{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/74843"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/74843","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"AN ECONOMIC ANALYSIS ON RISK SHARING, INCENTIVIZATION, AND DEFENSE PROCUREMENT CONTRACT DESIGN IN THE MAJOR DEFENSE ACQUISITION PROGRAM SETTING","abstract":"The purpose of this study is to develop a theory-based framework linking program risk, contractor behavior, and contract type selection to combat information asymmetry that contributes to cost overruns, slipping timelines, and underperformance relative to initial expectations in Major Defense Acquisition Programs (MDAPs). This thesis aims to answer: What is the optimal contract structure for achieving effective risk-sharing and incentivizing performance in MDAPs? Theoretical modeling and mathematical simulation are used to analyze and solve these issues and provide acquisition professionals with a practical tool to combat information asymmetry when contracting for developmental efforts of MDAPs. The research concludes that a dynamic, risk-adaptive incentive model that evolves with program maturity is most effective in combating asymmetric information. Specifically, modifying the standard cost-plus-incentive-fee (CPIF) structure where target profit and share-ratio are variables of target cost was found to be most effective when technical risk and uncertainty are high. This study recommends integrating mechanism-based analysis into defense contracting to enhance MDAP acquisition strategies. This thesis recommends implementing the Budget Based Cost-Plus Incentive Scheme (BBCPS) incentive mechanism for developmental efforts of MDAPs. The BBCPS modifies the standard CPIF incentive in a smart way to align the objectives of offerors and contractors with the government.","abstract_html":"The purpose of this study is to develop a theory-based framework linking program risk, contractor behavior, and contract type selection to combat information asymmetry that contributes to cost overruns, slipping timelines, and underperformance relative to initial expectations in Major Defense Acquisition Programs (MDAPs). This thesis aims to answer: What is the optimal contract structure for achieving effective risk-sharing and incentivizing performance in MDAPs? Theoretical modeling and mathematical simulation are used to analyze and solve these issues and provide acquisition professionals with a practical tool to combat information asymmetry when contracting for developmental efforts of MDAPs. The research concludes that a dynamic, risk-adaptive incentive model that evolves with program maturity is most effective in combating asymmetric information. Specifically, modifying the standard cost-plus-incentive-fee (CPIF) structure where target profit and share-ratio are variables of target cost was found to be most effective when technical risk and uncertainty are high. This study recommends integrating mechanism-based analysis into defense contracting to enhance MDAP acquisition strategies. This thesis recommends implementing the Budget Based Cost-Plus Incentive Scheme (BBCPS) incentive mechanism for developmental efforts of MDAPs. The BBCPS modifies the standard CPIF incentive in a smart way to align the objectives of offerors and contractors with the government.","abstract_has_math":false,"creators":["Miller, Daniel C.","Clift, James H."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Defense Contract Management","degree_level":"Masters","degree_discipline":"Defense Contract Management","degree_department":"Department of Defense Management (DDM)","school":null,"contributors":[],"advisors":["Rendon, Rene","Wang, Chong"],"committee_chairs":[],"committee_members":[],"year":2025,"date_issued":"2025-12","date_published":"2025-12","updated_at":"2026-11-24T23:54:17Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["815, Defense Contract Management"],"render_values":[{"text":"815, Defense Contract Management","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["41758"],"render_values":[{"text":"41758","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/74843","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/74843","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F74843","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F74843","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Rendon, Rene","Wang, Chong"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Defense Management (DDM)"]},{"key":"dc:creator","label":"Author","values":["Miller, Daniel C.","Clift, James H."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2026-03-17T16:20:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2026-03-17T16:20:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2025-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["6855896f-0800-4ea9-9d08-79cbe76c9d8f","bf55c4b0-99b5-450e-8fa9-6fff28f4ee3d"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Capstone Applied Project Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["409d700c-a0df-4ded-8bb7-9da7660ceddb"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Defense Contract Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Defense Contract Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["41758"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Major Defense Acquisition Program","MDAP","defense procurement","Department of Defense","DoD","acquisition reform","contracting efficiency","weapon system acquisition","economic analysis","agency theory","principal-agent problem","information asymmetry","moral hazard","risk-sharing","incentivization","information rent","deadweight loss","utility maximization","cost control","innovation incentive","contract type selection","contract design","cost-plus-incentive-fee","CPIF","Budget Based Cost-Plus Incentive Scheme","BBCPS"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["815, Defense Contract Management"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/74843"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this study is to develop a theory-based framework linking program risk, contractor behavior, and contract type selection to combat information asymmetry that contributes to cost overruns, slipping timelines, and underperformance relative to initial expectations in Major Defense Acquisition Programs (MDAPs). This thesis aims to answer: What is the optimal contract structure for achieving effective risk-sharing and incentivizing performance in MDAPs? Theoretical modeling and mathematical simulation are used to analyze and solve these issues and provide acquisition professionals with a practical tool to combat information asymmetry when contracting for developmental efforts of MDAPs. The research concludes that a dynamic, risk-adaptive incentive model that evolves with program maturity is most effective in combating asymmetric information. Specifically, modifying the standard cost-plus-incentive-fee (CPIF) structure where target profit and share-ratio are variables of target cost was found to be most effective when technical risk and uncertainty are high. This study recommends integrating mechanism-based analysis into defense contracting to enhance MDAP acquisition strategies. This thesis recommends implementing the Budget Based Cost-Plus Incentive Scheme (BBCPS) incentive mechanism for developmental efforts of MDAPs. The BBCPS modifies the standard CPIF incentive in a smart way to align the objectives of offerors and contractors with the government."]},{"key":"dc:title","label":"Title","values":["AN ECONOMIC ANALYSIS ON RISK SHARING, INCENTIVIZATION, AND DEFENSE PROCUREMENT CONTRACT DESIGN IN THE MAJOR DEFENSE ACQUISITION PROGRAM SETTING"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, United States Marine Corps","Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Rendon, Rene","Wang, Chong"],"dc:contributor.department":["Department of Defense Management (DDM)"],"dc:creator":["Miller, Daniel C.","Clift, James H."],"dc:date.accessioned":["2026-03-17T16:20:05Z"],"dc:date.available":["2026-03-17T16:20:05Z"],"dc:date.issued":["2025-12"],"dc:description.abstract":["The purpose of this study is to develop a theory-based framework linking program risk, contractor behavior, and contract type selection to combat information asymmetry that contributes to cost overruns, slipping timelines, and underperformance relative to initial expectations in Major Defense Acquisition Programs (MDAPs). This thesis aims to answer: What is the optimal contract structure for achieving effective risk-sharing and incentivizing performance in MDAPs? Theoretical modeling and mathematical simulation are used to analyze and solve these issues and provide acquisition professionals with a practical tool to combat information asymmetry when contracting for developmental efforts of MDAPs. The research concludes that a dynamic, risk-adaptive incentive model that evolves with program maturity is most effective in combating asymmetric information. Specifically, modifying the standard cost-plus-incentive-fee (CPIF) structure where target profit and share-ratio are variables of target cost was found to be most effective when technical risk and uncertainty are high. This study recommends integrating mechanism-based analysis into defense contracting to enhance MDAP acquisition strategies. This thesis recommends implementing the Budget Based Cost-Plus Incentive Scheme (BBCPS) incentive mechanism for developmental efforts of MDAPs. The BBCPS modifies the standard CPIF incentive in a smart way to align the objectives of offerors and contractors with the government."],"dc:identifier.programcode":["815, Defense Contract Management"],"dc:identifier.uri":["https://hdl.handle.net/10945/74843"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.advisorentity":["6855896f-0800-4ea9-9d08-79cbe76c9d8f","bf55c4b0-99b5-450e-8fa9-6fff28f4ee3d"],"dc:relation.ispartofseries":["Capstone Applied Project Reports"],"dc:relation.orgunit":["b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["409d700c-a0df-4ded-8bb7-9da7660ceddb"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["Major Defense Acquisition Program","MDAP","defense procurement","Department of Defense","DoD","acquisition reform","contracting efficiency","weapon system acquisition","economic analysis","agency theory","principal-agent problem","information asymmetry","moral hazard","risk-sharing","incentivization","information rent","deadweight loss","utility maximization","cost control","innovation incentive","contract type selection","contract design","cost-plus-incentive-fee","CPIF","Budget Based Cost-Plus Incentive Scheme","BBCPS"],"dc:title":["AN ECONOMIC ANALYSIS ON RISK SHARING, INCENTIVIZATION, AND DEFENSE PROCUREMENT CONTRACT DESIGN IN THE MAJOR DEFENSE ACQUISITION PROGRAM SETTING"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, United States Marine Corps","Lieutenant, United States Navy"],"thesis:degree_discipline":["Defense Contract Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Defense Contract Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["41758"]},"updated_at":"2026-11-24T23:54:17Z"}