{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7760"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7760","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The owner's level of effort in design-build contracts","abstract":"Project delivery systems currently used in the United States can broadly be divided into three principal categories: design-bid-build, construction management at risk, and design-build. Over the past decade as owners, in both the private and public sectors, have pushed for faster delivery and lower costs for their projects, design-build has been increasingly heralded as the optimum solution for most situations. Recent research has supported such claims showing design-build outperforming the other systems in terms of cost and schedule, while equaling or exceeding the other systems in quality performance.","abstract_html":"Project delivery systems currently used in the United States can broadly be divided into three principal categories: design-bid-build, construction management at risk, and design-build. Over the past decade as owners, in both the private and public sectors, have pushed for faster delivery and lower costs for their projects, design-build has been increasingly heralded as the optimum solution for most situations. Recent research has supported such claims showing design-build outperforming the other systems in terms of cost and schedule, while equaling or exceeding the other systems in quality performance.","abstract_has_math":false,"creators":["Fetters, Damon Scott"],"institution":"University of Texas at Austin","degree_name":"Master of Science in Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2000,"date_issued":"2000-08","date_published":"2000-08","updated_at":"2026-11-19T06:44:00Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o640952604"],"render_values":[{"text":"o640952604","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7760","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7760","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7760","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Fetters, Damon Scott"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T18:48:02Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T18:48:02Z"]},{"key":"dc:date.issued","label":"Date","values":["2000-08"]},{"key":"dc:publisher","label":"Institution","values":["University of Texas at Austin"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Texas at Austin"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o640952604"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7760"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Project delivery systems currently used in the United States can broadly be divided into three principal categories: design-bid-build, construction management at risk, and design-build. Over the past decade as owners, in both the private and public sectors, have pushed for faster delivery and lower costs for their projects, design-build has been increasingly heralded as the optimum solution for most situations. Recent research has supported such claims showing design-build outperforming the other systems in terms of cost and schedule, while equaling or exceeding the other systems in quality performance."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/theownerslevelof109457760"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["184 p."]},{"key":"dc:title","label":"Title","values":["The owner's level of effort in design-build contracts"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Fetters, Damon Scott"],"dc:date.accessioned":["2012-08-09T18:48:02Z"],"dc:date.available":["2012-08-09T18:48:02Z"],"dc:date.issued":["2000-08"],"dc:description.abstract":["Project delivery systems currently used in the United States can broadly be divided into three principal categories: design-bid-build, construction management at risk, and design-build. Over the past decade as owners, in both the private and public sectors, have pushed for faster delivery and lower costs for their projects, design-build has been increasingly heralded as the optimum solution for most situations. Recent research has supported such claims showing design-build outperforming the other systems in terms of cost and schedule, while equaling or exceeding the other systems in quality performance."],"dc:description.uri":["http://archive.org/details/theownerslevelof109457760"],"dc:format.extent":["184 p."],"dc:identifier.oclc":["o640952604"],"dc:identifier.uri":["https://hdl.handle.net/10945/7760"],"dc:publisher":["University of Texas at Austin"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["The owner's level of effort in design-build contracts"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Engineering"],"thesis:institution_name":["University of Texas at Austin"]},"updated_at":"2026-11-19T06:44:00Z"}