{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/7934"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/7934","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis of modification types in Navy Construction Contracts","abstract":"Modifications, or change orders, in Navy construction contracts are a seemingly inevitable fact of life. In this report I analyzed nearly 8400 modifications in over 2200 completed Navy construction contracts from Southern Division of the Naval Facilities Engineering Command to identify the most frequent and expensive categories. Using the modification reason code, the modifications were divided into 20 categories and the effect of each of these categories was determined quantitatively. The data, which I found was not normally distributed, was run three ways: (1) Unadjusted; (2) Adjusted for planned or expected modifications; (3) Adjusted for planned or expected modifications and terminated contracts. The third way is the most representative of a \"typical\" contract and the modifications with the largest effect on contract price are: (1) Unforeseen Conditions, 2.65% increase over the total of all contract prices; (2) Design Changes, 1.82% increase; (3) Customer Requested Changes, 1.64% increase. Overall, modifications increased the average contract price by 7.78%, justifying the customary practice of including a 10% contingency in funding estimates. I also report on several problems in the use of modification reason codes that effect the analysis, though not significantly.","abstract_html":"Modifications, or change orders, in Navy construction contracts are a seemingly inevitable fact of life. In this report I analyzed nearly 8400 modifications in over 2200 completed Navy construction contracts from Southern Division of the Naval Facilities Engineering Command to identify the most frequent and expensive categories. Using the modification reason code, the modifications were divided into 20 categories and the effect of each of these categories was determined quantitatively. The data, which I found was not normally distributed, was run three ways: (1) Unadjusted; (2) Adjusted for planned or expected modifications; (3) Adjusted for planned or expected modifications and terminated contracts. The third way is the most representative of a &quot;typical&quot; contract and the modifications with the largest effect on contract price are: (1) Unforeseen Conditions, 2.65% increase over the total of all contract prices; (2) Design Changes, 1.82% increase; (3) Customer Requested Changes, 1.64% increase. Overall, modifications increased the average contract price by 7.78%, justifying the customary practice of including a 10% contingency in funding estimates. I also report on several problems in the use of modification reason codes that effect the analysis, though not significantly.","abstract_has_math":false,"creators":["Prout, William J."],"institution":"University of Florida","degree_name":"Master of Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1998,"date_issued":"1998","date_published":"1998","updated_at":"2026-11-19T06:44:00Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640501466"],"render_values":[{"text":"ocn640501466","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/7934","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/7934","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F7934","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Prout, William J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:17:30Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:17:30Z"]},{"key":"dc:date.issued","label":"Date","values":["1998"]},{"key":"dc:publisher","label":"Institution","values":["University of Florida"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Florida"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640501466"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/7934"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Modifications, or change orders, in Navy construction contracts are a seemingly inevitable fact of life. In this report I analyzed nearly 8400 modifications in over 2200 completed Navy construction contracts from Southern Division of the Naval Facilities Engineering Command to identify the most frequent and expensive categories. Using the modification reason code, the modifications were divided into 20 categories and the effect of each of these categories was determined quantitatively. The data, which I found was not normally distributed, was run three ways: (1) Unadjusted; (2) Adjusted for planned or expected modifications; (3) Adjusted for planned or expected modifications and terminated contracts. The third way is the most representative of a \"typical\" contract and the modifications with the largest effect on contract price are: (1) Unforeseen Conditions, 2.65% increase over the total of all contract prices; (2) Design Changes, 1.82% increase; (3) Customer Requested Changes, 1.64% increase. Overall, modifications increased the average contract price by 7.78%, justifying the customary practice of including a 10% contingency in funding estimates. I also report on several problems in the use of modification reason codes that effect the analysis, though not significantly."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisofmodifi109457934"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["34 p."]},{"key":"dc:title","label":"Title","values":["Analysis of modification types in Navy Construction Contracts"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Prout, William J."],"dc:date.accessioned":["2012-08-09T19:17:30Z"],"dc:date.available":["2012-08-09T19:17:30Z"],"dc:date.issued":["1998"],"dc:description.abstract":["Modifications, or change orders, in Navy construction contracts are a seemingly inevitable fact of life. In this report I analyzed nearly 8400 modifications in over 2200 completed Navy construction contracts from Southern Division of the Naval Facilities Engineering Command to identify the most frequent and expensive categories. Using the modification reason code, the modifications were divided into 20 categories and the effect of each of these categories was determined quantitatively. The data, which I found was not normally distributed, was run three ways: (1) Unadjusted; (2) Adjusted for planned or expected modifications; (3) Adjusted for planned or expected modifications and terminated contracts. The third way is the most representative of a \"typical\" contract and the modifications with the largest effect on contract price are: (1) Unforeseen Conditions, 2.65% increase over the total of all contract prices; (2) Design Changes, 1.82% increase; (3) Customer Requested Changes, 1.64% increase. Overall, modifications increased the average contract price by 7.78%, justifying the customary practice of including a 10% contingency in funding estimates. I also report on several problems in the use of modification reason codes that effect the analysis, though not significantly."],"dc:description.uri":["http://archive.org/details/analysisofmodifi109457934"],"dc:format.extent":["34 p."],"dc:identifier.oclc":["ocn640501466"],"dc:identifier.uri":["https://hdl.handle.net/10945/7934"],"dc:publisher":["University of Florida"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Analysis of modification types in Navy Construction Contracts"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Engineering"],"thesis:institution_name":["University of Florida"]},"updated_at":"2026-11-19T06:44:00Z"}