{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/74211"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/74211","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"BEYOND THE DETERMINISTIC: A STOCHASTIC EXTENSION TO THE MARINE CORPS ADVANCED PRODUCTION PLAN MODEL (MCAPPM)","abstract":"In March 2025, the Marine Corps Advanced Production Plan Model (MCAPPM)—a fixed inventory Markov model aimed at increasing the United States Marine Corps (USMC) production plan accuracy—was published as an NPS thesis by Captain Brian Riddle USMC. Riddle (2025) concluded the MCAPPM is deterministically more accurate than legacy production planning methods. This thesis introduces historically informed, stochastically varying state transition rates to conduct the Monte Carlo simulations required to validate MCAPPM accuracy. By comparing Fiscal Year 2018 historic planned production against MCAPPM 95% prediction intervals, this thesis concludes that historic and MCAPPM production values are different for 124 of 128 Military Occupational Specialties analyzed. MCAPPM is determined to be more accurate than historic planned production with mean absolute percentage error values of 17.4% and 30.1% respectively, indicating Markov attrition modeling may improve modeling accuracy in practice. MCAPPM forecasting is then introduced as a visual and analytical aid when comparing MCAPPM five-year forecasts against forecast inventory requirements set forth by HQMC. This thesis recommends additional research to determine the influence historic planned and executed production differences have on MCAPPM accuracy. Additionally, to fully validate the claimed accuracy of MCAPPM, Markov methods require comparison to legacy methods within current USMC modeling environments.","abstract_html":"In March 2025, the Marine Corps Advanced Production Plan Model (MCAPPM)—a fixed inventory Markov model aimed at increasing the United States Marine Corps (USMC) production plan accuracy—was published as an NPS thesis by Captain Brian Riddle USMC. Riddle (2025) concluded the MCAPPM is deterministically more accurate than legacy production planning methods. This thesis introduces historically informed, stochastically varying state transition rates to conduct the Monte Carlo simulations required to validate MCAPPM accuracy. By comparing Fiscal Year 2018 historic planned production against MCAPPM 95% prediction intervals, this thesis concludes that historic and MCAPPM production values are different for 124 of 128 Military Occupational Specialties analyzed. MCAPPM is determined to be more accurate than historic planned production with mean absolute percentage error values of 17.4% and 30.1% respectively, indicating Markov attrition modeling may improve modeling accuracy in practice. MCAPPM forecasting is then introduced as a visual and analytical aid when comparing MCAPPM five-year forecasts against forecast inventory requirements set forth by HQMC. This thesis recommends additional research to determine the influence historic planned and executed production differences have on MCAPPM accuracy. Additionally, to fully validate the claimed accuracy of MCAPPM, Markov methods require comparison to legacy methods within current USMC modeling environments.","abstract_has_math":false,"creators":["Viehdorfer, Richard F."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Koyak, Robert A.","Seagren, Chad W."],"committee_chairs":[],"committee_members":["Reich, Daniel"],"year":2025,"date_issued":"2025-06","date_published":"2025-06","updated_at":"2026-11-19T06:43:09Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["NPS-24-M208-_"],"render_values":[{"text":"NPS-24-M208-_","href":null,"code":true}]},{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["360, Operations Analysis"],"render_values":[{"text":"360, Operations Analysis","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["40653"],"render_values":[{"text":"40653","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/74211","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/74211","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F74211","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F74211","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Koyak, Robert A.","Seagren, Chad W."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Reich, Daniel"]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Research Program (NRP)"]},{"key":"dc:creator","label":"Author","values":["Viehdorfer, Richard F."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-09-08T15:57:31Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-09-08T15:57:31Z"]},{"key":"dc:date.issued","label":"Date","values":["2025-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Naval Research Program (NRP) Project Documents"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["58745961-c46a-45ad-ae9c-d139d1ba1041","78e1a7f9-aa70-4b0c-8c2c-4ff04808d293"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["2c25ebbb-dea7-48fc-8f19-5278e52aa428"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["40653"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Marine Corps Advanced Production Plan Model","MCAPPM","Military Occupational Specialty","MOS","Manpower and Reserve Affairs","M&RA","Manpower Plans and Policy","MPP","human resources","HR","fixed inventory model","Markov","transition probability matrix","stochastic modeling","Monte Carlo","simulation","forecasting","time series","manpower management","force structure","talent management","accessions","attrition","recruiting","recruitment","production","United States Marine Corps","USMC"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["NPS-24-M208-_"]},{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["360, Operations Analysis"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/74211"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In March 2025, the Marine Corps Advanced Production Plan Model (MCAPPM)—a fixed inventory Markov model aimed at increasing the United States Marine Corps (USMC) production plan accuracy—was published as an NPS thesis by Captain Brian Riddle USMC. Riddle (2025) concluded the MCAPPM is deterministically more accurate than legacy production planning methods. This thesis introduces historically informed, stochastically varying state transition rates to conduct the Monte Carlo simulations required to validate MCAPPM accuracy. By comparing Fiscal Year 2018 historic planned production against MCAPPM 95% prediction intervals, this thesis concludes that historic and MCAPPM production values are different for 124 of 128 Military Occupational Specialties analyzed. MCAPPM is determined to be more accurate than historic planned production with mean absolute percentage error values of 17.4% and 30.1% respectively, indicating Markov attrition modeling may improve modeling accuracy in practice. MCAPPM forecasting is then introduced as a visual and analytical aid when comparing MCAPPM five-year forecasts against forecast inventory requirements set forth by HQMC. This thesis recommends additional research to determine the influence historic planned and executed production differences have on MCAPPM accuracy. Additionally, to fully validate the claimed accuracy of MCAPPM, Markov methods require comparison to legacy methods within current USMC modeling environments."]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NPS Naval Research Program","This project was funded in part by the NPS Naval Research Program."]},{"key":"dc:title","label":"Title","values":["BEYOND THE DETERMINISTIC: A STOCHASTIC EXTENSION TO THE MARINE CORPS ADVANCED PRODUCTION PLAN MODEL (MCAPPM)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Koyak, Robert A.","Seagren, Chad W."],"dc:contributor.committeemember":["Reich, Daniel"],"dc:contributor.department":["Operations Research (OR)"],"dc:contributor.other":["Naval Research Program (NRP)"],"dc:creator":["Viehdorfer, Richard F."],"dc:date.accessioned":["2025-09-08T15:57:31Z"],"dc:date.available":["2025-09-08T15:57:31Z"],"dc:date.issued":["2025-06"],"dc:description.abstract":["In March 2025, the Marine Corps Advanced Production Plan Model (MCAPPM)—a fixed inventory Markov model aimed at increasing the United States Marine Corps (USMC) production plan accuracy—was published as an NPS thesis by Captain Brian Riddle USMC. Riddle (2025) concluded the MCAPPM is deterministically more accurate than legacy production planning methods. This thesis introduces historically informed, stochastically varying state transition rates to conduct the Monte Carlo simulations required to validate MCAPPM accuracy. By comparing Fiscal Year 2018 historic planned production against MCAPPM 95% prediction intervals, this thesis concludes that historic and MCAPPM production values are different for 124 of 128 Military Occupational Specialties analyzed. MCAPPM is determined to be more accurate than historic planned production with mean absolute percentage error values of 17.4% and 30.1% respectively, indicating Markov attrition modeling may improve modeling accuracy in practice. MCAPPM forecasting is then introduced as a visual and analytical aid when comparing MCAPPM five-year forecasts against forecast inventory requirements set forth by HQMC. This thesis recommends additional research to determine the influence historic planned and executed production differences have on MCAPPM accuracy. Additionally, to fully validate the claimed accuracy of MCAPPM, Markov methods require comparison to legacy methods within current USMC modeling environments."],"dc:description.sponsorship":["NPS Naval Research Program","This project was funded in part by the NPS Naval Research Program."],"dc:identifier.other":["NPS-24-M208-_"],"dc:identifier.programcode":["360, Operations Analysis"],"dc:identifier.uri":["https://hdl.handle.net/10945/74211"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Naval Research Program (NRP) Project Documents"],"dc:relation.orgunit":["58745961-c46a-45ad-ae9c-d139d1ba1041","78e1a7f9-aa70-4b0c-8c2c-4ff04808d293"],"dc:relation.seriesentity":["2c25ebbb-dea7-48fc-8f19-5278e52aa428"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["Marine Corps Advanced Production Plan Model","MCAPPM","Military Occupational Specialty","MOS","Manpower and Reserve Affairs","M&RA","Manpower Plans and Policy","MPP","human resources","HR","fixed inventory model","Markov","transition probability matrix","stochastic modeling","Monte Carlo","simulation","forecasting","time series","manpower management","force structure","talent management","accessions","attrition","recruiting","recruitment","production","United States Marine Corps","USMC"],"dc:title":["BEYOND THE DETERMINISTIC: A STOCHASTIC EXTENSION TO THE MARINE CORPS ADVANCED PRODUCTION PLAN MODEL (MCAPPM)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, United States Marine Corps"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["40653"]},"updated_at":"2026-11-19T06:43:09Z"}