{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7831"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7831","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Warranty/cannibalization issues, disruptive forces in the production and maintainability of the E-2C aircraft","abstract":"This thesis analyzes manufactures' warranties and cannibalization issues as they affect the maintainability on the E-2C aircraft. The analysis includes cannibalization structures, reasons why squadrons cannibalize, alternatives to cannibalization, cannibalization issues that affect maintenance personnel morale, and the disruptive effects of manufacturers' warranties to the fleet. The research identified that introducing production aircraft to the fleet without proper logistical support increases aircraft cannibalization and decreases maintainability. Cannibalization should not be used to increase aircraft readiness, since it doubles maintenance man-hours and depletes resources. Inconsistent Aviation Maintenance and Material Management (AV-3M) data contributes to aircraft cannibalization. An acquisition strategy that identifies logistics problems early will give the logistician an opportunity to decrease cannibalization","abstract_html":"This thesis analyzes manufactures&#x27; warranties and cannibalization issues as they affect the maintainability on the E-2C aircraft. The analysis includes cannibalization structures, reasons why squadrons cannibalize, alternatives to cannibalization, cannibalization issues that affect maintenance personnel morale, and the disruptive effects of manufacturers&#x27; warranties to the fleet. The research identified that introducing production aircraft to the fleet without proper logistical support increases aircraft cannibalization and decreases maintainability. Cannibalization should not be used to increase aircraft readiness, since it doubles maintenance man-hours and depletes resources. Inconsistent Aviation Maintenance and Material Management (AV-3M) data contributes to aircraft cannibalization. An acquisition strategy that identifies logistics problems early will give the logistician an opportunity to decrease cannibalization","abstract_has_math":false,"creators":["Jacobs, Brian K."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Boudreau, Michael W.","Gates, William R."],"committee_chairs":[],"committee_members":[],"year":2000,"date_issued":"2000-06","date_published":"2000-06","updated_at":"2026-11-26T00:21:31Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7831","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7831","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F7831","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7831","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Boudreau, Michael W.","Gates, William R."]},{"key":"dc:creator","label":"Author","values":["Jacobs, Brian K."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T18:48:29Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T18:48:29Z"]},{"key":"dc:date.issued","label":"Date","values":["2000-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Manufacturer warranties","Cannibalization","Maintenance"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7831"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis analyzes manufactures' warranties and cannibalization issues as they affect the maintainability on the E-2C aircraft. The analysis includes cannibalization structures, reasons why squadrons cannibalize, alternatives to cannibalization, cannibalization issues that affect maintenance personnel morale, and the disruptive effects of manufacturers' warranties to the fleet. The research identified that introducing production aircraft to the fleet without proper logistical support increases aircraft cannibalization and decreases maintainability. Cannibalization should not be used to increase aircraft readiness, since it doubles maintenance man-hours and depletes resources. Inconsistent Aviation Maintenance and Material Management (AV-3M) data contributes to aircraft cannibalization. An acquisition strategy that identifies logistics problems early will give the logistician an opportunity to decrease cannibalization"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/warrantycannibal109457831"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["viii, 64 p., 28 cm."]},{"key":"dc:title","label":"Title","values":["Warranty/cannibalization issues, disruptive forces in the production and maintainability of the E-2C aircraft"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Boudreau, Michael W.","Gates, William R."],"dc:creator":["Jacobs, Brian K."],"dc:date.accessioned":["2012-08-09T18:48:29Z"],"dc:date.available":["2012-08-09T18:48:29Z"],"dc:date.issued":["2000-06"],"dc:description.abstract":["This thesis analyzes manufactures' warranties and cannibalization issues as they affect the maintainability on the E-2C aircraft. The analysis includes cannibalization structures, reasons why squadrons cannibalize, alternatives to cannibalization, cannibalization issues that affect maintenance personnel morale, and the disruptive effects of manufacturers' warranties to the fleet. The research identified that introducing production aircraft to the fleet without proper logistical support increases aircraft cannibalization and decreases maintainability. Cannibalization should not be used to increase aircraft readiness, since it doubles maintenance man-hours and depletes resources. Inconsistent Aviation Maintenance and Material Management (AV-3M) data contributes to aircraft cannibalization. An acquisition strategy that identifies logistics problems early will give the logistician an opportunity to decrease cannibalization"],"dc:description.uri":["http://archive.org/details/warrantycannibal109457831"],"dc:format.extent":["viii, 64 p., 28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/7831"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Manufacturer warranties","Cannibalization","Maintenance"],"dc:title":["Warranty/cannibalization issues, disruptive forces in the production and maintainability of the E-2C aircraft"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:21:31Z"}