{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8208"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8208","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Design-build contracting in the Navy","abstract":"In the 1970's and 1980's, the Federal Government, especially the United States Military, did not have to worry about funding constraints. During this time, the United States and the Soviet Union were in the middle of the Cold War, racing to build up their military strength. Now that the Cold War is over, the United States Government is faced with a declining budget and smaller military force. Even with a reduced budget, the Government must continue to maintain and operate military facilities around the world. In order to accomplish this, the Government must be more innovative and efficient like the civilian sector. Presently the construction industry is making a move towards design build contracts because of several factors; i.e. reduced costs, one party responsibility, and shorter time frames. With the implementation of the Federal Acquisition Reform Act of 1996, the Government is now using a two phase design build process that allows for the pre-qualification of contractors prior to submittal proposal and contract award. Southern Division (SOUTHDIV), Naval Facilities Engineering Command, located in Charleston, South Carolina has taken the two phase design build process one step further. SOUTHDIV has created the Design Build Order Contract (DBOC), which is a hybrid of the indefinite quantities (IDQ) contract and the two phase design build contract. This report will provide a better understanding of the Government's two phase design build and DBOC processes and also the current status of DBOC.","abstract_html":"In the 1970&#x27;s and 1980&#x27;s, the Federal Government, especially the United States Military, did not have to worry about funding constraints. During this time, the United States and the Soviet Union were in the middle of the Cold War, racing to build up their military strength. Now that the Cold War is over, the United States Government is faced with a declining budget and smaller military force. Even with a reduced budget, the Government must continue to maintain and operate military facilities around the world. In order to accomplish this, the Government must be more innovative and efficient like the civilian sector. Presently the construction industry is making a move towards design build contracts because of several factors; i.e. reduced costs, one party responsibility, and shorter time frames. With the implementation of the Federal Acquisition Reform Act of 1996, the Government is now using a two phase design build process that allows for the pre-qualification of contractors prior to submittal proposal and contract award. Southern Division (SOUTHDIV), Naval Facilities Engineering Command, located in Charleston, South Carolina has taken the two phase design build process one step further. SOUTHDIV has created the Design Build Order Contract (DBOC), which is a hybrid of the indefinite quantities (IDQ) contract and the two phase design build contract. This report will provide a better understanding of the Government&#x27;s two phase design build and DBOC processes and also the current status of DBOC.","abstract_has_math":false,"creators":["Murphy, Jay A."],"institution":"University of Florida","degree_name":"Master of Science in Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1999,"date_issued":"1999","date_published":"1999","updated_at":"2026-11-19T06:44:14Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640936958"],"render_values":[{"text":"ocn640936958","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8208","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8208","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F8208","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8208","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Murphy, Jay A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:19:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:19:25Z"]},{"key":"dc:date.issued","label":"Date","values":["1999"]},{"key":"dc:publisher","label":"Institution","values":["University of Florida"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Florida"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640936958"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8208"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In the 1970's and 1980's, the Federal Government, especially the United States Military, did not have to worry about funding constraints. During this time, the United States and the Soviet Union were in the middle of the Cold War, racing to build up their military strength. Now that the Cold War is over, the United States Government is faced with a declining budget and smaller military force. Even with a reduced budget, the Government must continue to maintain and operate military facilities around the world. In order to accomplish this, the Government must be more innovative and efficient like the civilian sector. Presently the construction industry is making a move towards design build contracts because of several factors; i.e. reduced costs, one party responsibility, and shorter time frames. With the implementation of the Federal Acquisition Reform Act of 1996, the Government is now using a two phase design build process that allows for the pre-qualification of contractors prior to submittal proposal and contract award. Southern Division (SOUTHDIV), Naval Facilities Engineering Command, located in Charleston, South Carolina has taken the two phase design build process one step further. SOUTHDIV has created the Design Build Order Contract (DBOC), which is a hybrid of the indefinite quantities (IDQ) contract and the two phase design build contract. This report will provide a better understanding of the Government's two phase design build and DBOC processes and also the current status of DBOC."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/designbuildcontr109458208"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["59 p."]},{"key":"dc:title","label":"Title","values":["Design-build contracting in the Navy"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Murphy, Jay A."],"dc:date.accessioned":["2012-08-09T19:19:25Z"],"dc:date.available":["2012-08-09T19:19:25Z"],"dc:date.issued":["1999"],"dc:description.abstract":["In the 1970's and 1980's, the Federal Government, especially the United States Military, did not have to worry about funding constraints. During this time, the United States and the Soviet Union were in the middle of the Cold War, racing to build up their military strength. Now that the Cold War is over, the United States Government is faced with a declining budget and smaller military force. Even with a reduced budget, the Government must continue to maintain and operate military facilities around the world. In order to accomplish this, the Government must be more innovative and efficient like the civilian sector. Presently the construction industry is making a move towards design build contracts because of several factors; i.e. reduced costs, one party responsibility, and shorter time frames. With the implementation of the Federal Acquisition Reform Act of 1996, the Government is now using a two phase design build process that allows for the pre-qualification of contractors prior to submittal proposal and contract award. Southern Division (SOUTHDIV), Naval Facilities Engineering Command, located in Charleston, South Carolina has taken the two phase design build process one step further. SOUTHDIV has created the Design Build Order Contract (DBOC), which is a hybrid of the indefinite quantities (IDQ) contract and the two phase design build contract. This report will provide a better understanding of the Government's two phase design build and DBOC processes and also the current status of DBOC."],"dc:description.uri":["http://archive.org/details/designbuildcontr109458208"],"dc:format.extent":["59 p."],"dc:identifier.oclc":["ocn640936958"],"dc:identifier.uri":["https://hdl.handle.net/10945/8208"],"dc:publisher":["University of Florida"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Design-build contracting in the Navy"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Engineering"],"thesis:institution_name":["University of Florida"]},"updated_at":"2026-11-19T06:44:14Z"}