{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7659"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7659","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A cost model for estimating operating and support costs for US Navy (nuclear) submarines","abstract":"This thesis attempts to formulate a parametric cost model to estimate the annual operating and support (O&S) cost of future U.S. Navy (nuclear) submarines, based on presumed physical characteristics and manpower expectations. Source data for the analysis is obtained from the Navy's VAMOSC database. Using regression analysis techniques, cost estimating relationships are developed for three assumed cost drivers - manpower, length, and submerged displacement. However, the analysis reveals that there is no significant relationship between annual O&S cost and the three assumed cost drivers. Therefore, an alternative method of estimating annual O&S cost is presented using probabilistic assessment of cost based on the empirical annual O&S cost distribution. The probabilistic assessment method allows decision-makers and cost analysts to estimate the annual O&S cost for which there is a desired probability that the true annual O&S cost of a new submarine will not be exceeded. For example, historically, 80 percent of all SSNs have experienced annual O&S costs of less than $27 M (CY99$), while the remaining 20 percent have experienced annual O&S costs greater than $27 M (CY99$). So, loosely speaking, one can be approximately 80 percent confident that the annual O&S cost of a newly acquired SSN will be no more than $27 M (CY99$). Similar results can be obtained for an SSN or SSBN, and for any desired probability.","abstract_html":"This thesis attempts to formulate a parametric cost model to estimate the annual operating and support (O&amp;S) cost of future U.S. Navy (nuclear) submarines, based on presumed physical characteristics and manpower expectations. Source data for the analysis is obtained from the Navy&#x27;s VAMOSC database. Using regression analysis techniques, cost estimating relationships are developed for three assumed cost drivers - manpower, length, and submerged displacement. However, the analysis reveals that there is no significant relationship between annual O&amp;S cost and the three assumed cost drivers. Therefore, an alternative method of estimating annual O&amp;S cost is presented using probabilistic assessment of cost based on the empirical annual O&amp;S cost distribution. The probabilistic assessment method allows decision-makers and cost analysts to estimate the annual O&amp;S cost for which there is a desired probability that the true annual O&amp;S cost of a new submarine will not be exceeded. For example, historically, 80 percent of all SSNs have experienced annual O&amp;S costs of less than $27 M (CY99$), while the remaining 20 percent have experienced annual O&amp;S costs greater than $27 M (CY99$). So, loosely speaking, one can be approximately 80 percent confident that the annual O&amp;S cost of a newly acquired SSN will be no more than $27 M (CY99$). Similar results can be obtained for an SSN or SSBN, and for any desired probability.","abstract_has_math":true,"creators":["Allison, William J."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Anderson, Timothy P."],"committee_chairs":[],"committee_members":["Buttrey, Samuel E."],"year":2000,"date_issued":"2000-06-01","date_published":"2000-06-01","updated_at":"2026-11-21T22:49:05Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7659","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7659","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7659","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Anderson, Timothy P."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Buttrey, Samuel E."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Allison, William J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 2000"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T18:47:22Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T18:47:22Z"]},{"key":"dc:date.issued","label":"Date","values":["2000-06-01"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Government","Cost estimating","Submarines","Operating and support","Statistics/regression"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7659"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis attempts to formulate a parametric cost model to estimate the annual operating and support (O&S) cost of future U.S. Navy (nuclear) submarines, based on presumed physical characteristics and manpower expectations. Source data for the analysis is obtained from the Navy's VAMOSC database. Using regression analysis techniques, cost estimating relationships are developed for three assumed cost drivers - manpower, length, and submerged displacement. However, the analysis reveals that there is no significant relationship between annual O&S cost and the three assumed cost drivers. Therefore, an alternative method of estimating annual O&S cost is presented using probabilistic assessment of cost based on the empirical annual O&S cost distribution. The probabilistic assessment method allows decision-makers and cost analysts to estimate the annual O&S cost for which there is a desired probability that the true annual O&S cost of a new submarine will not be exceeded. For example, historically, 80 percent of all SSNs have experienced annual O&S costs of less than $27 M (CY99$), while the remaining 20 percent have experienced annual O&S costs greater than $27 M (CY99$). So, loosely speaking, one can be approximately 80 percent confident that the annual O&S cost of a newly acquired SSN will be no more than $27 M (CY99$). Similar results can be obtained for an SSN or SSBN, and for any desired probability."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/acostmodelforest109457659"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xiv, 61 p."]},{"key":"dc:title","label":"Title","values":["A cost model for estimating operating and support costs for US Navy (nuclear) submarines"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Anderson, Timothy P."],"dc:contributor.committeemember":["Buttrey, Samuel E."],"dc:contributor.department":["Operations Research (OR)"],"dc:contributor.other":["Naval Postgraduate School"],"dc:creator":["Allison, William J."],"dc:date":["June 2000"],"dc:date.accessioned":["2012-08-09T18:47:22Z"],"dc:date.available":["2012-08-09T18:47:22Z"],"dc:date.issued":["2000-06-01"],"dc:description.abstract":["This thesis attempts to formulate a parametric cost model to estimate the annual operating and support (O&S) cost of future U.S. Navy (nuclear) submarines, based on presumed physical characteristics and manpower expectations. Source data for the analysis is obtained from the Navy's VAMOSC database. Using regression analysis techniques, cost estimating relationships are developed for three assumed cost drivers - manpower, length, and submerged displacement. However, the analysis reveals that there is no significant relationship between annual O&S cost and the three assumed cost drivers. Therefore, an alternative method of estimating annual O&S cost is presented using probabilistic assessment of cost based on the empirical annual O&S cost distribution. The probabilistic assessment method allows decision-makers and cost analysts to estimate the annual O&S cost for which there is a desired probability that the true annual O&S cost of a new submarine will not be exceeded. For example, historically, 80 percent of all SSNs have experienced annual O&S costs of less than $27 M (CY99$), while the remaining 20 percent have experienced annual O&S costs greater than $27 M (CY99$). So, loosely speaking, one can be approximately 80 percent confident that the annual O&S cost of a newly acquired SSN will be no more than $27 M (CY99$). Similar results can be obtained for an SSN or SSBN, and for any desired probability."],"dc:description.uri":["http://archive.org/details/acostmodelforest109457659"],"dc:format.extent":["xiv, 61 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/7659"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Government","Cost estimating","Submarines","Operating and support","Statistics/regression"],"dc:title":["A cost model for estimating operating and support costs for US Navy (nuclear) submarines"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:49:05Z"}