{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/74114"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/74114","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"EVALUATING NAVFAC’S PREVENTIVE MAINTENANCE STRATEGY: COST-EFFECTIVENESS AND LIFECYCLE IMPACTS ON EQUIPMENT LONGEVITY","abstract":"This thesis examines the cost-effectiveness and life cycle outcomes of the Naval Facilities Engineering Systems Command’s (NAVFAC) standardized preventive maintenance (PM) plans compared to Original Equipment Manufacturer (OEM)-guided PM plans. Using a statistical analytical approach that incorporates Robert Snow Means costing, Consumer Price Index adjustments, and Uniform Classification of Construction Systems and Assemblies (UNIFORMAT) coded MAXIMO asset records, the study analyzes over $1.2 million in material and labor costs across more than 7,152 PMs, 5,725 emergency, urgent, and routine work orders (EUR WOs), and 3,659 assets from fiscal year 2020 to fiscal year 2024. Only 2.29% EUR WOs were traceable to specific assets, highlighting data limitations. HVAC systems (D30) represented 93.7% of all PMs and 63.9% of PMs with cost data. On average, NAVFAC-standard PMs cost $173.82 per task, while OEM-guided PMs were modeled at $439.01—2.5 times higher. NAVFAC PMs, though more affordable, underperformed in extending asset longevity for complex subsystems. Findings support a hybrid strategy, applying OEM frequencies to high-value or aging systems and NAVFAC standard PMs to low-risk assets. Recommendations include refining PM tracking procedures, prioritizing critical assets using asset age and design life, and piloting dynamic PM plans to improve lifecycle cost control and operational readiness.","abstract_html":"This thesis examines the cost-effectiveness and life cycle outcomes of the Naval Facilities Engineering Systems Command’s (NAVFAC) standardized preventive maintenance (PM) plans compared to Original Equipment Manufacturer (OEM)-guided PM plans. Using a statistical analytical approach that incorporates Robert Snow Means costing, Consumer Price Index adjustments, and Uniform Classification of Construction Systems and Assemblies (UNIFORMAT) coded MAXIMO asset records, the study analyzes over $1.2 million in material and labor costs across more than 7,152 PMs, 5,725 emergency, urgent, and routine work orders (EUR WOs), and 3,659 assets from fiscal year 2020 to fiscal year 2024. Only 2.29% EUR WOs were traceable to specific assets, highlighting data limitations. HVAC systems (D30) represented 93.7% of all PMs and 63.9% of PMs with cost data. On average, NAVFAC-standard PMs cost $173.82 per task, while OEM-guided PMs were modeled at $439.01—2.5 times higher. NAVFAC PMs, though more affordable, underperformed in extending asset longevity for complex subsystems. Findings support a hybrid strategy, applying OEM frequencies to high-value or aging systems and NAVFAC standard PMs to low-risk assets. Recommendations include refining PM tracking procedures, prioritizing critical assets using asset age and design life, and piloting dynamic PM plans to improve lifecycle cost control and operational readiness.","abstract_has_math":true,"creators":["Ladaw, Uziel B."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Defense Financial Management","degree_level":"Masters","degree_discipline":"Defense Financial Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Sullivan, Ryan S.","Tick, Simona L."],"committee_chairs":[],"committee_members":[],"year":2025,"date_issued":"2025-06","date_published":"2025-06","updated_at":"2026-11-19T06:43:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["837, Defense Financial Management"],"render_values":[{"text":"837, Defense Financial Management","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["41274"],"render_values":[{"text":"41274","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/74114","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/74114","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F74114","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F74114","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Sullivan, Ryan S.","Tick, Simona L."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:creator","label":"Author","values":["Ladaw, Uziel B."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-09-08T15:45:40Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-09-08T15:45:40Z"]},{"key":"dc:date.issued","label":"Date","values":["2025-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Defense Financial Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Defense Financial Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["41274"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Naval Facilities Engineering Systems Command","NAVFAC","cost effectiveness analysis","facilities maintenance","preventive maintenance","PM","financial management","infrastructure","MAXIMO"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["837, Defense Financial Management"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/74114"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis examines the cost-effectiveness and life cycle outcomes of the Naval Facilities Engineering Systems Command’s (NAVFAC) standardized preventive maintenance (PM) plans compared to Original Equipment Manufacturer (OEM)-guided PM plans. Using a statistical analytical approach that incorporates Robert Snow Means costing, Consumer Price Index adjustments, and Uniform Classification of Construction Systems and Assemblies (UNIFORMAT) coded MAXIMO asset records, the study analyzes over $1.2 million in material and labor costs across more than 7,152 PMs, 5,725 emergency, urgent, and routine work orders (EUR WOs), and 3,659 assets from fiscal year 2020 to fiscal year 2024. Only 2.29% EUR WOs were traceable to specific assets, highlighting data limitations. HVAC systems (D30) represented 93.7% of all PMs and 63.9% of PMs with cost data. On average, NAVFAC-standard PMs cost $173.82 per task, while OEM-guided PMs were modeled at $439.01—2.5 times higher. NAVFAC PMs, though more affordable, underperformed in extending asset longevity for complex subsystems. Findings support a hybrid strategy, applying OEM frequencies to high-value or aging systems and NAVFAC standard PMs to low-risk assets. Recommendations include refining PM tracking procedures, prioritizing critical assets using asset age and design life, and piloting dynamic PM plans to improve lifecycle cost control and operational readiness."]},{"key":"dc:title","label":"Title","values":["EVALUATING NAVFAC’S PREVENTIVE MAINTENANCE STRATEGY: COST-EFFECTIVENESS AND LIFECYCLE IMPACTS ON EQUIPMENT LONGEVITY"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Sullivan, Ryan S.","Tick, Simona L."],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:creator":["Ladaw, Uziel B."],"dc:date.accessioned":["2025-09-08T15:45:40Z"],"dc:date.available":["2025-09-08T15:45:40Z"],"dc:date.issued":["2025-06"],"dc:description.abstract":["This thesis examines the cost-effectiveness and life cycle outcomes of the Naval Facilities Engineering Systems Command’s (NAVFAC) standardized preventive maintenance (PM) plans compared to Original Equipment Manufacturer (OEM)-guided PM plans. Using a statistical analytical approach that incorporates Robert Snow Means costing, Consumer Price Index adjustments, and Uniform Classification of Construction Systems and Assemblies (UNIFORMAT) coded MAXIMO asset records, the study analyzes over $1.2 million in material and labor costs across more than 7,152 PMs, 5,725 emergency, urgent, and routine work orders (EUR WOs), and 3,659 assets from fiscal year 2020 to fiscal year 2024. Only 2.29% EUR WOs were traceable to specific assets, highlighting data limitations. HVAC systems (D30) represented 93.7% of all PMs and 63.9% of PMs with cost data. On average, NAVFAC-standard PMs cost $173.82 per task, while OEM-guided PMs were modeled at $439.01—2.5 times higher. NAVFAC PMs, though more affordable, underperformed in extending asset longevity for complex subsystems. Findings support a hybrid strategy, applying OEM frequencies to high-value or aging systems and NAVFAC standard PMs to low-risk assets. Recommendations include refining PM tracking procedures, prioritizing critical assets using asset age and design life, and piloting dynamic PM plans to improve lifecycle cost control and operational readiness."],"dc:identifier.programcode":["837, Defense Financial Management"],"dc:identifier.uri":["https://hdl.handle.net/10945/74114"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["Naval Facilities Engineering Systems Command","NAVFAC","cost effectiveness analysis","facilities maintenance","preventive maintenance","PM","financial management","infrastructure","MAXIMO"],"dc:title":["EVALUATING NAVFAC’S PREVENTIVE MAINTENANCE STRATEGY: COST-EFFECTIVENESS AND LIFECYCLE IMPACTS ON EQUIPMENT LONGEVITY"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Defense Financial Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Defense Financial Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["41274"]},"updated_at":"2026-11-19T06:43:09Z"}