFGIs) to rapidly train and prepare for global deployment. First Army uses a heuristics-based process to assign units and schedule training at MFGIs. The current process can take weeks to generate a solution, may provide an infeasible solution, and is difficult to scale for large operations. This research develops an integer linear program to assign units to MFGIs for large-scale mobilization operations. Open-source and commercial solvers are used to assess the model&#x27;s performance on artificial data. The model is demonstrated to produce optimal solutions in less time and on larger problems than the current process. This research provides First Army with a flexible tool for mobilization planning.","abstract_has_math":false,"creators":["Allen, David A."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Smith, Matthew D."],"committee_chairs":[],"committee_members":["Craparo, Emily M."],"year":2025,"date_issued":"2025-06","date_published":"2025-06","updated_at":"2026-11-19T06:43:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["360, Operations Analysis"],"render_values":[{"text":"360, Operations Analysis","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["40631"],"render_values":[{"text":"40631","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/74025","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/74025","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F74025","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F74025","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Smith, Matthew D."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Craparo, Emily M."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:creator","label":"Author","values":["Allen, David A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-09-08T15:36:30Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-09-08T15:36:30Z"]},{"key":"dc:date.issued","label":"Date","values":["2025-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["58745961-c46a-45ad-ae9c-d139d1ba1041"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["40631"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["mobilization","integer linear programming","large-scale optimization","scheduling","First Army Headquarter","First Army","U.S. Army Reserve","USAR","Army National Guard","ARNG","mobilization force generation instillations","MFGI"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["360, Operations Analysis"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/74025"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["First Army Headquarters (First Army) is responsible for planning and managing mobilization operations for the reserve components, which consists of the U.S. Army Reserve (USAR) and Army National Guard (ARNG). These reserve components maintain a lower state of readiness and are less resourced than the Army's active component. The USAR and ARNG rely on mobilization force generation installations (MFGIs) to rapidly train and prepare for global deployment. First Army uses a heuristics-based process to assign units and schedule training at MFGIs. The current process can take weeks to generate a solution, may provide an infeasible solution, and is difficult to scale for large operations. This research develops an integer linear program to assign units to MFGIs for large-scale mobilization operations. Open-source and commercial solvers are used to assess the model's performance on artificial data. The model is demonstrated to produce optimal solutions in less time and on larger problems than the current process. This research provides First Army with a flexible tool for mobilization planning."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:title","label":"Title","values":["OPTIMIZING UNIT ASSIGNMENTS FOR ARMY RESERVE COMPONENTS DURING LARGE-SCALE MOBILIZATION OPERATIONS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Smith, Matthew D."],"dc:contributor.committeemember":["Craparo, Emily M."],"dc:contributor.department":["Operations Research (OR)"],"dc:creator":["Allen, David A."],"dc:date.accessioned":["2025-09-08T15:36:30Z"],"dc:date.available":["2025-09-08T15:36:30Z"],"dc:date.issued":["2025-06"],"dc:description.abstract":["First Army Headquarters (First Army) is responsible for planning and managing mobilization operations for the reserve components, which consists of the U.S. Army Reserve (USAR) and Army National Guard (ARNG). These reserve components maintain a lower state of readiness and are less resourced than the Army's active component. The USAR and ARNG rely on mobilization force generation installations (MFGIs) to rapidly train and prepare for global deployment. First Army uses a heuristics-based process to assign units and schedule training at MFGIs. The current process can take weeks to generate a solution, may provide an infeasible solution, and is difficult to scale for large operations. This research develops an integer linear program to assign units to MFGIs for large-scale mobilization operations. Open-source and commercial solvers are used to assess the model's performance on artificial data. The model is demonstrated to produce optimal solutions in less time and on larger problems than the current process. This research provides First Army with a flexible tool for mobilization planning."],"dc:description.award":["Outstanding Thesis"],"dc:identifier.programcode":["360, Operations Analysis"],"dc:identifier.uri":["https://hdl.handle.net/10945/74025"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["NPS Outstanding Theses and Dissertations"],"dc:relation.orgunit":["58745961-c46a-45ad-ae9c-d139d1ba1041"],"dc:relation.seriesentity":["c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["mobilization","integer linear programming","large-scale optimization","scheduling","First Army Headquarter","First Army","U.S. Army Reserve","USAR","Army National Guard","ARNG","mobilization force generation instillations","MFGI"],"dc:title":["OPTIMIZING UNIT ASSIGNMENTS FOR ARMY RESERVE COMPONENTS DURING LARGE-SCALE MOBILIZATION OPERATIONS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, United States Army"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["40631"]},"updated_at":"2026-11-19T06:43:09Z"}