{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7799"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7799","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A study of the processes, methjods and techniques used in negotiated or Best Value procurements of construction services","abstract":"An important part of the construction process is awarding the contract to perform the construction in a timely manner to a qualified contractor. The owner must choose a delivery method and a selection method. The four basic delivery methods are: Traditional Design-Bid-Build, Construction Management, Design-Build, and Design-Build-Operate-Transfer and the two most commonly used selection methods are Invitation to Bid and Request for Proposal (Source Selection). The method that will give the owner the most flexibility in selecting the most qualified contractor is the Request for Proposal or Source Selection Process. There are several basic steps in the Source Selection Process that ultimately lead to the selection of the \"Best Value\" Offeror. In the private industry the steps are left to the discretion of the individual owners. For Government Agencies there are applicable rules and regulations that apply and must be followed. In either case, the basic framework of the process is the same for both private and Government \"owners\". The primary difference is that private owners can enter into contractual relationships in any matter they choose as long as it is not fraudulent and therefore do not run the risk of the process being stopped by a protest. On the other hand, the Government runs the risk of the process being stopped by a protest and must follow all the prescribed rules, regulations, and procedures to mitigate this risk. The most important step in the Source Selection Process is developing Evaluation Factors and Subfactors because this will ultimately determine the ease and cost of proposal preparation for the offerors and the ease of evaluating proposals for the evaluation team. The second most important step is the consistent evaluation of the proposals received. No matter how complex the evaluation factors are if the evaluators evaluate the proposals consistently and adequately document their findings the probability of a successful protest will be significantly reduced. The Source Selection Process is the best available process to get the \"best value\" possible for any owner organization. It helps force contractors who want to continue to win contracts to care about their performance ratings on projects, helps reduce the adversarial relationships between the owner and the contractor, and in the end results in an overall higher quality project that is much easier to administer.","abstract_html":"An important part of the construction process is awarding the contract to perform the construction in a timely manner to a qualified contractor. The owner must choose a delivery method and a selection method. The four basic delivery methods are: Traditional Design-Bid-Build, Construction Management, Design-Build, and Design-Build-Operate-Transfer and the two most commonly used selection methods are Invitation to Bid and Request for Proposal (Source Selection). The method that will give the owner the most flexibility in selecting the most qualified contractor is the Request for Proposal or Source Selection Process. There are several basic steps in the Source Selection Process that ultimately lead to the selection of the &quot;Best Value&quot; Offeror. In the private industry the steps are left to the discretion of the individual owners. For Government Agencies there are applicable rules and regulations that apply and must be followed. In either case, the basic framework of the process is the same for both private and Government &quot;owners&quot;. The primary difference is that private owners can enter into contractual relationships in any matter they choose as long as it is not fraudulent and therefore do not run the risk of the process being stopped by a protest. On the other hand, the Government runs the risk of the process being stopped by a protest and must follow all the prescribed rules, regulations, and procedures to mitigate this risk. The most important step in the Source Selection Process is developing Evaluation Factors and Subfactors because this will ultimately determine the ease and cost of proposal preparation for the offerors and the ease of evaluating proposals for the evaluation team. The second most important step is the consistent evaluation of the proposals received. No matter how complex the evaluation factors are if the evaluators evaluate the proposals consistently and adequately document their findings the probability of a successful protest will be significantly reduced. The Source Selection Process is the best available process to get the &quot;best value&quot; possible for any owner organization. It helps force contractors who want to continue to win contracts to care about their performance ratings on projects, helps reduce the adversarial relationships between the owner and the contractor, and in the end results in an overall higher quality project that is much easier to administer.","abstract_has_math":false,"creators":["Schilling, Leonard C."],"institution":"University of Florida","degree_name":"Master of Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2000,"date_issued":"2000-09","date_published":"2000-09","updated_at":"2026-11-19T06:44:00Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o640954636"],"render_values":[{"text":"o640954636","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7799","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7799","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7799","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Schilling, Leonard C."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T18:48:16Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T18:48:16Z"]},{"key":"dc:date.issued","label":"Date","values":["2000-09"]},{"key":"dc:publisher","label":"Institution","values":["University of Florida"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Florida"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o640954636"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7799"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["An important part of the construction process is awarding the contract to perform the construction in a timely manner to a qualified contractor. The owner must choose a delivery method and a selection method. The four basic delivery methods are: Traditional Design-Bid-Build, Construction Management, Design-Build, and Design-Build-Operate-Transfer and the two most commonly used selection methods are Invitation to Bid and Request for Proposal (Source Selection). The method that will give the owner the most flexibility in selecting the most qualified contractor is the Request for Proposal or Source Selection Process. There are several basic steps in the Source Selection Process that ultimately lead to the selection of the \"Best Value\" Offeror. In the private industry the steps are left to the discretion of the individual owners. For Government Agencies there are applicable rules and regulations that apply and must be followed. In either case, the basic framework of the process is the same for both private and Government \"owners\". The primary difference is that private owners can enter into contractual relationships in any matter they choose as long as it is not fraudulent and therefore do not run the risk of the process being stopped by a protest. On the other hand, the Government runs the risk of the process being stopped by a protest and must follow all the prescribed rules, regulations, and procedures to mitigate this risk. The most important step in the Source Selection Process is developing Evaluation Factors and Subfactors because this will ultimately determine the ease and cost of proposal preparation for the offerors and the ease of evaluating proposals for the evaluation team. The second most important step is the consistent evaluation of the proposals received. No matter how complex the evaluation factors are if the evaluators evaluate the proposals consistently and adequately document their findings the probability of a successful protest will be significantly reduced. The Source Selection Process is the best available process to get the \"best value\" possible for any owner organization. It helps force contractors who want to continue to win contracts to care about their performance ratings on projects, helps reduce the adversarial relationships between the owner and the contractor, and in the end results in an overall higher quality project that is much easier to administer."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/astudyofprocesse109457799"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["69 p."]},{"key":"dc:title","label":"Title","values":["A study of the processes, methjods and techniques used in negotiated or Best Value procurements of construction services"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Schilling, Leonard C."],"dc:date.accessioned":["2012-08-09T18:48:16Z"],"dc:date.available":["2012-08-09T18:48:16Z"],"dc:date.issued":["2000-09"],"dc:description.abstract":["An important part of the construction process is awarding the contract to perform the construction in a timely manner to a qualified contractor. The owner must choose a delivery method and a selection method. The four basic delivery methods are: Traditional Design-Bid-Build, Construction Management, Design-Build, and Design-Build-Operate-Transfer and the two most commonly used selection methods are Invitation to Bid and Request for Proposal (Source Selection). The method that will give the owner the most flexibility in selecting the most qualified contractor is the Request for Proposal or Source Selection Process. There are several basic steps in the Source Selection Process that ultimately lead to the selection of the \"Best Value\" Offeror. In the private industry the steps are left to the discretion of the individual owners. For Government Agencies there are applicable rules and regulations that apply and must be followed. In either case, the basic framework of the process is the same for both private and Government \"owners\". The primary difference is that private owners can enter into contractual relationships in any matter they choose as long as it is not fraudulent and therefore do not run the risk of the process being stopped by a protest. On the other hand, the Government runs the risk of the process being stopped by a protest and must follow all the prescribed rules, regulations, and procedures to mitigate this risk. The most important step in the Source Selection Process is developing Evaluation Factors and Subfactors because this will ultimately determine the ease and cost of proposal preparation for the offerors and the ease of evaluating proposals for the evaluation team. The second most important step is the consistent evaluation of the proposals received. No matter how complex the evaluation factors are if the evaluators evaluate the proposals consistently and adequately document their findings the probability of a successful protest will be significantly reduced. The Source Selection Process is the best available process to get the \"best value\" possible for any owner organization. It helps force contractors who want to continue to win contracts to care about their performance ratings on projects, helps reduce the adversarial relationships between the owner and the contractor, and in the end results in an overall higher quality project that is much easier to administer."],"dc:description.uri":["http://archive.org/details/astudyofprocesse109457799"],"dc:format.extent":["69 p."],"dc:identifier.oclc":["o640954636"],"dc:identifier.uri":["https://hdl.handle.net/10945/7799"],"dc:publisher":["University of Florida"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["A study of the processes, methjods and techniques used in negotiated or Best Value procurements of construction services"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Engineering"],"thesis:institution_name":["University of Florida"]},"updated_at":"2026-11-19T06:44:00Z"}