{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8038"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8038","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Budgeting for environmental clean-up of Army bases","abstract":"The United States Army obtained congressional approval in 1995 to close or realign 40 installations. These actions create a unique opportunity for the civilian communities surrounding the installations to reuse them to satisfy commercial or community needs. However, future reuse can be impeded by the need for environmental clean-up, which is an expensive business. The current clean-up cost estimate for 32 of the 40 installations is $1 billion from 1996 to 2001. This thesis develops an optimization model with a spreadsheet interface to help plan distribution of yearly environmental clean-up budgets. The model picks from supplied alternatives the clean-up level for each area within each installation that provides the greatest benefit for reuse while adhering to yearly budgets. To measure benefit this thesis develops a linear value model that quantifies the qualitative factors that provide benefit to a community. Extensive computational testing using Army and hypothetical data demonstrates how the model can help the Army effectively allocate their budget.","abstract_html":"The United States Army obtained congressional approval in 1995 to close or realign 40 installations. These actions create a unique opportunity for the civilian communities surrounding the installations to reuse them to satisfy commercial or community needs. However, future reuse can be impeded by the need for environmental clean-up, which is an expensive business. The current clean-up cost estimate for 32 of the 40 installations is $1 billion from 1996 to 2001. This thesis develops an optimization model with a spreadsheet interface to help plan distribution of yearly environmental clean-up budgets. The model picks from supplied alternatives the clean-up level for each area within each installation that provides the greatest benefit for reuse while adhering to yearly budgets. To measure benefit this thesis develops a linear value model that quantifies the qualitative factors that provide benefit to a community. Extensive computational testing using Army and hypothetical data demonstrates how the model can help the Army effectively allocate their budget.","abstract_has_math":false,"creators":["Goette, Herbert"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Department of Operations Research","school":null,"contributors":[],"advisors":["Dell, Robert F."],"committee_chairs":[],"committee_members":["Rosenthal, Richard E."],"year":1996,"date_issued":"1996-09","date_published":"1996-09","updated_at":"2026-11-26T00:10:06Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8038","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8038","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F8038","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8038","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dell, Robert F."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Rosenthal, Richard E."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Operations Research"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Goette, Herbert"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September 1996"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:18:20Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:18:20Z"]},{"key":"dc:date.issued","label":"Date","values":["1996-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Optimization","Mixed integer linear programming","Budget allocation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8038"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The United States Army obtained congressional approval in 1995 to close or realign 40 installations. These actions create a unique opportunity for the civilian communities surrounding the installations to reuse them to satisfy commercial or community needs. However, future reuse can be impeded by the need for environmental clean-up, which is an expensive business. The current clean-up cost estimate for 32 of the 40 installations is $1 billion from 1996 to 2001. This thesis develops an optimization model with a spreadsheet interface to help plan distribution of yearly environmental clean-up budgets. The model picks from supplied alternatives the clean-up level for each area within each installation that provides the greatest benefit for reuse while adhering to yearly budgets. To measure benefit this thesis develops a linear value model that quantifies the qualitative factors that provide benefit to a community. Extensive computational testing using Army and hypothetical data demonstrates how the model can help the Army effectively allocate their budget."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/budgetingforenvi109458038"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["x, 60 p."]},{"key":"dc:title","label":"Title","values":["Budgeting for environmental clean-up of Army bases"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, German Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dell, Robert F."],"dc:contributor.committeemember":["Rosenthal, Richard E."],"dc:contributor.department":["Department of Operations Research"],"dc:contributor.other":["Naval Postgraduate School"],"dc:creator":["Goette, Herbert"],"dc:date":["September 1996"],"dc:date.accessioned":["2012-08-09T19:18:20Z"],"dc:date.available":["2012-08-09T19:18:20Z"],"dc:date.issued":["1996-09"],"dc:description.abstract":["The United States Army obtained congressional approval in 1995 to close or realign 40 installations. These actions create a unique opportunity for the civilian communities surrounding the installations to reuse them to satisfy commercial or community needs. However, future reuse can be impeded by the need for environmental clean-up, which is an expensive business. The current clean-up cost estimate for 32 of the 40 installations is $1 billion from 1996 to 2001. This thesis develops an optimization model with a spreadsheet interface to help plan distribution of yearly environmental clean-up budgets. The model picks from supplied alternatives the clean-up level for each area within each installation that provides the greatest benefit for reuse while adhering to yearly budgets. To measure benefit this thesis develops a linear value model that quantifies the qualitative factors that provide benefit to a community. Extensive computational testing using Army and hypothetical data demonstrates how the model can help the Army effectively allocate their budget."],"dc:description.uri":["http://archive.org/details/budgetingforenvi109458038"],"dc:format.extent":["x, 60 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/8038"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Optimization","Mixed integer linear programming","Budget allocation"],"dc:title":["Budgeting for environmental clean-up of Army bases"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, German Army"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:10:06Z"}