{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7848"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7848","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Acquisition reform: impact of conversion to performance and commercial specifications/standards on the Chemical Stockpile Disposal Program","abstract":"The Chemical Stockpile Disposal Program (CSDP) was established to plan and execute the safe destruction of the nation's stockpile of unitary chemical weapons. The CSDP is unique in that it is not a weapon system production program but, a weapon system destruction program with a mandated completion date of December 31, 2004. Execution of the program requires that multiple public issues be addressed including the public's concern regarding safety and the environment. Cost growth and Environmental Protection Agency (EPA) permit delays have jeopardized on time completion within life cycle cost estimates. Another relevant issue is reform of the acquisition process, specifically the DoD requirement to convert military-unique specifications and standards to performance statements or commercial equivalents. This research provides evidence that acquisition reform initiatives on specifications and standards has had a positive influence on program costs with no overall program schedule delays. Continued efforts in this area should enhance the ability to demilitarize the nation's deteriorating stockpile of lethal chemical weapons within projected cost while maintaining or improving the quality and safety levels currently set by the EPA. The specific recommendations provided herein are intended to assist in improving program effectiveness and efficiency.","abstract_html":"The Chemical Stockpile Disposal Program (CSDP) was established to plan and execute the safe destruction of the nation&#x27;s stockpile of unitary chemical weapons. The CSDP is unique in that it is not a weapon system production program but, a weapon system destruction program with a mandated completion date of December 31, 2004. Execution of the program requires that multiple public issues be addressed including the public&#x27;s concern regarding safety and the environment. Cost growth and Environmental Protection Agency (EPA) permit delays have jeopardized on time completion within life cycle cost estimates. Another relevant issue is reform of the acquisition process, specifically the DoD requirement to convert military-unique specifications and standards to performance statements or commercial equivalents. This research provides evidence that acquisition reform initiatives on specifications and standards has had a positive influence on program costs with no overall program schedule delays. Continued efforts in this area should enhance the ability to demilitarize the nation&#x27;s deteriorating stockpile of lethal chemical weapons within projected cost while maintaining or improving the quality and safety levels currently set by the EPA. The specific recommendations provided herein are intended to assist in improving program effectiveness and efficiency.","abstract_has_math":false,"creators":["Crisp, Sandra S."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master Of Science In Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Systems Management (SM)","school":null,"contributors":[],"advisors":["Jones, Larry","Desbrow, Sandra M."],"committee_chairs":[],"committee_members":[],"year":1996,"date_issued":"1996-06","date_published":"1996-06","updated_at":"2026-11-19T06:44:00Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7848","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7848","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F7848","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7848","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Jones, Larry","Desbrow, Sandra M."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Management (SM)"]},{"key":"dc:creator","label":"Author","values":["Crisp, Sandra S."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:16:46Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:16:46Z"]},{"key":"dc:date.issued","label":"Date","values":["1996-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["99e7122d-1087-4a1e-9101-70cbd0e9f56b"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master Of Science In Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Acquisition reform","Chemical stockpile","Chemical stockpile disposal program","Specifications and standards","Commercial specifications and standards"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7848"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Chemical Stockpile Disposal Program (CSDP) was established to plan and execute the safe destruction of the nation's stockpile of unitary chemical weapons. The CSDP is unique in that it is not a weapon system production program but, a weapon system destruction program with a mandated completion date of December 31, 2004. Execution of the program requires that multiple public issues be addressed including the public's concern regarding safety and the environment. Cost growth and Environmental Protection Agency (EPA) permit delays have jeopardized on time completion within life cycle cost estimates. Another relevant issue is reform of the acquisition process, specifically the DoD requirement to convert military-unique specifications and standards to performance statements or commercial equivalents. This research provides evidence that acquisition reform initiatives on specifications and standards has had a positive influence on program costs with no overall program schedule delays. Continued efforts in this area should enhance the ability to demilitarize the nation's deteriorating stockpile of lethal chemical weapons within projected cost while maintaining or improving the quality and safety levels currently set by the EPA. The specific recommendations provided herein are intended to assist in improving program effectiveness and efficiency."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/acquisitionrefor109457848"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["132 p."]},{"key":"dc:title","label":"Title","values":["Acquisition reform: impact of conversion to performance and commercial specifications/standards on the Chemical Stockpile Disposal Program"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Headquarters, Industrial Operations Command"]}]}],"canonical_facts":{"dc:contributor.advisor":["Jones, Larry","Desbrow, Sandra M."],"dc:contributor.department":["Systems Management (SM)"],"dc:creator":["Crisp, Sandra S."],"dc:date.accessioned":["2012-08-09T19:16:46Z"],"dc:date.available":["2012-08-09T19:16:46Z"],"dc:date.issued":["1996-06"],"dc:description.abstract":["The Chemical Stockpile Disposal Program (CSDP) was established to plan and execute the safe destruction of the nation's stockpile of unitary chemical weapons. The CSDP is unique in that it is not a weapon system production program but, a weapon system destruction program with a mandated completion date of December 31, 2004. Execution of the program requires that multiple public issues be addressed including the public's concern regarding safety and the environment. Cost growth and Environmental Protection Agency (EPA) permit delays have jeopardized on time completion within life cycle cost estimates. Another relevant issue is reform of the acquisition process, specifically the DoD requirement to convert military-unique specifications and standards to performance statements or commercial equivalents. This research provides evidence that acquisition reform initiatives on specifications and standards has had a positive influence on program costs with no overall program schedule delays. Continued efforts in this area should enhance the ability to demilitarize the nation's deteriorating stockpile of lethal chemical weapons within projected cost while maintaining or improving the quality and safety levels currently set by the EPA. The specific recommendations provided herein are intended to assist in improving program effectiveness and efficiency."],"dc:description.uri":["http://archive.org/details/acquisitionrefor109457848"],"dc:format.extent":["132 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/7848"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["99e7122d-1087-4a1e-9101-70cbd0e9f56b"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Acquisition reform","Chemical stockpile","Chemical stockpile disposal program","Specifications and standards","Commercial specifications and standards"],"dc:title":["Acquisition reform: impact of conversion to performance and commercial specifications/standards on the Chemical Stockpile Disposal Program"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Headquarters, Industrial Operations Command"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master Of Science In Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:44:00Z"}