{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/75959"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/75959","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"ENHANCING CONTINGENCY CONTRACTING WITH OPERATIONALIZED LARGE LANGUAGE MODELS","abstract":"Contingency contracting during unplanned events requires all the same steps as normal procurement, but with more urgency. Performance work statements (PWS) are “the heart of the procurement.” Clearly explaining the scope of the requirement to a contractor increases understandability and reduces iterative discussions between the government and contractor. Urgent PWS drafting in readable language is high risk due to experience disparities and untrained surveillance staff. Artificial intelligence Large Language Models (LLMs) are actively deployed to support writing applications but generate probabilistic outputs. LLM technology lacks consistent evaluation mechanisms for acquisition applications. This research adapted Dr. Rendon’s auditability theory framework to evaluate LLM writing capability. The two-phase experiment methodology and results directly benefit industry, contracting officers, surveillance personnel, and requirements owners. The experiment evaluated the writing performance of different DOD exclusive LLMs compared with human written control. LLM and human written samples were compared and evaluated using established quantitative readability tools. Results demonstrate clearly that LLMs default settings produce less readable output than human written versions. Only by prompting LLMs with clear “plain writing” constraints does the model produce a readable output.","abstract_html":"Contingency contracting during unplanned events requires all the same steps as normal procurement, but with more urgency. Performance work statements (PWS) are “the heart of the procurement.” Clearly explaining the scope of the requirement to a contractor increases understandability and reduces iterative discussions between the government and contractor. Urgent PWS drafting in readable language is high risk due to experience disparities and untrained surveillance staff. Artificial intelligence Large Language Models (LLMs) are actively deployed to support writing applications but generate probabilistic outputs. LLM technology lacks consistent evaluation mechanisms for acquisition applications. This research adapted Dr. Rendon’s auditability theory framework to evaluate LLM writing capability. The two-phase experiment methodology and results directly benefit industry, contracting officers, surveillance personnel, and requirements owners. The experiment evaluated the writing performance of different DOD exclusive LLMs compared with human written control. LLM and human written samples were compared and evaluated using established quantitative readability tools. Results demonstrate clearly that LLMs default settings produce less readable output than human written versions. Only by prompting LLMs with clear “plain writing” constraints does the model produce a readable output.","abstract_has_math":false,"creators":["Weigle, James H.","Ruess, Brandon J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Defense Contract Management","degree_level":"Masters","degree_discipline":"Defense Contract Management","degree_department":"Department of Acquisition, Finance and Manpower (DAFM)","school":null,"contributors":[],"advisors":["Dunlap, Jeffrey"],"committee_chairs":[],"committee_members":["Rendon, Rene"],"year":2026,"date_issued":"2026-06","date_published":"2026-06","updated_at":"2026-11-24T23:54:39Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["815, Defense Contract Management"],"render_values":[{"text":"815, Defense Contract Management","href":null,"code":true}]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["41996"],"render_values":[{"text":"41996","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/75959","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/75959","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F75959","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F75959","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dunlap, Jeffrey"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Rendon, Rene"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Acquisition, Finance and Manpower (DAFM)"]},{"key":"dc:creator","label":"Author","values":["Weigle, James H.","Ruess, Brandon J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2026-09-08T20:05:23Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2026-09-08T20:05:23Z"]},{"key":"dc:date.issued","label":"Date","values":["2026-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["d520de0d-04e3-4043-9c7d-b354ee8067ce"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Capstone Applied Project Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["ff28ff54-a1d6-4c99-955a-999e99bd8f6d"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["409d700c-a0df-4ded-8bb7-9da7660ceddb"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Defense Contract Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Defense Contract Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]},{"key":"thesis:thesis_identifier","label":"Thesis Thesis Identifier","values":["41996"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Large Language Model","LLM","Performance Work Statement","PWS","performance-based","contracting","requirements","readability","Flesch-Kinkaid","Plain Language","Evaluation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.programcode","label":"Dc Identifier Programcode","values":["815, Defense Contract Management"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/75959"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Contingency contracting during unplanned events requires all the same steps as normal procurement, but with more urgency. Performance work statements (PWS) are “the heart of the procurement.” Clearly explaining the scope of the requirement to a contractor increases understandability and reduces iterative discussions between the government and contractor. Urgent PWS drafting in readable language is high risk due to experience disparities and untrained surveillance staff. Artificial intelligence Large Language Models (LLMs) are actively deployed to support writing applications but generate probabilistic outputs. LLM technology lacks consistent evaluation mechanisms for acquisition applications. This research adapted Dr. Rendon’s auditability theory framework to evaluate LLM writing capability. The two-phase experiment methodology and results directly benefit industry, contracting officers, surveillance personnel, and requirements owners. The experiment evaluated the writing performance of different DOD exclusive LLMs compared with human written control. LLM and human written samples were compared and evaluated using established quantitative readability tools. Results demonstrate clearly that LLMs default settings produce less readable output than human written versions. Only by prompting LLMs with clear “plain writing” constraints does the model produce a readable output."]},{"key":"dc:title","label":"Title","values":["ENHANCING CONTINGENCY CONTRACTING WITH OPERATIONALIZED LARGE LANGUAGE MODELS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy","Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dunlap, Jeffrey"],"dc:contributor.committeemember":["Rendon, Rene"],"dc:contributor.department":["Department of Acquisition, Finance and Manpower (DAFM)"],"dc:creator":["Weigle, James H.","Ruess, Brandon J."],"dc:date.accessioned":["2026-09-08T20:05:23Z"],"dc:date.available":["2026-09-08T20:05:23Z"],"dc:date.issued":["2026-06"],"dc:description.abstract":["Contingency contracting during unplanned events requires all the same steps as normal procurement, but with more urgency. Performance work statements (PWS) are “the heart of the procurement.” Clearly explaining the scope of the requirement to a contractor increases understandability and reduces iterative discussions between the government and contractor. Urgent PWS drafting in readable language is high risk due to experience disparities and untrained surveillance staff. Artificial intelligence Large Language Models (LLMs) are actively deployed to support writing applications but generate probabilistic outputs. LLM technology lacks consistent evaluation mechanisms for acquisition applications. This research adapted Dr. Rendon’s auditability theory framework to evaluate LLM writing capability. The two-phase experiment methodology and results directly benefit industry, contracting officers, surveillance personnel, and requirements owners. The experiment evaluated the writing performance of different DOD exclusive LLMs compared with human written control. LLM and human written samples were compared and evaluated using established quantitative readability tools. Results demonstrate clearly that LLMs default settings produce less readable output than human written versions. Only by prompting LLMs with clear “plain writing” constraints does the model produce a readable output."],"dc:identifier.programcode":["815, Defense Contract Management"],"dc:identifier.uri":["https://hdl.handle.net/10945/75959"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.advisorentity":["d520de0d-04e3-4043-9c7d-b354ee8067ce"],"dc:relation.ispartofseries":["Capstone Applied Project Reports"],"dc:relation.orgunit":["ff28ff54-a1d6-4c99-955a-999e99bd8f6d"],"dc:relation.seriesentity":["409d700c-a0df-4ded-8bb7-9da7660ceddb"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["Large Language Model","LLM","Performance Work Statement","PWS","performance-based","contracting","requirements","readability","Flesch-Kinkaid","Plain Language","Evaluation"],"dc:title":["ENHANCING CONTINGENCY CONTRACTING WITH OPERATIONALIZED LARGE LANGUAGE MODELS"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy","Captain, United States Marine Corps"],"thesis:degree_discipline":["Defense Contract Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Defense Contract Management"],"thesis:institution_name":["Naval Postgraduate School"],"thesis:thesis_identifier":["41996"]},"updated_at":"2026-11-24T23:54:39Z"}