{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7867"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7867","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Allocation of risk through construction contract provisions and practice","abstract":"General conditions used by forty-four owners when contracting for construction services were obtained and studied for risk allocation techniques. Additionally, interviews were conducted with twenty-five construction professionals to study how risk is allocated during actual project completion. The study provides a broad view of risk allocation techniques used in specific clauses and of risk allocation in actual practice. The study does not profile the prevalence of risk allocation between contractor and owner, rather, the sole purpose of the study is to identify common contract provisions where risk allocation varies and actual practices that place varying amounts of risk on contractors.","abstract_html":"General conditions used by forty-four owners when contracting for construction services were obtained and studied for risk allocation techniques. Additionally, interviews were conducted with twenty-five construction professionals to study how risk is allocated during actual project completion. The study provides a broad view of risk allocation techniques used in specific clauses and of risk allocation in actual practice. The study does not profile the prevalence of risk allocation between contractor and owner, rather, the sole purpose of the study is to identify common contract provisions where risk allocation varies and actual practices that place varying amounts of risk on contractors.","abstract_has_math":false,"creators":["McClelland, Troy M."],"institution":"University of Washington","degree_name":"Master of Science","degree_level":"Masters","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Hinze, Jimmie"],"committee_chairs":[],"committee_members":[],"year":1996,"date_issued":"1996","date_published":"1996","updated_at":"2026-11-19T06:44:00Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640448110"],"render_values":[{"text":"ocn640448110","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7867","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7867","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F7867","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7867","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Hinze, Jimmie"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["McClelland, Troy M."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:16:57Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:16:57Z"]},{"key":"dc:date.issued","label":"Date","values":["1996"]},{"key":"dc:publisher","label":"Institution","values":["University of Washington"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Washington"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640448110"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7867"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["General conditions used by forty-four owners when contracting for construction services were obtained and studied for risk allocation techniques. Additionally, interviews were conducted with twenty-five construction professionals to study how risk is allocated during actual project completion. The study provides a broad view of risk allocation techniques used in specific clauses and of risk allocation in actual practice. The study does not profile the prevalence of risk allocation between contractor and owner, rather, the sole purpose of the study is to identify common contract provisions where risk allocation varies and actual practices that place varying amounts of risk on contractors."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/allocationofrisk109457867"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["134 p."]},{"key":"dc:title","label":"Title","values":["Allocation of risk through construction contract provisions and practice"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Hinze, Jimmie"],"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["McClelland, Troy M."],"dc:date.accessioned":["2012-08-09T19:16:57Z"],"dc:date.available":["2012-08-09T19:16:57Z"],"dc:date.issued":["1996"],"dc:description.abstract":["General conditions used by forty-four owners when contracting for construction services were obtained and studied for risk allocation techniques. Additionally, interviews were conducted with twenty-five construction professionals to study how risk is allocated during actual project completion. The study provides a broad view of risk allocation techniques used in specific clauses and of risk allocation in actual practice. The study does not profile the prevalence of risk allocation between contractor and owner, rather, the sole purpose of the study is to identify common contract provisions where risk allocation varies and actual practices that place varying amounts of risk on contractors."],"dc:description.uri":["http://archive.org/details/allocationofrisk109457867"],"dc:format.extent":["134 p."],"dc:identifier.oclc":["ocn640448110"],"dc:identifier.uri":["https://hdl.handle.net/10945/7867"],"dc:publisher":["University of Washington"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Allocation of risk through construction contract provisions and practice"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["University of Washington"]},"updated_at":"2026-11-19T06:44:00Z"}