{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7752"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7752","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Optimally scheduling EA-6B depot maintenance and aircraft modification kit procurement","abstract":"The Department of the Navy maintains a fleet of 124 EA-6B aircraft, the only tactical electronic warfare aircraft in the Department of Defense inventory. Already 30 years old and not to be retired until 2015, the EA-6B requries depot maintenance services to remain combat ready. EA-6B aircraft undergo standard depot level maintenance (SDLM) about every eight years. In addition to SDLM, depots must complete 72 wing center section replacement services and over 175 major aircraft modification services by 2010. Navy regulations govern when each EA-6B is eligible for each service; these rules are flexible enough to allow more induction schedules than can be evaluated manually in a reasonable amount of time. Because each service keeps an aircraft at the depot for six to 14 months and performing multiple services together requires less time than performing services independently, services should be combined whenever possible. This thesis introduces DMAAP (Depot Maintenance And Acquisition Planner); a prototypic optimization based decision support tool to assist in scheduling EA-6B depot level maintenance services and major aircraft modification kit acquisition. DMAAP produces a Master Plan (induction schedule) providing a monthly schedule for the first six years, a yearly schedule out to 2013 and yearly major aircraft modification kit acquisition levels out to 2010. We compare DMAAP Master Plans obtained using alternate depot induction policies to demonstrate DMAAP's ability and show how yearly depot workloads and yearly operational aircraft vary under alternate policies.","abstract_html":"The Department of the Navy maintains a fleet of 124 EA-6B aircraft, the only tactical electronic warfare aircraft in the Department of Defense inventory. Already 30 years old and not to be retired until 2015, the EA-6B requries depot maintenance services to remain combat ready. EA-6B aircraft undergo standard depot level maintenance (SDLM) about every eight years. In addition to SDLM, depots must complete 72 wing center section replacement services and over 175 major aircraft modification services by 2010. Navy regulations govern when each EA-6B is eligible for each service; these rules are flexible enough to allow more induction schedules than can be evaluated manually in a reasonable amount of time. Because each service keeps an aircraft at the depot for six to 14 months and performing multiple services together requires less time than performing services independently, services should be combined whenever possible. This thesis introduces DMAAP (Depot Maintenance And Acquisition Planner); a prototypic optimization based decision support tool to assist in scheduling EA-6B depot level maintenance services and major aircraft modification kit acquisition. DMAAP produces a Master Plan (induction schedule) providing a monthly schedule for the first six years, a yearly schedule out to 2013 and yearly major aircraft modification kit acquisition levels out to 2010. We compare DMAAP Master Plans obtained using alternate depot induction policies to demonstrate DMAAP&#x27;s ability and show how yearly depot workloads and yearly operational aircraft vary under alternate policies.","abstract_has_math":false,"creators":["Baker, Rosser O., Jr."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Analysis","degree_level":"Masters","degree_discipline":"Operations Analysis","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Dell, Robert F."],"committee_chairs":[],"committee_members":["Washburn, Alan R."],"year":2000,"date_issued":"2000-09-01","date_published":"2000-09-01","updated_at":"2026-11-21T22:39:08Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7752","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7752","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7752","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dell, Robert F."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Washburn, Alan R."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Baker, Rosser O., Jr."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September 2000"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T18:47:59Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T18:47:59Z"]},{"key":"dc:date.issued","label":"Date","values":["2000-09-01"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Analysis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Analysis"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Integer linear programming","Aircraft depot maintenance","Optimization","EA-6B","Standard depot level maintenance"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7752"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Department of the Navy maintains a fleet of 124 EA-6B aircraft, the only tactical electronic warfare aircraft in the Department of Defense inventory. Already 30 years old and not to be retired until 2015, the EA-6B requries depot maintenance services to remain combat ready. EA-6B aircraft undergo standard depot level maintenance (SDLM) about every eight years. In addition to SDLM, depots must complete 72 wing center section replacement services and over 175 major aircraft modification services by 2010. Navy regulations govern when each EA-6B is eligible for each service; these rules are flexible enough to allow more induction schedules than can be evaluated manually in a reasonable amount of time. Because each service keeps an aircraft at the depot for six to 14 months and performing multiple services together requires less time than performing services independently, services should be combined whenever possible. This thesis introduces DMAAP (Depot Maintenance And Acquisition Planner); a prototypic optimization based decision support tool to assist in scheduling EA-6B depot level maintenance services and major aircraft modification kit acquisition. DMAAP produces a Master Plan (induction schedule) providing a monthly schedule for the first six years, a yearly schedule out to 2013 and yearly major aircraft modification kit acquisition levels out to 2010. We compare DMAAP Master Plans obtained using alternate depot induction policies to demonstrate DMAAP's ability and show how yearly depot workloads and yearly operational aircraft vary under alternate policies."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/optimallyschedul109457752"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xii, 56 p."]},{"key":"dc:title","label":"Title","values":["Optimally scheduling EA-6B depot maintenance and aircraft modification kit procurement"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dell, Robert F."],"dc:contributor.committeemember":["Washburn, Alan R."],"dc:contributor.department":["Operations Research (OR)"],"dc:contributor.other":["Naval Postgraduate School"],"dc:creator":["Baker, Rosser O., Jr."],"dc:date":["September 2000"],"dc:date.accessioned":["2012-08-09T18:47:59Z"],"dc:date.available":["2012-08-09T18:47:59Z"],"dc:date.issued":["2000-09-01"],"dc:description.abstract":["The Department of the Navy maintains a fleet of 124 EA-6B aircraft, the only tactical electronic warfare aircraft in the Department of Defense inventory. Already 30 years old and not to be retired until 2015, the EA-6B requries depot maintenance services to remain combat ready. EA-6B aircraft undergo standard depot level maintenance (SDLM) about every eight years. In addition to SDLM, depots must complete 72 wing center section replacement services and over 175 major aircraft modification services by 2010. Navy regulations govern when each EA-6B is eligible for each service; these rules are flexible enough to allow more induction schedules than can be evaluated manually in a reasonable amount of time. Because each service keeps an aircraft at the depot for six to 14 months and performing multiple services together requires less time than performing services independently, services should be combined whenever possible. This thesis introduces DMAAP (Depot Maintenance And Acquisition Planner); a prototypic optimization based decision support tool to assist in scheduling EA-6B depot level maintenance services and major aircraft modification kit acquisition. DMAAP produces a Master Plan (induction schedule) providing a monthly schedule for the first six years, a yearly schedule out to 2013 and yearly major aircraft modification kit acquisition levels out to 2010. We compare DMAAP Master Plans obtained using alternate depot induction policies to demonstrate DMAAP's ability and show how yearly depot workloads and yearly operational aircraft vary under alternate policies."],"dc:description.uri":["http://archive.org/details/optimallyschedul109457752"],"dc:format.extent":["xii, 56 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/7752"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Integer linear programming","Aircraft depot maintenance","Optimization","EA-6B","Standard depot level maintenance"],"dc:title":["Optimally scheduling EA-6B depot maintenance and aircraft modification kit procurement"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, United States Marine Corps"],"thesis:degree_discipline":["Operations Analysis"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Analysis"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:39:08Z"}