{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7786"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7786","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Selecting, planning and scheduling specifications for construction projects","abstract":"This thesis analyzes the effect of contract remuneration type and project complexity on the desirability of planning and scheduling specification clauses for construction projects. The information in this thesis is based on the analysis of responses to a survey that was sent to randomly selected construction companies, large owners, and various Naval Facilities Engineering Commands. For the survey, traditional definitions of lump sum and cost reimbursable contracts were used, and an easily quantifiable project complexity rating was developed. The analysis provides practical insights on which planning and scheduling specification clauses should be included for projects of different complexities and remuneration types. It also provides valuable insights on the differences in how contractors and owners view each planning and scheduling specification clause. Conclusions and recommendations are presented based on the results of the analysis..","abstract_html":"This thesis analyzes the effect of contract remuneration type and project complexity on the desirability of planning and scheduling specification clauses for construction projects. The information in this thesis is based on the analysis of responses to a survey that was sent to randomly selected construction companies, large owners, and various Naval Facilities Engineering Commands. For the survey, traditional definitions of lump sum and cost reimbursable contracts were used, and an easily quantifiable project complexity rating was developed. The analysis provides practical insights on which planning and scheduling specification clauses should be included for projects of different complexities and remuneration types. It also provides valuable insights on the differences in how contractors and owners view each planning and scheduling specification clause. Conclusions and recommendations are presented based on the results of the analysis..","abstract_has_math":false,"creators":["Ballast, Leaf Aquilla"],"institution":"University of Texas at Austin","degree_name":"Master of Science in Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Popescu, Calin M.","Hass, Carl T."],"committee_chairs":[],"committee_members":[],"year":2000,"date_issued":"2000-05","date_published":"2000-05","updated_at":"2026-11-19T06:44:00Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7786","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7786","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7786","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Popescu, Calin M.","Hass, Carl T."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Ballast, Leaf Aquilla"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T18:48:11Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T18:48:11Z"]},{"key":"dc:date.issued","label":"Date","values":["2000-05"]},{"key":"dc:publisher","label":"Institution","values":["University of Texas at Austin"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Texas at Austin"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7786"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis analyzes the effect of contract remuneration type and project complexity on the desirability of planning and scheduling specification clauses for construction projects. The information in this thesis is based on the analysis of responses to a survey that was sent to randomly selected construction companies, large owners, and various Naval Facilities Engineering Commands. For the survey, traditional definitions of lump sum and cost reimbursable contracts were used, and an easily quantifiable project complexity rating was developed. The analysis provides practical insights on which planning and scheduling specification clauses should be included for projects of different complexities and remuneration types. It also provides valuable insights on the differences in how contractors and owners view each planning and scheduling specification clause. Conclusions and recommendations are presented based on the results of the analysis.."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/selectingplannin109457786"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["362 p."]},{"key":"dc:title","label":"Title","values":["Selecting, planning and scheduling specifications for construction projects"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Popescu, Calin M.","Hass, Carl T."],"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Ballast, Leaf Aquilla"],"dc:date.accessioned":["2012-08-09T18:48:11Z"],"dc:date.available":["2012-08-09T18:48:11Z"],"dc:date.issued":["2000-05"],"dc:description.abstract":["This thesis analyzes the effect of contract remuneration type and project complexity on the desirability of planning and scheduling specification clauses for construction projects. The information in this thesis is based on the analysis of responses to a survey that was sent to randomly selected construction companies, large owners, and various Naval Facilities Engineering Commands. For the survey, traditional definitions of lump sum and cost reimbursable contracts were used, and an easily quantifiable project complexity rating was developed. The analysis provides practical insights on which planning and scheduling specification clauses should be included for projects of different complexities and remuneration types. It also provides valuable insights on the differences in how contractors and owners view each planning and scheduling specification clause. Conclusions and recommendations are presented based on the results of the analysis.."],"dc:description.uri":["http://archive.org/details/selectingplannin109457786"],"dc:format.extent":["362 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/7786"],"dc:publisher":["University of Texas at Austin"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Selecting, planning and scheduling specifications for construction projects"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Engineering"],"thesis:institution_name":["University of Texas at Austin"]},"updated_at":"2026-11-19T06:44:00Z"}