{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7480"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7480","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"U.S. Coast Guard telecommunications project management using the structured approach model","abstract":"The U.S. Coast Guard has been continuously asked to perform more missions with less resources. Technological advances in telecommunications and information systems accessibility have played a major role in the Coast Guard meeting these challenges. However, to meet new demands for even greater efficiency and effectiveness, the Coast Guard strategy for tighter interoperability between Coast Guard commands must continue to evolve. To support this evolution, the Command, Control, and Communication Branch of the Coast Guard must use a strategy for project management that will foster greater efficiency and effectiveness. This strategy should include a standardized approach to project management that fosters communication, attention to detail, and leads to interoperability of systems through standardization without extensively limiting creativity or use of technological advances. This paper demonstrates how the use of systems thinking, and in particular the Structured Approach Model, can encourage the management characteristics that will lead to the development of more effective telecommunications projects and completion of those projects in a more efficient manner. This paper explains the seven phases of the Structured Approach Model and views each using the functional, organizational, and physical prospectives. Steps for applying the model are given and are aimed at the Coast Guard project officer.","abstract_html":"The U.S. Coast Guard has been continuously asked to perform more missions with less resources. Technological advances in telecommunications and information systems accessibility have played a major role in the Coast Guard meeting these challenges. However, to meet new demands for even greater efficiency and effectiveness, the Coast Guard strategy for tighter interoperability between Coast Guard commands must continue to evolve. To support this evolution, the Command, Control, and Communication Branch of the Coast Guard must use a strategy for project management that will foster greater efficiency and effectiveness. This strategy should include a standardized approach to project management that fosters communication, attention to detail, and leads to interoperability of systems through standardization without extensively limiting creativity or use of technological advances. This paper demonstrates how the use of systems thinking, and in particular the Structured Approach Model, can encourage the management characteristics that will lead to the development of more effective telecommunications projects and completion of those projects in a more efficient manner. This paper explains the seven phases of the Structured Approach Model and views each using the functional, organizational, and physical prospectives. Steps for applying the model are given and are aimed at the Coast Guard project officer.","abstract_has_math":false,"creators":["Stone, Lloyd Lee."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Information Technology Management","degree_level":"Masters","degree_discipline":"Information Technology Management","degree_department":"Information Technology Management","school":null,"contributors":[],"advisors":["Emery, James C."],"committee_chairs":[],"committee_members":[],"year":1995,"date_issued":"1995-12","date_published":"1995-12","updated_at":"2026-11-21T23:37:43Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7480","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7480","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7480","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Emery, James C."]},{"key":"dc:contributor.department","label":"Department","values":["Information Technology Management"]},{"key":"dc:creator","label":"Author","values":["Stone, Lloyd Lee."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1995"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-07-31T19:53:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-07-31T19:53:12Z"]},{"key":"dc:date.issued","label":"Date","values":["1995-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Information Technology Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Information Technology Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7480"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The U.S. Coast Guard has been continuously asked to perform more missions with less resources. Technological advances in telecommunications and information systems accessibility have played a major role in the Coast Guard meeting these challenges. However, to meet new demands for even greater efficiency and effectiveness, the Coast Guard strategy for tighter interoperability between Coast Guard commands must continue to evolve. To support this evolution, the Command, Control, and Communication Branch of the Coast Guard must use a strategy for project management that will foster greater efficiency and effectiveness. This strategy should include a standardized approach to project management that fosters communication, attention to detail, and leads to interoperability of systems through standardization without extensively limiting creativity or use of technological advances. This paper demonstrates how the use of systems thinking, and in particular the Structured Approach Model, can encourage the management characteristics that will lead to the development of more effective telecommunications projects and completion of those projects in a more efficient manner. This paper explains the seven phases of the Structured Approach Model and views each using the functional, organizational, and physical prospectives. Steps for applying the model are given and are aimed at the Coast Guard project officer."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/uscoastguardtele109457480"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["164 p. :|bill."]},{"key":"dc:title","label":"Title","values":["U.S. Coast Guard telecommunications project management using the structured approach model"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Coast Guard (U.S.C.G.) author."]}]}],"canonical_facts":{"dc:contributor.advisor":["Emery, James C."],"dc:contributor.department":["Information Technology Management"],"dc:creator":["Stone, Lloyd Lee."],"dc:date":["December 1995"],"dc:date.accessioned":["2012-07-31T19:53:12Z"],"dc:date.available":["2012-07-31T19:53:12Z"],"dc:date.issued":["1995-12"],"dc:description.abstract":["The U.S. Coast Guard has been continuously asked to perform more missions with less resources. Technological advances in telecommunications and information systems accessibility have played a major role in the Coast Guard meeting these challenges. However, to meet new demands for even greater efficiency and effectiveness, the Coast Guard strategy for tighter interoperability between Coast Guard commands must continue to evolve. To support this evolution, the Command, Control, and Communication Branch of the Coast Guard must use a strategy for project management that will foster greater efficiency and effectiveness. This strategy should include a standardized approach to project management that fosters communication, attention to detail, and leads to interoperability of systems through standardization without extensively limiting creativity or use of technological advances. This paper demonstrates how the use of systems thinking, and in particular the Structured Approach Model, can encourage the management characteristics that will lead to the development of more effective telecommunications projects and completion of those projects in a more efficient manner. This paper explains the seven phases of the Structured Approach Model and views each using the functional, organizational, and physical prospectives. Steps for applying the model are given and are aimed at the Coast Guard project officer."],"dc:description.uri":["http://archive.org/details/uscoastguardtele109457480"],"dc:format.extent":["164 p. :|bill."],"dc:identifier.uri":["https://hdl.handle.net/10945/7480"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["U.S. Coast Guard telecommunications project management using the structured approach model"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Coast Guard (U.S.C.G.) author."],"thesis:degree_discipline":["Information Technology Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Information Technology Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:37:43Z"}