{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8171"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8171","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Costs and benefits of software process improvement","abstract":"There are numerous problems in DoD software development projects. The ad hoc practices used in the military services and in industry have resulted in unpredictable costs and schedules and low-quality products. This thesis proposes that one solution to these problems is to integrate Software Process Improvement (SPI) activities based on a proven model into software development projects. Both a formal and an informal approach to SPI will be discussed. The thesis will also describe not only the problems encountered in most software development projects, but also the activities defined in these SPI approaches that are designed to solve these problems. A case study of a military project that has spent several years implementing SPI activities based on Software Engineering Institute's (SEI) Capability Maturity Model (CMM) is presented. The SPI activities were implemented in an effort to deliver a high quality product with high reliability while maintaining a high level of control of costs and schedule. This project has succeeded in its goals and the costs and benefits of the project's efforts will be presented","abstract_html":"There are numerous problems in DoD software development projects. The ad hoc practices used in the military services and in industry have resulted in unpredictable costs and schedules and low-quality products. This thesis proposes that one solution to these problems is to integrate Software Process Improvement (SPI) activities based on a proven model into software development projects. Both a formal and an informal approach to SPI will be discussed. The thesis will also describe not only the problems encountered in most software development projects, but also the activities defined in these SPI approaches that are designed to solve these problems. A case study of a military project that has spent several years implementing SPI activities based on Software Engineering Institute&#x27;s (SEI) Capability Maturity Model (CMM) is presented. The SPI activities were implemented in an effort to deliver a high quality product with high reliability while maintaining a high level of control of costs and schedule. This project has succeeded in its goals and the costs and benefits of the project&#x27;s efforts will be presented","abstract_has_math":false,"creators":["Prenger, Karen D."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Software Engineering","degree_level":"Masters","degree_discipline":"Software Engineering","degree_department":"Computer Science","school":null,"contributors":[],"advisors":["Emery, James","Gramoy, Elizabeth"],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997-12","date_published":"1997-12","updated_at":"2026-11-19T06:44:14Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8171","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8171","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F8171","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8171","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Emery, James","Gramoy, Elizabeth"]},{"key":"dc:contributor.department","label":"Department","values":["Computer Science"]},{"key":"dc:creator","label":"Author","values":["Prenger, Karen D."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:19:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:19:12Z"]},{"key":"dc:date.issued","label":"Date","values":["1997-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Software Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Software Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Software Process Improvement","Software Engineering Institute's Capacity Maturity Model","SmartNet Project","Rapid Application Development"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8171"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["There are numerous problems in DoD software development projects. The ad hoc practices used in the military services and in industry have resulted in unpredictable costs and schedules and low-quality products. This thesis proposes that one solution to these problems is to integrate Software Process Improvement (SPI) activities based on a proven model into software development projects. Both a formal and an informal approach to SPI will be discussed. The thesis will also describe not only the problems encountered in most software development projects, but also the activities defined in these SPI approaches that are designed to solve these problems. A case study of a military project that has spent several years implementing SPI activities based on Software Engineering Institute's (SEI) Capability Maturity Model (CMM) is presented. The SPI activities were implemented in an effort to deliver a high quality product with high reliability while maintaining a high level of control of costs and schedule. This project has succeeded in its goals and the costs and benefits of the project's efforts will be presented"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/costsndbenefitso109458171"]},{"key":"dc:title","label":"Title","values":["Costs and benefits of software process improvement"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Emery, James","Gramoy, Elizabeth"],"dc:contributor.department":["Computer Science"],"dc:creator":["Prenger, Karen D."],"dc:date.accessioned":["2012-08-09T19:19:12Z"],"dc:date.available":["2012-08-09T19:19:12Z"],"dc:date.issued":["1997-12"],"dc:description.abstract":["There are numerous problems in DoD software development projects. The ad hoc practices used in the military services and in industry have resulted in unpredictable costs and schedules and low-quality products. This thesis proposes that one solution to these problems is to integrate Software Process Improvement (SPI) activities based on a proven model into software development projects. Both a formal and an informal approach to SPI will be discussed. The thesis will also describe not only the problems encountered in most software development projects, but also the activities defined in these SPI approaches that are designed to solve these problems. A case study of a military project that has spent several years implementing SPI activities based on Software Engineering Institute's (SEI) Capability Maturity Model (CMM) is presented. The SPI activities were implemented in an effort to deliver a high quality product with high reliability while maintaining a high level of control of costs and schedule. This project has succeeded in its goals and the costs and benefits of the project's efforts will be presented"],"dc:description.uri":["http://archive.org/details/costsndbenefitso109458171"],"dc:identifier.uri":["https://hdl.handle.net/10945/8171"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Software Process Improvement","Software Engineering Institute's Capacity Maturity Model","SmartNet Project","Rapid Application Development"],"dc:title":["Costs and benefits of software process improvement"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Software Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Software Engineering"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:44:14Z"}