{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/75646"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/75646","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"ESTIMATING THE COST OF INEFFICIENT DECISION METRICS: SIMPLIFYING THE SHORE INFRASTRUCTURE PRIORITIZATION PROCESS","abstract":"Every year, the U.S. Navy (USN) must decide which infrastructure projects to fund given limited budgets yet billions of dollars in requirements. For two decades, the decision lens (DL) metric has been used for this prioritization by comparing infrastructure projects on key factors, such as mission alignment and operational cost. Despite its role in shaping investment decisions, little analysis has been conducted on the DL metric or its impact on the Shore Cross Functional Team (SCFT) process, which costs millions of dollars and uses thousands of person-hours to adjudicate DL scores every year. This work uses stochastic simulation to estimate the current costs to produce DL scores, whether a simplified DL metric would reflect USN priorities, and if there are any savings in the SCFT process with a simplified metric. First, we develop a stochastic model to estimate time and costs (i.e., salaries by pay grade) required for the SCFT, which shows the SCFT can cost an average of $1.8M and 35,000 person-hours per year given uncertainty in number of projects and people. Then, we analyze historical DL scores to determine which DL factors are necessary to align scores to USN priorities. Results show that some factors are redundant—i.e., the DL metric is >90% rank correlated to historical priorities without considering them at all. Accordingly, we estimate the cost and time savings incurred by removing these redundant factors approach 57% annually, or up to $1.0M and 20,000 person-hours.","abstract_html":"Every year, the U.S. Navy (USN) must decide which infrastructure projects to fund given limited budgets yet billions of dollars in requirements. For two decades, the decision lens (DL) metric has been used for this prioritization by comparing infrastructure projects on key factors, such as mission alignment and operational cost. Despite its role in shaping investment decisions, little analysis has been conducted on the DL metric or its impact on the Shore Cross Functional Team (SCFT) process, which costs millions of dollars and uses thousands of person-hours to adjudicate DL scores every year. This work uses stochastic simulation to estimate the current costs to produce DL scores, whether a simplified DL metric would reflect USN priorities, and if there are any savings in the SCFT process with a simplified metric. First, we develop a stochastic model to estimate time and costs (i.e., salaries by pay grade) required for the SCFT, which shows the SCFT can cost an average of $1.8M and 35,000 person-hours per year given uncertainty in number of projects and people. Then, we analyze historical DL scores to determine which DL factors are necessary to align scores to USN priorities. Results show that some factors are redundant—i.e., the DL metric is &gt;90% rank correlated to historical priorities without considering them at all. Accordingly, we estimate the cost and time savings incurred by removing these redundant factors approach 57% annually, or up to $1.0M and 20,000 person-hours.","abstract_has_math":true,"creators":["Allison, Stuart G."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Alderson, David L., Jr.","Eisenberg, Daniel"],"committee_chairs":[],"committee_members":["Atkinson, Michael P."],"year":2026,"date_issued":"2026-06","date_published":"2026-06","updated_at":"2026-11-19T06:43:32Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["360, Operations Analysis"],"render_values":[{"text":"360, Operations Analysis","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["41840"],"render_values":[{"text":"41840","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/75646","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/75646","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F75646","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F75646","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Alderson, David L., Jr.","Eisenberg, Daniel"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Atkinson, Michael P."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:creator","label":"Author","values":["Allison, Stuart G."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2026-09-03T16:55:33Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2026-09-03T16:55:33Z"]},{"key":"dc:date.issued","label":"Date","values":["2026-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["58745961-c46a-45ad-ae9c-d139d1ba1041"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["41840"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["infrastructure","military construction","MILCON","prioritization","decision theory","sensitivity analysis","stochastic simulation","cost estimation","U.S. Navy","USN","decision lens","DL","Shore Cross Functional Team","SCFT"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["360, Operations Analysis"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/75646"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Every year, the U.S. Navy (USN) must decide which infrastructure projects to fund given limited budgets yet billions of dollars in requirements. For two decades, the decision lens (DL) metric has been used for this prioritization by comparing infrastructure projects on key factors, such as mission alignment and operational cost. Despite its role in shaping investment decisions, little analysis has been conducted on the DL metric or its impact on the Shore Cross Functional Team (SCFT) process, which costs millions of dollars and uses thousands of person-hours to adjudicate DL scores every year. This work uses stochastic simulation to estimate the current costs to produce DL scores, whether a simplified DL metric would reflect USN priorities, and if there are any savings in the SCFT process with a simplified metric. First, we develop a stochastic model to estimate time and costs (i.e., salaries by pay grade) required for the SCFT, which shows the SCFT can cost an average of $1.8M and 35,000 person-hours per year given uncertainty in number of projects and people. Then, we analyze historical DL scores to determine which DL factors are necessary to align scores to USN priorities. Results show that some factors are redundant—i.e., the DL metric is >90% rank correlated to historical priorities without considering them at all. Accordingly, we estimate the cost and time savings incurred by removing these redundant factors approach 57% annually, or up to $1.0M and 20,000 person-hours."]},{"key":"dc:title","label":"Title","values":["ESTIMATING THE COST OF INEFFICIENT DECISION METRICS: SIMPLIFYING THE SHORE INFRASTRUCTURE PRIORITIZATION PROCESS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Alderson, David L., Jr.","Eisenberg, Daniel"],"dc:contributor.committeemember":["Atkinson, Michael P."],"dc:contributor.department":["Operations Research (OR)"],"dc:creator":["Allison, Stuart G."],"dc:date.accessioned":["2026-09-03T16:55:33Z"],"dc:date.available":["2026-09-03T16:55:33Z"],"dc:date.issued":["2026-06"],"dc:description.abstract":["Every year, the U.S. Navy (USN) must decide which infrastructure projects to fund given limited budgets yet billions of dollars in requirements. For two decades, the decision lens (DL) metric has been used for this prioritization by comparing infrastructure projects on key factors, such as mission alignment and operational cost. Despite its role in shaping investment decisions, little analysis has been conducted on the DL metric or its impact on the Shore Cross Functional Team (SCFT) process, which costs millions of dollars and uses thousands of person-hours to adjudicate DL scores every year. This work uses stochastic simulation to estimate the current costs to produce DL scores, whether a simplified DL metric would reflect USN priorities, and if there are any savings in the SCFT process with a simplified metric. First, we develop a stochastic model to estimate time and costs (i.e., salaries by pay grade) required for the SCFT, which shows the SCFT can cost an average of $1.8M and 35,000 person-hours per year given uncertainty in number of projects and people. Then, we analyze historical DL scores to determine which DL factors are necessary to align scores to USN priorities. Results show that some factors are redundant—i.e., the DL metric is >90% rank correlated to historical priorities without considering them at all. Accordingly, we estimate the cost and time savings incurred by removing these redundant factors approach 57% annually, or up to $1.0M and 20,000 person-hours."],"dc:identifier.programcode":["360, Operations Analysis"],"dc:identifier.uri":["https://hdl.handle.net/10945/75646"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["58745961-c46a-45ad-ae9c-d139d1ba1041"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["infrastructure","military construction","MILCON","prioritization","decision theory","sensitivity analysis","stochastic simulation","cost estimation","U.S. Navy","USN","decision lens","DL","Shore Cross Functional Team","SCFT"],"dc:title":["ESTIMATING THE COST OF INEFFICIENT DECISION METRICS: SIMPLIFYING THE SHORE INFRASTRUCTURE PRIORITIZATION PROCESS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["41840"]},"updated_at":"2026-11-19T06:43:32Z"}